95,143 research outputs found

    Modeling the Effect of a Road Construction Project on Transportation System Performance

    Get PDF
    Road construction projects create physical changes on roads that result in capacity reduction and travel time escalation during the construction project period. The reduction in the posted speed limit, the number of lanes, lane width and shoulder width at the construction zone makes it difficult for the road to accommodate high traffic volume. Therefore, the goal of this research is to model the effect of a road construction project on travel time at road link-level and help improve the mobility of people and goods through dissemination or implementation of proactive solutions. Data for a resurfacing construction project on I-485 in the city of Charlotte, North Carolina (NC) was used evaluation, analysis, and modeling. A statistical t-test was conducted to examine the relationship between the change in travel time before and during the construction project period. Further, travel time models were developed for the freeway links and the connecting arterial street links, both before and during the construction project period. The road network characteristics of each link, such as the volume/ capacity (V/C), the number of lanes, the speed limit, the shoulder width, the lane width, whether the link is divided or undivided, characteristics of neighboring links, the time-of-the-day, the day-of-the-week, and the distance of the link from the road construction project were considered as predictor variables for modeling. The results obtained indicate that a decrease in travel time was observed during the construction project period on the freeway links when compared to the before construction project period. Contrarily, an increase in travel time was observed during the construction project period on the connecting arterial street links when compared to the before construction project period. Also, the average travel time, the planning time, and the travel time index can better explain the effect of a road construction project on transportation system performance when compared to the planning time index and the buffer time index. The influence of predictor variables seem to vary before and during the construction project period on the freeway links and connecting arterial street links. Practitioners should take the research findings into consideration, in addition to the construction zone characteristics, when planning a road construction project and developing temporary traffic control and detour plans

    Resource dimensioning through buffer sampling

    Get PDF
    Link dimensioning, i.e., selecting a (minimal) link capacity such that the users’ performance requirements are met, is a crucial component of network design. It requires insight into the interrelationship among the traffic offered (in terms of the mean offered load , but also its fluctuation around the mean, i.e., ‘burstiness’), the envisioned performance level, and the capacity needed. We first derive, for different performance criteria, theoretical dimensioning formulas that estimate the required capacity cc as a function of the input traffic and the performance target. For the special case of Gaussian input traffic, these formulas reduce to c=M+αVc = M + \alpha V, where directly relates to the performance requirement (as agreed upon in a service level agreement) and VV reflects the burstiness (at the timescale of interest). We also observe that Gaussianity applies for virtually all realistic scenarios; notably, already for a relatively low aggregation level, the Gaussianity assumption is justified.\ud As estimating MM is relatively straightforward, the remaining open issue concerns the estimation of VV. We argue that particularly if corresponds to small time-scales, it may be inaccurate to estimate it directly from the traffic traces. Therefore, we propose an indirect method that samples the buffer content, estimates the buffer content distribution, and ‘inverts’ this to the variance. We validate the inversion through extensive numerical experiments (using a sizeable collection of traffic traces from various representative locations); the resulting estimate of VV is then inserted in the dimensioning formula. These experiments show that both the inversion and the dimensioning formula are remarkably accurate

    Implementation of Provably Stable MaxNet

    Get PDF
    MaxNet TCP is a congestion control protocol that uses explicit multi-bit signalling from routers to achieve desirable properties such as high throughput and low latency. In this paper we present an implementation of an extended version of MaxNet. Our contributions are threefold. First, we extend the original algorithm to give both provable stability and rate fairness. Second, we introduce the MaxStart algorithm which allows new MaxNet connections to reach their fair rates quickly. Third, we provide a Linux kernel implementation of the protocol. With no overhead but 24-bit price signals, our implementation scales from 32 bit/s to 1 peta-bit/s with a 0.001% rate accuracy. We confirm the theoretically predicted properties by performing a range of experiments at speeds up to 1 Gbit/sec and delays up to 180 ms on the WAN-in-Lab facility

    Resource dimensioning through buffer sampling

    Get PDF
    Link dimensioning, i.e., selecting a (minimal) link capacity such that the users’ performance requirements are met, is a crucial component of network design. It requires insight into the interrelationship between the traffic offered (in terms of the mean offered load M, but also its fluctuation around the mean, i.e., ‘burstiness’), the envisioned performance level, and the capacity needed. We first derive, for different performance criteria, theoretical dimensioning formulae that estimate the required capacity C as a function of the input traffic and the performance target. For the special case of Gaussian input traffic these formulae reduce to C = M+V , where directly relates to the performance requirement (as agreed upon in a service level agreement) and V reflects the burstiness (at the timescale of interest). We also observe that Gaussianity applies for virtually all realistic scenarios; notably, already for a relatively low aggregation level the Gaussianity assumption is justified.\ud As estimating M is relatively straightforward, the remaining open issue concerns the estimation of V . We argue that, particularly if V corresponds to small time-scales, it may be inaccurate to estimate it directly from the traffic traces. Therefore, we propose an indirect method that samples the buffer content, estimates the buffer content distribution, and ‘inverts’ this to the variance. We validate the inversion through extensive numerical experiments (using a sizeable collection of traffic traces from various representative locations); the resulting estimate of V is then inserted in the dimensioning formula. These experiments show that both the inversion and the dimensioning formula are remarkably accurate

    TCP over High Speed Variable Capacity Links: A Simulation Study for Bandwidth Allocation

    Get PDF
    New optical network technologies provide opportunities for fast, controllable bandwidth management. These technologies can now explicitly provide resources to data paths, creating demand driven bandwidth reservation across networks where an applications bandwidth needs can be meet almost exactly. Dynamic synchronous Transfer Mode (DTM) is a gigabit network technology that provides channels with dynamically adjustable capacity. TCP is a reliable end-to-end transport protocol that adapts its rate to the available capacity. Both TCP and the DTM bandwidth can react to changes in the network load, creating a complex system with inter-dependent feedback mechanisms. The contribution of this work is an assessment of a bandwidth allocation scheme for TCP flows on variable capacity technologies. We have created a simulation environment using ns-2 and our results indicate that the allocation of bandwidth maximises TCP throughput for most flows, thus saving valuable capacity when compared to a scheme such as link over-provisioning. We highlight one situation where the allocation scheme might have some deficiencies against the static reservation of resources, and describe its causes. This type of situation warrants further investigation to understand how the algorithm can be modified to achieve performance similar to that of the fixed bandwidth case

    Network planning for third-generation mobile radio systems

    Get PDF
    corecore