4,626 research outputs found

    Survey of dynamic scheduling in manufacturing systems

    Get PDF

    A Fuzzy Simheuristic for the Permutation Flow Shop Problem under Stochastic and Fuzzy Uncertainty

    Get PDF
    [EN] Stochastic, as well as fuzzy uncertainty, can be found in most real-world systems. Considering both types of uncertainties simultaneously makes optimization problems incredibly challenging. In this paper, we analyze the permutation flow shop problem (PFSP) with both stochastic and fuzzy processing times. The main goal is to find the solution (permutation of jobs) that minimizes the expected makespan. However, due to the existence of uncertainty, other characteristics of the solution are also taken into account. In particular, we illustrate how survival analysis can be employed to enrich the probabilistic information given to decision-makers. To solve the aforementioned optimization problem, we extend the concept of a simheuristic framework so it can also include fuzzy elements. Hence, both stochastic and fuzzy uncertainty are simultaneously incorporated in the PFSP. In order to test our approach, classical PFSP instances have been adapted and extended, so that processing times become either stochastic or fuzzy. The experimental results show the effectiveness of the proposed approach when compared with more traditional ones.This work has been partially supported by the Spanish Ministry of Science (PID2019111100RB-C21/AEI/10.13039/501100011033), as well as by the Barcelona Council and the "la Caixa" Foundation under the framework of the Barcelona Science Plan 2020-2023 (grant 21S09355-001).Castaneda, J.; Martín, XA.; Ammouriova, M.; Panadero, J.; Juan-Pérez, ÁA. (2022). A Fuzzy Simheuristic for the Permutation Flow Shop Problem under Stochastic and Fuzzy Uncertainty. Mathematics. 10(10):1-17. https://doi.org/10.3390/math10101760117101

    A graph based process model measurement framework using scheduling theory

    Get PDF
    Software development processes, as a means of ensuring software quality and productivity, have been widely accepted within the software development community; software process modeling, on the other hand, continues to be a subject of interest in the research community. Even with organizations that have achieved higher SEI maturity levels, processes are by and large described in documents and reinforced as guidelines or laws governing software development activities. The lack of industry-wide adaptation of software process modeling as part of development activities can be attributed to two major reasons: lack of forecast power in the (software) process modeling and lack of integration mechanism for the described process to seamlessly interact with daily development activities. This dissertation describes a research through which a framework has been established where processes can be manipulated, measured, and dynamically modified by interacting with project management techniques and activities in an integrated process modeling environment, thus closing the gap between process modeling and software development. In this research, processes are described using directed graphs, similar to the techniques with CPM. This way, the graphs can be manipulated visually while the properties of the graphs-can be used to check their validity. The partial ordering and the precedence relationship of the tasks in the graphs are similar to the one studied in other researches [Delcambre94] [Mills96]. Measurements of the effectiveness of the processes are added in this research. These measurements provide bases for the judgment when manipulating the graphs to produce or modify a process. Software development can be considered as activities related to three sets: a set of tasks (τ), a set of resources (ρ), and a set of constraints (y). The process, P, is then a function of all the sets interacting with each other: P = {τ, ρ, y). The interactions of these sets can be described in terms of different machine models using scheduling theory. While trying to produce an optimal solution satisfying a set of prescribed conditions using the analytical method would lead to a practically non-feasible formulation, many heuristic algorithms in scheduling theory combined with manual manipulation of the tasks can help to produce a reasonable good process, the effectiveness of which is reflected through a set of measurement criteria, in particular, the make-span, the float, and the bottlenecks. Through an integrated process modeling environment, these measurements can be obtained in real time, thus providing a feedback loop during the process execution. This feedback loop is essential for risk management and control

    Simulation of production scheduling in manufacturing systems

    Get PDF
    Research into production scheduling environments has been primarily concerned with developing local priority rules for selecting jobs from a queue to be processed on a set of individual machines. Most of the research deals with the scheduling problems in terms of the evaluation of priority rules with respect to given criteria. These criteria have a direct effect on the production cost, such as mean make-span, flow-time, job lateness, m-process inventory and machine idle time. The project under study consists of the following two phases. The first is to deal with the development of computer models for the flow-shop problem, which obtain the optimum make-span and near-optimum solutions for the well-used criteria in the production scheduling priority rules. The second is to develop experimental analysis using a simulation technique, for the two main manufacturing systems, 1. Job-shop 2. Flexible Manufacturing System The two manufacturing types were investigated under the following conditions i. Dynamic problem conditions ii. Different operation time distributions iii. Different shop loads iv. Seven replications per experiment with different streams of random number v. The approximately steady state point for each replication was obtained. In the FMS, the material handling system used was the automated guided Vehicles (AGVs), buffer station and load/ unload area were also used. The aim of these analyses is to deal with the effectiveness of the priority rules on the selected criteria performance. The SIMAN software simulation was used for these studies

    Modeling and Analysis of Scheduling Problems Containing Renewable Energy Decisions

    Get PDF
    With globally increasing energy demands, world citizens are facing one of society\u27s most critical issues: protecting the environment. To reduce the emission of greenhouse gases (GHG), which are by-products of conventional energy resources, people are reducing the consumption of oil, gas, and coal collectively. In the meanwhile, interest in renewable energy resources has grown in recent years. Renewable generators can be installed both on the power grid side and end-use customer side of power systems. Energy management in power systems with multiple microgrids containing renewable energy resources has been a focus of industry and researchers as of late. Further, on-site renewable energy provides great opportunities for manufacturing plants to reduce energy costs when faced with time-varying electricity prices. To efficiently utilize on-site renewable energy generation, production schedules and energy supply decisions need to be coordinated. As renewable energy resources like solar and wind energy typically fluctuate with weather variations, the inherent stochastic nature of renewable energy resources makes the decision making of utilizing renewable generation complex. In this dissertation, we study a power system with one main grid (arbiter) and multiple microgrids (agents). The microgrids (MGs) are equipped to control their local generation and demand in the presence of uncertain renewable generation and heterogeneous energy management settings. We propose an extension to the classical two-stage stochastic programming model to capture these interactions by modeling the arbiter\u27s problem as the first-stage master problem and the agent decision problems as second-stage subproblems. To tackle this problem formulation, we propose a sequential sampling-based optimization algorithm that does not require a priori knowledge of probability distribution functions or selection of samples for renewable generation. The subproblems capture the details of different energy management settings employed at the agent MGs to control heating, ventilation and air conditioning systems; home appliances; industrial production; plug-in electrical vehicles; and storage devices. Computational experiments conducted on the US western interconnect (WECC-240) data set illustrate that the proposed algorithm is scalable and our solutions are statistically verifiable. Our results also show that the proposed framework can be used as a systematic tool to gauge (a) the impact of energy management settings in efficiently utilizing renewable generation and (b) the role of flexible demands in reducing system costs. Next, we present a two-stage, multi-objective stochastic program for flow shops with sequence-dependent setups in order to meet production schedules while managing energy costs. The first stage provides optimal schedules to minimize the total completion time, while the second stage makes energy supply decisions to minimize energy costs under a time-of-use electricity pricing scheme. Power demand for production is met by on-site renewable generation, supply from the main grid, and an energy storage system. An Δ-constraint algorithm integrated with an L-shaped method is proposed to analyze the problem. Sets of Pareto optimal solutions are provided for decision-makers and our results show that the energy cost of setup operations is relatively high such that it cannot be ignored. Further, using solar or wind energy can save significant energy costs with solar energy being the more viable option of the two for reducing costs. Finally, we extend the flow shop scheduling problem to a job shop environment under hour-ahead real-time electricity pricing schemes. The objectives of interest are to minimize total weighted completion time and energy costs simultaneously. Besides renewable generation, hour-ahead real-time electricity pricing is another source of uncertainty in this study as electricity prices are released to customers only hours in advance of consumption. A mathematical model is presented and an Δ-constraint algorithm is used to tackle the bi-objective problem. Further, to improve computational efficiency and generate solutions in a practically acceptable amount of time, a hybrid multi-objective evolutionary algorithm based on the Non-dominated Sorting Genetic Algorithm II (NSGA-II) is developed. Five methods are developed to calculate chromosome fitness values. Computational tests show that both mathematical modeling and our proposed algorithm are comparable, while our algorithm produces solutions much quicker. Using a single method (rather than five) to generate schedules can further reduce computational time without significantly degrading solution quality

    Order acceptance under uncertainty in batch process industries

    Get PDF
    XIV+140hlm.;24c

    Application of Reinforcement Learning to Multi-Agent Production Scheduling

    Get PDF
    Reinforcement learning (RL) has received attention in recent years from agent-based researchers because it can be applied to problems where autonomous agents learn to select proper actions for achieving their goals based on interactions with their environment. Each time an agent performs an action, the environmentÂĄĆ s response, as indicated by its new state, is used by the agent to reward or penalize its action. The agentÂĄĆ s goal is to maximize the total amount of reward it receives over the long run. Although there have been several successful examples demonstrating the usefulness of RL, its application to manufacturing systems has not been fully explored. The objective of this research is to develop a set of guidelines for applying the Q-learning algorithm to enable an individual agent to develop a decision making policy for use in agent-based production scheduling applications such as dispatching rule selection and job routing. For the dispatching rule selection problem, a single machine agent employs the Q-learning algorithm to develop a decision-making policy on selecting the appropriate dispatching rule from among three given dispatching rules. In the job routing problem, a simulated job shop system is used for examining the implementation of the Q-learning algorithm for use by job agents when making routing decisions in such an environment. Two factorial experiment designs for studying the settings used to apply Q-learning to the single machine dispatching rule selection problem and the job routing problem are carried out. This study not only investigates the main effects of this Q-learning application but also provides recommendations for factor settings and useful guidelines for future applications of Q-learning to agent-based production scheduling

    Towards Autonomic Service Provisioning Systems

    Full text link
    This paper discusses our experience in building SPIRE, an autonomic system for service provision. The architecture consists of a set of hosted Web Services subject to QoS constraints, and a certain number of servers used to run session-based traffic. Customers pay for having their jobs run, but require in turn certain quality guarantees: there are different SLAs specifying charges for running jobs and penalties for failing to meet promised performance metrics. The system is driven by an utility function, aiming at optimizing the average earned revenue per unit time. Demand and performance statistics are collected, while traffic parameters are estimated in order to make dynamic decisions concerning server allocation and admission control. Different utility functions are introduced and a number of experiments aiming at testing their performance are discussed. Results show that revenues can be dramatically improved by imposing suitable conditions for accepting incoming traffic; the proposed system performs well under different traffic settings, and it successfully adapts to changes in the operating environment.Comment: 11 pages, 9 Figures, http://www.wipo.int/pctdb/en/wo.jsp?WO=201002636
    • 

    corecore