    Integrating sustainability into production scheduling in hybrid flow-shop environments

    Get PDF
    Global energy consumption is projected to grow by nearly 50% as of 2018, reaching a peak of 910.7 quadrillion BTU in 2050. The industrial sector accounts for the largest share of the energy consumed, making energy awareness on the shop foors imperative for promoting industrial sustainable development. Considering a growing awareness of the importance of sustainability, production planning and control require the incorporation of time-of-use electricity pricing models into scheduling problems for well-informed energy-saving decisions. Besides, modern manufacturing emphasizes the role of human factors in production processes. This study proposes a new approach for optimizing the hybrid fow-shop scheduling problems (HFSP) considering time-of-use electricity pricing, workers’ fexibility, and sequence-dependent setup time (SDST). Novelties of this study are twofold: to extend a new mathematical formulation and to develop an improved multi-objective optimization algorithm. Extensive numerical experiments are conducted to evaluate the performance of the developed solution method, the adjusted multi-objective genetic algorithm (AMOGA), comparing it with the state-of-the-art, i.e., strength Pareto evolutionary algorithm (SPEA2), and Pareto envelop-based selection algorithm (PESA2). It is shown that AMOGA performs better than the benchmarks considering the mean ideal distance, inverted generational distance, diversifcation, and quality metrics, providing more versatile and better solutions for production and energy efciency

    A Linear Programming Model for Renewable Energy Aware Discrete Production Planning and Control

    Get PDF
    Industrial production in the EU, like other sectors of the economy, is obliged to stop producing greenhouse gas emissions by 2050. With its Green Deal, the European Union has already set the corresponding framework in 2019. To achieve Net Zero in the remaining time, while not endangering one's own competitiveness on a globalized market, a transformation of industrial value creation has to be started already today. In terms of energy supply, this means a comprehensive electrification of processes and a switch to fully renewable power generation. However, due to a growing share of renewable energy sources, increasing volatility can be observed in the European electricity market already. For companies, there are mainly two ways to deal with the accompanying increase in average electricity prices. The first is to reduce consumption by increasing efficiency, which naturally has its physical limits. Secondly, an increasing volatile electricity price makes it possible to take advantage of periods of relatively low prices. To do this, companies must identify their energy-intensive processes and design them in such a way as to enable these activities to be shifted in time. This article explains the necessary differentiation between labor-intensive and energy intensive processes. A general mathematical model for the holistic optimization of discrete industrial production is presented. With the help of this MILP model, it is simulated that a flexibilization of energy intensive processes with volatile energy prices can help to reduce costs and thus secure competitiveness while getting it in line with European climate goals. On the basis of real electricity market data, different production scenarios are compared, and it is investigated under which conditions the flexibilization of specific processes is worthwhile

    The Factory of the Future

    Get PDF
    A brief history of aircraft production techniques is given. A flexible machining cell is then described. It is a computer controlled system capable of performing 4-axis machining part cleaning, dimensional inspection and materials handling functions in an unmanned environment. The cell was designed to: allow processing of similar and dissimilar parts in random order without disrupting production; allow serial (one-shipset-at-a-time) manufacturing; reduce work-in-process inventory; maximize machine utilization through remote set-up; maximize throughput and minimize labor

    Energy-Efficient Flexible Flow Shop Scheduling With Due Date and Total Flow Time

    Get PDF
    One of the most significant optimization issues facing a manufacturing company is the flexible flow shop scheduling problem (FFSS). However, FFSS with uncertainty and energy-related elements has received little investigation. Additionally, in order to reduce overall waiting times and earliness/tardiness issues, the topic of flexible flow shop scheduling with shared due dates is researched. Using transmission line loadings and bus voltage magnitude variations, an unique severity function is formulated in this research. Optimize total energy consumption, total agreement index, and make span all at once. Many different meta-heuristics have been presented in the past to find near-optimal answers in an acceptable amount of computation time. To explore the potential for energy saving in shop floor management, a multi-level optimization technique for flexible flow shop scheduling and integrates power models for individual machines with cutting parameters optimisation into energy-efficient scheduling issues is proposed. However, it can be difficult and time-consuming to fine-tune algorithm-specific parameters for solving FFSP

    Modeling and Solving Flow Shop Scheduling Problem Considering Worker Resource

    Get PDF
    In this paper, an uninterrupted hybrid flow scheduling problem is modeled under uncertainty conditions. Due to the uncertainty of processing time in workshops, fuzzy programming method has been used to control the parameters of processing time and preparation time. In the proposed model, there are several jobs that must be processed by machines and workers, respectively. The main purpose of the proposed model is to determine the correct sequence of operations and assign operations to each machine and each worker at each stage, so that the total completion time (Cmax) is minimized. Also this paper, fuzzy programming method is used for control unspecified parameter has been used from GAMS software to solve sample problems. The results of problem solving in small and medium dimensions show that with increasing uncertainty, the amount of processing time and consequently the completion time increases. Increases from the whole work. On the other hand, with the increase in the number of machines and workers in each stage due to the high efficiency of the machines, the completion time of all works has decreased. Innovations in this paper include uninterrupted hybrid flow storage scheduling with respect to fuzzy processing time and preparation time in addition to payment time. The allocation of workers and machines to jobs is another innovation of this article

    Energy Efficient Policies, Scheduling, and Design for Sustainable Manufacturing Systems

    Get PDF
    Climate mitigation, more stringent regulations, rising energy costs, and sustainable manufacturing are pushing researchers to focus on energy efficiency, energy flexibility, and implementation of renewable energy sources in manufacturing systems. This thesis aims to analyze the main works proposed regarding these hot topics, and to fill the gaps in the literature. First, a detailed literature review is proposed. Works regarding energy efficiency in different manufacturing levels, in the assembly line, energy saving policies, and the implementation of renewable energy sources are analyzed. Then, trying to fill the gaps in the literature, different topics are analyzed more in depth. In the single machine context, a mathematical model aiming to align the manufacturing power required to a renewable energy supply in order to obtain the maximum profit is developed. The model is applied to a single work center powered by the electric grid and by a photovoltaic system; afterwards, energy storage is also added to the power system. Analyzing the job shop context, switch off policies implementing workload approach and scheduling considering variable speed of the machines and power constraints are proposed. The direct and indirect workloads of the machines are considered to support the switch on/off decisions. A simulation model is developed to test the proposed policies compared to others presented in the literature. Regarding the job shop scheduling, a fixed and variable power constraints are considered, assuming the minimization of the makespan as the objective function. Studying the factory level, a mathematical model to design a flow line considering the possibility of using switch-off policies is developed. The design model for production lines includes a targeted imbalance among the workstations to allow for defined idle time. Finally, the main findings, results, and the future directions and challenges are presented

    Scheduling With Alternatives Machine Using Fuzzy Inference System And Genetic Algorithm.

    Get PDF
    As the manufacturing activities in today's industries are getting more and more complex, it is required for the manufacturing company to have a good shop floor production scheduling to plan and schedule their production orders. Industri pengeluarcim kini telah berkembang pesat dan aktiviti pengeluarannya semakin kompleks, dengan itu syarikat pengeluar memerlukan jadual lantai pengeluaran (shop floor) yang terbaik untuk merancang permintaan pengeluaran (product)
    • 