1,910 research outputs found
Wireless industrial monitoring and control networks: the journey so far and the road ahead
While traditional wired communication technologies have played a crucial role in industrial monitoring and control networks over the past few decades, they are increasingly proving to be inadequate to meet the highly dynamic and stringent demands of today’s industrial applications, primarily due to the very rigid nature of wired infrastructures. Wireless technology, however, through its increased pervasiveness, has the potential to revolutionize the industry, not only by mitigating the problems faced by wired solutions, but also by introducing a completely new class of applications. While present day wireless technologies made some preliminary inroads in the monitoring domain, they still have severe limitations especially when real-time, reliable distributed control operations are concerned. This article provides the reader with an overview of existing wireless technologies commonly used in the monitoring and control industry. It highlights the pros and cons of each technology and assesses the degree to which each technology is able to meet the stringent demands of industrial monitoring and control networks. Additionally, it summarizes mechanisms proposed by academia, especially serving critical applications by addressing the real-time and reliability requirements of industrial process automation. The article also describes certain key research problems from the physical layer communication for sensor networks and the wireless networking perspective that have yet to be addressed to allow the successful use of wireless technologies in industrial monitoring and control networks
Machine Learning in Wireless Sensor Networks: Algorithms, Strategies, and Applications
Wireless sensor networks monitor dynamic environments that change rapidly
over time. This dynamic behavior is either caused by external factors or
initiated by the system designers themselves. To adapt to such conditions,
sensor networks often adopt machine learning techniques to eliminate the need
for unnecessary redesign. Machine learning also inspires many practical
solutions that maximize resource utilization and prolong the lifespan of the
network. In this paper, we present an extensive literature review over the
period 2002-2013 of machine learning methods that were used to address common
issues in wireless sensor networks (WSNs). The advantages and disadvantages of
each proposed algorithm are evaluated against the corresponding problem. We
also provide a comparative guide to aid WSN designers in developing suitable
machine learning solutions for their specific application challenges.Comment: Accepted for publication in IEEE Communications Surveys and Tutorial
Unified Role Assignment Framework For Wireless Sensor Networks
Wireless sensor networks are made possible by the continuing improvements in embedded sensor, VLSI, and wireless radio technologies. Currently, one of the important challenges in sensor networks is the design of a systematic network management framework that allows localized and collaborative resource control uniformly across all application services such as sensing, monitoring, tracking, data aggregation, and routing.
The research in wireless sensor networks is currently oriented toward a cross-layer network abstraction that supports appropriate fine or course grained resource controls for energy efficiency. In that regard, we have designed a unified role-based service paradigm for wireless sensor networks. We pursue this by first developing a Role-based Hierarchical Self-Organization (RBSHO) protocol that organizes a connected dominating set (CDS) of nodes called dominators. This is done by hierarchically selecting nodes that possess cumulatively high energy, connectivity, and sensing capabilities in their local neighborhood. The RBHSO protocol then assigns specific tasks such as sensing, coordination, and routing to appropriate dominators that end up playing a certain role in the network.
Roles, though abstract and implicit, expose role-specific resource controls by way of role assignment and scheduling. Based on this concept, we have designed a Unified Role-Assignment Framework (URAF) to model application services as roles played by local in-network sensor nodes with sensor capabilities used as rules for role identification. The URAF abstracts domain specific role attributes by three models: the role energy model, the role execution time model, and the role service utility model. The framework then generalizes resource management for services by providing abstractions for controlling the composition of a service in terms of roles, its assignment, reassignment, and scheduling. To the best of our knowledge, a generic role-based framework that provides a simple and unified network management solution for wireless sensor networks has not been proposed previously
Biologically inspired, self organizing communication networks.
PhDThe problem of energy-efficient, reliable, accurate and self-organized target tracking in
Wireless Sensor Networks (WSNs) is considered for sensor nodes with limited physical
resources and abrupt manoeuvring mobile targets. A biologically inspired, adaptive
multi-sensor scheme is proposed for collaborative Single Target Tracking (STT) and
Multi-Target Tracking (MTT). Behavioural data obtained while tracking the targets
including the targets’ previous locations is recorded as metadata to compute the target
sampling interval, target importance and local monitoring interval so that tracking
continuity and energy-efficiency are improved. The subsequent sensor groups that track
the targets are selected proactively according to the information associated with the
predicted target location probability such that the overall tracking performance is
optimized or nearly-optimized. One sensor node from each of the selected groups is
elected as a main node for management operations so that energy efficiency and load
balancing are improved. A decision algorithm is proposed to allow the “conflict” nodes
that are located in the sensing areas of more than one target at the same time to decide
their preferred target according to the target importance and the distance to the target. A
tracking recovery mechanism is developed to provide the tracking reliability in the
event of target loss.
The problem of task mapping and scheduling in WSNs is also considered. A
Biological Independent Task Allocation (BITA) algorithm and a Biological Task
Mapping and Scheduling (BTMS) algorithm are developed to execute an application
using a group of sensor nodes. BITA, BTMS and the functional specialization of the
sensor groups in target tracking are all inspired from biological behaviours of
differentiation in zygote formation.
Simulation results show that compared with other well-known schemes, the
proposed tracking, task mapping and scheduling schemes can provide a significant
improvement in energy-efficiency and computational time, whilst maintaining
acceptable accuracy and seamless tracking, even with abrupt manoeuvring targets.Queen Mary university of London full Scholarshi
Design and Analysis of Self-Adapted Task Scheduling Strategies in Wireless Sensor Networks
In a wireless sensor network (WSN), the usage of resources is usually highly related to the execution of tasks which consume a certain amount of computing and communication bandwidth. Parallel processing among sensors is a promising solution to provide the demanded computation capacity in WSNs. Task allocation and scheduling is a typical problem in the area of high performance computing. Although task allocation and scheduling in wired processor networks has been well studied in the past, their counterparts for WSNs remain largely unexplored. Existing traditional high performance computing solutions cannot be directly implemented in WSNs due to the limitations of WSNs such as limited resource availability and the shared communication medium. In this paper, a self-adapted task scheduling strategy for WSNs is presented. First, a multi-agent-based architecture for WSNs is proposed and a mathematical model of dynamic alliance is constructed for the task allocation problem. Then an effective discrete particle swarm optimization (PSO) algorithm for the dynamic alliance (DPSO-DA) with a well-designed particle position code and fitness function is proposed. A mutation operator which can effectively improve the algorithm’s ability of global search and population diversity is also introduced in this algorithm. Finally, the simulation results show that the proposed solution can achieve significant better performance than other algorithms
A survey of localization in wireless sensor network
Localization is one of the key techniques in wireless sensor network. The location estimation methods can be classified into target/source localization and node self-localization. In target localization, we mainly introduce the energy-based method. Then we investigate the node self-localization methods. Since the widespread adoption of the wireless sensor network, the localization methods are different in various applications. And there are several challenges in some special scenarios. In this paper, we present a comprehensive survey of these challenges: localization in non-line-of-sight, node selection criteria for localization in energy-constrained network, scheduling the sensor node to optimize the tradeoff between localization performance and energy consumption, cooperative node localization, and localization algorithm in heterogeneous network. Finally, we introduce the evaluation criteria for localization in wireless sensor network
Optimizing communication and computation for multi-UAV information gathering applications
Typical mobile agent networks, such as multi-UAV systems, are constrained by limited resources: energy, computing power, memory and communication bandwidth. In particular,
limited energy affects system performance directly, such as system lifetime. Moreover, it has been demonstrated experimentally in the wireless sensor network literature that the total energy consumption is often dominated by the communication cost, i.e. the computational and the sensing energy are small compared to the
communication energy consumption. For this reason, the lifetime of the network can be extended significantly by minimizing the
communication distance as well as the amount of communication data, at the expense of increasing computational cost. In this work, we aim at attaining an optimal trade-off between the communication and the computational energy. Specifically, we propose a mixed-integer optimization formulation for a multihop
hierarchical clustering-based self-organizing UAV network incorporating data aggregation, to obtain an energy-efficient information routing scheme. The proposed framework is tested on two applications, namely target tracking and area mapping. Based on simulation results, our method can significantly save energy compared to a baseline strategy, where there is no data aggregation and clustering scheme
A critical analysis of research potential, challenges and future directives in industrial wireless sensor networks
In recent years, Industrial Wireless Sensor Networks (IWSNs) have emerged as an important research theme with applications spanning a wide range of industries including automation, monitoring, process control, feedback systems and automotive. Wide scope of IWSNs applications ranging from small production units, large oil and gas industries to nuclear fission control, enables a fast-paced research in this field. Though IWSNs offer advantages of low cost, flexibility, scalability, self-healing, easy deployment and reformation, yet they pose certain limitations on available potential and introduce challenges on multiple fronts due to their susceptibility to highly complex and uncertain industrial environments. In this paper a detailed discussion on design objectives, challenges and solutions, for IWSNs, are presented. A careful evaluation of industrial systems, deadlines and possible hazards in industrial atmosphere are discussed. The paper also presents a thorough review of the existing standards and industrial protocols and gives a critical evaluation of potential of these standards and protocols along with a detailed discussion on available hardware platforms, specific industrial energy harvesting techniques and their capabilities. The paper lists main service providers for IWSNs solutions and gives insight of future trends and research gaps in the field of IWSNs
- …