137,051 research outputs found
Impact of Forecast Errors on Expansion Planning of Power Systems with a Renewables Target
This paper analyzes the impact of production forecast errors on the expansion
planning of a power system and investigates the influence of market design to
facilitate the integration of renewable generation. For this purpose, we
propose a stochastic programming modeling framework to determine the expansion
plan that minimizes system-wide investment and operating costs, while ensuring
a given share of renewable generation in the electricity supply. Unlike
existing ones, this framework includes both a day-ahead and a balancing market
so as to capture the impact of both production forecasts and the associated
prediction errors. Within this framework, we consider two paradigmatic market
designs that essentially differ in whether the day-ahead generation schedule
and the subsequent balancing re-dispatch are co-optimized or not. The main
features and results of the model set-ups are discussed using an illustrative
four-node example and a more realistic 24-node case study
Impact of Equipment Failures and Wind Correlation on Generation Expansion Planning
Generation expansion planning has become a complex problem within a
deregulated electricity market environment due to all the uncertainties
affecting the profitability of a given investment. Current expansion models
usually overlook some of these uncertainties in order to reduce the
computational burden. In this paper, we raise a flag on the importance of both
equipment failures (units and lines) and wind power correlation on generation
expansion decisions. For this purpose, we use a bilevel stochastic optimization
problem, which models the sequential and noncooperative game between the
generating company (GENCO) and the system operator. The upper-level problem
maximizes the GENCO's expected profit, while the lower-level problem simulates
an hourly market-clearing procedure, through which LMPs are determined. The
uncertainty pertaining to failures and wind power correlation are characterized
by a scenario set, and their impact on generation expansion decisions are
quantified and discussed for a 24-bus power system
Dynamic Robust Transmission Expansion Planning
Recent breakthroughs in Transmission Network Expansion Planning (TNEP) have
demonstrated that the use of robust optimization, as opposed to stochastic
programming methods, renders the expansion planning problem considering
uncertainties computationally tractable for real systems. However, there is
still a yet unresolved and challenging problem as regards the resolution of the
dynamic TNEP problem (DTNEP), which considers the year-by-year representation
of uncertainties and investment decisions in an integrated way. This problem
has been considered to be a highly complex and computationally intractable
problem, and most research related to this topic focuses on very small case
studies or used heuristic methods and has lead most studies about TNEP in the
technical literature to take a wide spectrum of simplifying assumptions. In
this paper an adaptive robust transmission network expansion planning
formulation is proposed for keeping the full dynamic complexity of the problem.
The method overcomes the problem size limitations and computational
intractability associated with dynamic TNEP for realistic cases. Numerical
results from an illustrative example and the IEEE 118-bus system are presented
and discussed, demonstrating the benefits of this dynamic TNEP approach with
respect to classical methods.Comment: 10 pages, 2 figures. This article has been accepted for publication
in a future issue of this journal, but has not been fully edited. Content may
change prior to final publication. Citation information: DOI
10.1109/TPWRS.2016.2629266, IEEE Transactions on Power Systems 201
Linear Optimal Power Flow Using Cycle Flows
Linear optimal power flow (LOPF) algorithms use a linearization of the
alternating current (AC) load flow equations to optimize generator dispatch in
a network subject to the loading constraints of the network branches. Common
algorithms use the voltage angles at the buses as optimization variables, but
alternatives can be computationally advantageous. In this article we provide a
review of existing methods and describe a new formulation that expresses the
loading constraints directly in terms of the flows themselves, using a
decomposition of the network graph into a spanning tree and closed cycles. We
provide a comprehensive study of the computational performance of the various
formulations, in settings that include computationally challenging applications
such as multi-period LOPF with storage dispatch and generation capacity
expansion. We show that the new formulation of the LOPF solves up to 7 times
faster than the angle formulation using a commercial linear programming solver,
while another existing cycle-based formulation solves up to 20 times faster,
with an average speed-up of factor 3 for the standard networks considered here.
If generation capacities are also optimized, the average speed-up rises to a
factor of 12, reaching up to factor 213 in a particular instance. The speed-up
is largest for networks with many buses and decentral generators throughout the
network, which is highly relevant given the rise of distributed renewable
generation and the computational challenge of operation and planning in such
networks.Comment: 11 pages, 5 figures; version 2 includes results for generation
capacity optimization; version 3 is the final accepted journal versio
- …