2,254 research outputs found

    Stochastic Cyclic Inventory Routing with Supply Uncertainty: A Case in Green-Hydrogen Logistics

    Full text link
    Hydrogen can be produced from water, using electricity. The hydrogen can subsequently be kept in inventory in large quantities, unlike the electricity itself. This enables solar and wind energy generation to occur asynchronously from its usage. For this reason, hydrogen is expected to be a key ingredient for reaching a climate-neutral economy. However, the logistics for hydrogen are complex. Inventory policies must be determined for multiple locations in the network, and transportation of hydrogen from the production location to customers must be scheduled. At the same time, production patterns of hydrogen are intermittent, which affects the possibilities to realize the planned transportation and inventory levels. To provide policies for efficient transportation and storage of hydrogen, this paper proposes a parameterized cost function approximation approach to the stochastic cyclic inventory routing problem. Firstly, our approach includes a parameterized mixed integer programming (MIP) model which yields fixed and repetitive schedules for vehicle transportation of hydrogen. Secondly, buying and selling decisions in case of underproduction or overproduction are optimized further via a Markov decision process (MDP) model, taking into account the uncertainties in production and demand quantities. To jointly optimize the parameterized MIP and the MDP model, our approach includes an algorithm that searches the parameter space by iteratively solving the MIP and MDP models. We conduct computational experiments to validate our model in various problem settings and show that it provides near-optimal solutions. Moreover, we test our approach on an expert-reviewed case study at two hydrogen production locations in the Netherlands. We offer insights for the stakeholders in the region and analyze the impact of various problem elements in these case studies

    Stochastic Cyclic Inventory Routing with Supply Uncertainty: A Case in Green-Hydrogen Logistics

    Get PDF
    Hydrogen can be produced from water, using electricity. The hydrogen can subsequently be kept in inventory in large quantities, unlike the electricity itself. This enables solar and wind energy generation to occur asynchronously from its usage. For this reason, hydrogen is expected to be a key ingredient for reaching a climate-neutral economy. However, the logistics for hydrogen are complex. Inventory policies must be determined for multiple locations in the network, and transportation of hydrogen from the production location to customers must be scheduled. At the same time, production patterns of hydrogen are intermittent, which affects the possibilities to realize the planned transportation and inventory levels. To provide policies for efficient transportation and storage of hydrogen, this paper proposes a parameterized cost function approximation approach to the stochastic cyclic inventory routing problem. Firstly, our approach includes a parameterized mixed integer programming (MIP) model which yields fixed and repetitive schedules for vehicle transportation of hydrogen. Secondly, buying and selling decisions in case of underproduction or overproduction are optimized further via a Markov decision process (MDP) model, taking into account the uncertainties in production and demand quantities. To jointly optimize the parameterized MIP and the MDP model, our approach includes an algorithm that searches the parameter space by iteratively solving the MIP and MDP models. We conduct computational experiments to validate our model in various problem settings and show that it provides near-optimal solutions. Moreover, we test our approach on an expert-reviewed case study at two hydrogen production locations in the Netherlands. We offer insights for the stakeholders in the region and analyze the impact of various problem elements in these case studies.<br/

    Milk Run Design: Definitions, Concepts and Solution Approaches

    Get PDF
    Efficient inbound networks in the European automotive industry rely on a set of different transport concepts including milk runs - understood as regularly scheduled pickup tours. The complexity of designing such a mixed network makes decision support necessary: In this thesis we provide definitions, mathematical models and a solution method for the Milk Run Design problem and introduce indicators assessing the performance of established milk runs in relation to alternative transport concepts

    Milk Run Design: Definitions, Concepts and Solution Approaches

    Get PDF
    Efficient inbound networks in the European automotive industry rely on a set of different transport concepts including milk runs - understood as regularly scheduled pickup tours. The complexity of designing such a mixed network makes decision support necessary: In this book we provide definitions, mathematical models and a solution method for the Milk Run Design problem and introduce indicators assessing the performance of established milk runs in relation to alternative transport concepts

    Modelling a cyclic maritime inventory routing problem

    Get PDF

    Long‐term effects of short planning horizons for inventory routing problems

    Get PDF
    This paper presents a detailed study concerning the importance of the planning horizon when solving inventory routing problems (IRPs). We evaluate the quality of decisions obtained by solving a finite-horizon IRP. We also discuss the relevance of explicitly considering profit maximization models rather than the traditional cost minimization variant. As a means to this end, we describe four classes of the IRP corresponding to different types of markets. Two of them lead to nonlinear models, which are linearized. Furthermore, we provide a deterministic simulator to evaluate the long-term effects arising from using planning horizons of varying lengths when solving the IRP. A computational study is performed on cases generated from benchmark data instances. The results confirm that the long-term performance of the IRP decisions is, in part, contingent on the length of the selected planning horizon. They also show that considering profit maximization instead of cost minimization leads to different decisions, generating considerably more revenue and profits, albeit not nearly as much as suggested by individual solutions to static IRPs with short planning horizons. Keywords: profit maximization, path flow, linearization, end effect, simulationpublishedVersio

    Essays on Shipment Consolidation Scheduling and Decision Making in the Context of Flexible Demand

    Get PDF
    This dissertation contains three essays related to shipment consolidation scheduling and decision making in the presence of flexible demand. The first essay is presented in Section 1. This essay introduces a new mathematical model for shipment consolidation scheduling for a two-echelon supply chain. The problem addresses shipment coordination and consolidation decisions that are made by a manufacturer who provides inventory replenishments to multiple downstream distribution centers. Unlike previous studies, the consolidation activities in this problem are not restricted to specific policies such as aggregation of shipments at regular times or consolidating when a predetermined quantity has accumulated. Rather, we consider the construction of a detailed shipment consolidation schedule over a planning horizon. We develop a mixed-integer quadratic optimization model to identify the shipment consolidation schedule that minimizes total cost. A genetic algorithm is developed to handle large problem instances. The other two essays explore the concept of flexible demand. In Section 2, we introduce a new variant of the vehicle routing problem (VRP): the vehicle routing problem with flexible repeat visits (VRP-FRV). This problem considers a set of customers at certain locations with certain maximum inter-visit time requirements. However, they are flexible in their visit times. The VRP-FRV has several real-world applications. One scenario is that of caretakers who provide service to elderly people at home. Each caretaker is assigned a number of elderly people to visit one or more times per day. Elderly people differ in their requirements and the minimum frequency at which they need to be visited every day. The VRP-FRV can also be imagined as a police patrol routing problem where the customers are various locations in the city that require frequent observations. Such locations could include known high-crime areas, high-profile residences, and/or safe houses. We develop a math model to minimize the total number of vehicles needed to cover the customer demands and determine the optimal customer visit schedules and vehicle routes. A heuristic method is developed to handle large problem instances. In the third study, presented in Section 3, we consider a single-item cyclic coordinated order fulfillment problem with batch supplies and flexible demands. The system in this study consists of multiple suppliers who each deliver a single item to a central node from which multiple demanders are then replenished. Importantly, demand is flexible and is a control action that the decision maker applies to optimize the system. The objective is to minimize total system cost subject to several operational constraints. The decisions include the timing and sizes of batches delivered by the suppliers to the central node and the timing and amounts by which demanders are replenished. We develop an integer programing model, provide several theoretical insights related to the model, and solve the math model for different problem sizes

    On the inventory routing problem with stationary stochastic demand rate

    Get PDF
    One of the most significant paradigm shifts of present business management is that individual businesses no longer participate as solely independent entities, but rather as supply chains (Lambert and Cooper, 2000). Therefore, the management of multiple relationships across the supply chain such as flow of materials, information, and finances is being referred to as supply chain management (SCM). SCM involves coordinating and integrating these multiple relationships within and among companies, so that it can improve the global performance of the supply chain. In this dissertation, we discuss the issue of integrating the two processes in the supply chain related, respectively, to inventory management and routing policies. The challenging problem of coordinating the inventory management and transportation planning decisions in the same time, is known as the inventory routing problem (IRP). The IRP is one of the challenging optimization problems in logis-tics and supply chain management. It aims at optimally integrating inventory control and vehicle routing operations in a supply network. In general, IRP arises as an underlying optimization problem in situations involving simultaneous optimization of inventory and distribution decisions. Its main goal is to determine an optimal distribution policy, consisting of a set of vehicle routes, delivery quantities and delivery times that minimizes the total inventory holding and transportation costs. This is a typical logistical optimization problem that arises in supply chains implementing a vendor managed inventory (VMI) policy. VMI is an agreement between a supplier and his regular retailers according to which retailers agree to the alternative that the supplier decides the timing and size of the deliveries. This agreement grants the supplier the full authority to manage inventories at his retailers'. This allows the supplier to act proactively and take responsibility for the inventory management of his regular retailers, instead of reacting to the orders placed by these retailers. In practice, implementing policies such as VMI has proven to considerably improve the overall performance of the supply network, see for example Lee and Seungjin (2008), Andersson et al. (2010) and Coelho et al. (2014). This dissertation focuses mainly on the single-warehouse, multiple-retailer (SWMR) system, in which a supplier serves a set of retailers from a single warehouse. In the first situation, we assume that all retailers face a deterministic, constant demand rate and in the second condition, we assume that all retailers consume the product at a stochastic stationary rate. The primary objective is to decide when and how many units to be delivered from the supplier to the warehouse and from the warehouse to retailers so as to minimize total transportation and inventory holding costs over the finite horizon without any shortages
    corecore