3,257 research outputs found
CTX: A Clock-Gating-Based Test Relaxation and X-Filling Scheme for Reducing Yield Loss Risk in At-Speed Scan Testing
At-speed scan testing is susceptible to yield loss risk due to power supply noise caused by excessive launch switching activity. This paper proposes a novel two-stage scheme, namely CTX (Clock-Gating-Based Test Relaxation and X-Filling), for reducing switching activity when test stimulus is launched. Test relaxation and X-filling are conducted (1) to make as many FFs inactive as possible by disabling corresponding clock-control signals of clock-gating circuitry in Stage-1 (Clock-Disabling), and (2) to make as many remaining active FFs as possible to have equal input and output values in Stage-2 (FF-Silencing). CTX effectively reduces launch switching activity, thus yield loss risk, even with a small number of donpsilat care (X) bits as in test compression, without any impact on test data volume, fault coverage, performance, and circuit design.2008 17th Asian Test Symposium (ATS 2008), 24-27 November 2008, Sapporo, Japa
A Novel Scan Segmentation Design Method for Avoiding Shift Timing Failure in Scan Testing
High power consumption in scan testing can cause undue yield loss which has increasingly become a serious problem for deep-submicron VLSI circuits. Growing evidence attributes this problem to shift timing failures, which are primarily caused by excessive switching activity in the proximities of clock paths that tends to introduce severe clock skew due to IR-drop-induced delay increase. This paper is the first of its kind to address this critical issue with a novel layout-aware scheme based on scan segmentation design, called LCTI-SS (Low-Clock-Tree-Impact Scan Segmentation). An optimal combination of scan segments is identified for simultaneous clocking so that the switching activity in the proximities of clock trees is reduced while maintaining the average power reduction effect on conventional scan segmentation. Experimental results on benchmark and industrial circuits have demonstrated the advantage of the LCTI-SS scheme.2011 IEEE International Test Conference, 20-22 September 2011, Anaheim, CA, US
Physical Design and Clock Tree Synthesis Methods For A 8-Bit Processor
Now days a number of processors are available with a lot kind of feature from different industries. A processor with similar kind of architecture of the current processors only missing the memory stuffs like the RAM and ROM has been designed here with the help of Verilog style of coding. This processor contains architecturally the program counter, instruction register, ALU, ALU latch, General Purpose Registers, control state module, flag registers and the core module containing all the modules. And a test module is designed for testing the processor. After the design of the processor with successful functionality, the processor is synthesized with 180nm technology. The synthesis is performed with the data path optimization like the selection of proper adders and multipliers for timing optimization in the data path while the ALU operations are performed. During synthesis how to take care of the worst negative slack (WNS), how to include the clock gating cells, how to define the cost and path groups etc. have been covered. After the proper synthesis we get the proper net list and the synthesized constraint file for carrying out the physical design. In physical design the steps like floor-planning, partitioning, placement, legalization of the placement, clock tree synthesis, and routing etc. have been performed. At all the stages the static timing analysis is performed for the timing meet of the design for better performance in terms of timing or frequency. Each steps of physical design are discussed with special effort towards the concepts behind the step. Out of all the steps of physical design the clock tree synthesis is performed with some improvement in the performance of the clock tree by creating a symmetrical clock tree and maintaining more common clock paths. A special algorithm has been framed for creating a symmetrical clock tree and thereby making the power consumption of the clock tree low
- …