288 research outputs found

    Algorithms for Scheduling Problems

    Get PDF
    This edited book presents new results in the area of algorithm development for different types of scheduling problems. In eleven chapters, algorithms for single machine problems, flow-shop and job-shop scheduling problems (including their hybrid (flexible) variants), the resource-constrained project scheduling problem, scheduling problems in complex manufacturing systems and supply chains, and workflow scheduling problems are given. The chapters address such subjects as insertion heuristics for energy-efficient scheduling, the re-scheduling of train traffic in real time, control algorithms for short-term scheduling in manufacturing systems, bi-objective optimization of tortilla production, scheduling problems with uncertain (interval) processing times, workflow scheduling for digital signal processor (DSP) clusters, and many more

    Theoretical and Computational Research in Various Scheduling Models

    Get PDF
    Nine manuscripts were published in this Special Issue on “Theoretical and Computational Research in Various Scheduling Models, 2021” of the MDPI Mathematics journal, covering a wide range of topics connected to the theory and applications of various scheduling models and their extensions/generalizations. These topics include a road network maintenance project, cost reduction of the subcontracted resources, a variant of the relocation problem, a network of activities with generally distributed durations through a Markov chain, idea on how to improve the return loading rate problem by integrating the sub-tour reversal approach with the method of the theory of constraints, an extended solution method for optimizing the bi-objective no-idle permutation flowshop scheduling problem, the burn-in (B/I) procedure, the Pareto-scheduling problem with two competing agents, and three preemptive Pareto-scheduling problems with two competing agents, among others. We hope that the book will be of interest to those working in the area of various scheduling problems and provide a bridge to facilitate the interaction between researchers and practitioners in scheduling questions. Although discrete mathematics is a common method to solve scheduling problems, the further development of this method is limited due to the lack of general principles, which poses a major challenge in this research field

    Machine scheduling with precedence constraints : (preprint)

    Get PDF

    Méthodes exactes et approchées pour le problème de gestion de projet à contraintes de ressources

    Get PDF
    Le problème de gestion de projet à contraintes de ressources est un des problèmesles plus étudiés dans la littérature. Il consiste à planifier des activités soumises à desrelations de précédence, et nécessitant des ressources renouvelables. L objectif est deminimiser la durée du projet, soit le makespan. Nous étudions le problème de gestion deprojet à contraintes de ressources. Nous nous sommes intéressées à la résolution exactedu problème. Dans la première partie de la thèse, nous élaborons une série de bornesinférieures basées sur le raisonnement énergétique et des formulations mathématiques.Les résultats montrent que les bornes proposées surpassent ceux de la littérature. Dansla deuxième partie, nous proposons des procédures par séparation et évaluation utilisantles bornes inférieures dévelopées dans la première partie.Resource Constrained Project Scheduling Problem is one of the most studied schedulingproblems in the literature. It consists in scheduling activities, submitted to precedencerelationship, and requiring renewable resources to be processed. The objective isto minimize the project duration, i.e., the makespan. We study the Resource ConstrainedProject Scheduling Problem. We are interested on the exact resolution of the problem.In the first part of the thesis, we develop a series of lower bounds based on energeticreasoning and mathematical formulations. The computational results show that theproposed lower bounds outperform the ones of the literature. In the second part, wepropose Branch-and-Bound procedures using the lower bounds developed on the firstpart.TOURS-Bibl.électronique (372610011) / SudocSudocFranceF
    corecore