757 research outputs found

    Construction site communication study using the RAM management system for BIM adaptation

    Get PDF
    The UK’s construction industry is witnessing an annual increase in costs due to a lack of communication between the different organizational operators on the construction site that often leads to construction defects. Meanwhile, a cost-reduction strategy plan using BIM has become a fundamental requirement for the government, aiming to keep costs under control. To facilitate BIM adoption in the industry, the BIM strategy was introduced in four phases, with each stage entailing a number of criteria. The industry has seen a global reaction to the Level 2 BIM program and a significant cost saving of 840M in 2013/14 in Europe. However, the industry is unable to match the level 3 BIM, where a collaborative model file server is required as a common sharable platform to achieve efficient communication. This study contributes toward formulating a communication framework in the UK industry to understand communication issues and manage defects. A survey was targeted at construction industry practitioners and academics, with a total number of 328 participants

    Development and validation of natural user interfaces for semantic enrichment of BIM models using open formats

    Get PDF
    Purpose: Despite the technological paradigm shift presented to the architecture, engineering, construction and operations sector (AECO), the full-fledged acceptance of the building information modelling (BIM) methodology has been slower than initially anticipated. Indeed, this study aims to acknowledge the need for increasing supportive technologies enabling the use of BIM, attending to available human resources, their requirements and their tasks. Design/methodology/approach: A complete case study is described, including the development process centred on design science research methodology followed by the usability assessment procedure validated by construction projects facility management operational staff. Findings: Results show that participants could interact with BIM using openBIM processes and file formats naturally, as most participants reached an efficiency level close to that expected for users already familiar with the interface (i.e. high-efficiency values). These results are consistent with the reported perceived satisfaction and analysis of participants’ discourses through 62 semi-structured interviews. Originality/value: The contributions of the present study are twofold: a proposal for a virtual reality openBIM framework is presented, particularly for the semantic enrichment of BIM models, and a methodology for evaluating the usability of this type of system in the AECO sector.info:eu-repo/semantics/publishedVersio

    An Interactive Visual Approach to Construction Project Scheduling

    Get PDF
    Sound project management is an important pillar of success for a construction company. Project schedules are the primary tools for communicating the thinking and planning by the management team to all the stakeholders in a construction project. Traditional project scheduling software have become an indispensable tool for managers in various project oriented industries for tracking the schedule, the budget and resource requirements of a project as well as for preparing reports, providing on-line access to project information and communication with the members of the project team. However, these benefits are realized only after the project information is entered into the computer and updated periodically. Setting up a computer schedule for a construction project requires entering into the computer not only all project activities and their durations and resource requirements but also organizing and sequencing of project activities. This requires considerable time and effort and consequently a full-scale time study is not usually performed for all projects. New parametric CAD software is revolutionizing the way architects, engineers and contractors work and can significantly increase construction management productivity by substantially reducing the manual work necessary for computerized construction scheduling. The data model of new parametric CAD software allows easy exchange of building design information among various software systems during design, construction and service life of projects. Research is underway at Marquette University to investigate how new parametric CAD software such as Autodesk Revit can improve construction scheduling and project control functions. The main objective of the research is to find a simple and intuitive way for transferring the necessary project information from an architectural CAD model to scheduling software and streamlining sequencing and organizing project activities. Achieving this objective will eliminate one of the most tedious and time consuming steps in creating a construction project schedule. The study proposes a visual approach to extracting project information and transferring them to scheduling software. In this approach, first a 3D model of the project is created using project\u27s digital Revit CAD files. Extraction, organizing, sequencing and transferring of project elements to scheduling software is performed during a walkthrough of the 3D model. During a walkthrough, the user can select a building element by pointing to the element. This capability allows the user to select both an element and its predecessors before executing a command that sends the information to the scheduling program. This approach reduces the tedious task of listing, organizing, sequencing, and transferring construction project information to scheduling software to a simple expedition inside the building
    • …
    corecore