40,116 research outputs found
Open source environment to define constraints in route planning for GIS-T
Route planning for transportation systems is strongly related to shortest path algorithms, an optimization problem extensively studied in the literature. To find the shortest path in a network one usually assigns weights to each branch to represent the difficulty of taking such branch. The weights construct a linear preference function ordering the variety of alternatives from the most to the least attractive.Postprint (published version
Challenges in Bridging Social Semantics and Formal Semantics on the Web
This paper describes several results of Wimmics, a research lab which names
stands for: web-instrumented man-machine interactions, communities, and
semantics. The approaches introduced here rely on graph-oriented knowledge
representation, reasoning and operationalization to model and support actors,
actions and interactions in web-based epistemic communities. The re-search
results are applied to support and foster interactions in online communities
and manage their resources
A Constrained Object Model for Configuration Based Workflow Composition
Automatic or assisted workflow composition is a field of intense research for
applications to the world wide web or to business process modeling. Workflow
composition is traditionally addressed in various ways, generally via theorem
proving techniques. Recent research observed that building a composite workflow
bears strong relationships with finite model search, and that some workflow
languages can be defined as constrained object metamodels . This lead to
consider the viability of applying configuration techniques to this problem,
which was proven feasible. Constrained based configuration expects a
constrained object model as input. The purpose of this document is to formally
specify the constrained object model involved in ongoing experiments and
research using the Z specification language.Comment: This is an extended version of the article published at BPM'05, Third
International Conference on Business Process Management, Nancy Franc
WESTT (Workload, Error, Situational Awareness, Time and Teamwork): An analytical prototyping system for command and control
Modern developments in the use of information technology within command and control allow unprecedented scope for flexibility in the way teams deal with tasks. These developments, together with the increased recognition of the importance of knowledge management within teams present difficulties for the analyst in terms of evaluating the impacts of changes to task composition or team membership. In this paper an approach to this problem is presented that represents team behaviour in terms of three linked networks (representing task, social network structure and knowledge) within the integrative WESTT software tool. In addition, by automating analyses of workload and error based on the same data that generate the networks, WESTT allows the user to engage in the process of rapid and iterative âanalytical prototypingâ. For purposes of illustration an example of the use of this technique with regard to a simple tactical vignette is presented
Internal representations, external representations and ergonomics: towards a theoretical integration
Requirements for building information modeling based lean production management systems for construction
Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last
Planner Systemâą, called âKanBIMâ, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face
- âŠ