678 research outputs found
Asymptotically Optimal Approximation Algorithms for Coflow Scheduling
Many modern datacenter applications involve large-scale computations composed
of multiple data flows that need to be completed over a shared set of
distributed resources. Such a computation completes when all of its flows
complete. A useful abstraction for modeling such scenarios is a {\em coflow},
which is a collection of flows (e.g., tasks, packets, data transmissions) that
all share the same performance goal.
In this paper, we present the first approximation algorithms for scheduling
coflows over general network topologies with the objective of minimizing total
weighted completion time. We consider two different models for coflows based on
the nature of individual flows: circuits, and packets. We design
constant-factor polynomial-time approximation algorithms for scheduling
packet-based coflows with or without given flow paths, and circuit-based
coflows with given flow paths. Furthermore, we give an -approximation polynomial time algorithm for scheduling circuit-based
coflows where flow paths are not given (here is the number of network
edges).
We obtain our results by developing a general framework for coflow schedules,
based on interval-indexed linear programs, which may extend to other coflow
models and objective functions and may also yield improved approximation bounds
for specific network scenarios. We also present an experimental evaluation of
our approach for circuit-based coflows that show a performance improvement of
at least 22% on average over competing heuristics.Comment: Fixed minor typo
Capacitated Vehicle Routing with Non-Uniform Speeds
The capacitated vehicle routing problem (CVRP) involves distributing
(identical) items from a depot to a set of demand locations, using a single
capacitated vehicle. We study a generalization of this problem to the setting
of multiple vehicles having non-uniform speeds (that we call Heterogenous
CVRP), and present a constant-factor approximation algorithm.
The technical heart of our result lies in achieving a constant approximation
to the following TSP variant (called Heterogenous TSP). Given a metric denoting
distances between vertices, a depot r containing k vehicles with possibly
different speeds, the goal is to find a tour for each vehicle (starting and
ending at r), so that every vertex is covered in some tour and the maximum
completion time is minimized. This problem is precisely Heterogenous CVRP when
vehicles are uncapacitated.
The presence of non-uniform speeds introduces difficulties for employing
standard tour-splitting techniques. In order to get a better understanding of
this technique in our context, we appeal to ideas from the 2-approximation for
scheduling in parallel machine of Lenstra et al.. This motivates the
introduction of a new approximate MST construction called Level-Prim, which is
related to Light Approximate Shortest-path Trees. The last component of our
algorithm involves partitioning the Level-Prim tree and matching the resulting
parts to vehicles. This decomposition is more subtle than usual since now we
need to enforce correlation between the size of the parts and their distances
to the depot
Integrated Batching and Lot Streaming with Variable Sublots and Sequence-Dependent Setups in a Two-Stage Hybrid Flow Shop
Consider a paint manufacturing firm whose customers typically place orders for two or more products simultaneously: liquid primer, top coat paint, and/or undercoat paint. Each product belongs to an associated product family that can be batched together during the manufacturing process. Meanwhile, each product can be split into several sublots so that overlapping production is possible in a two-stage hybrid flow shop. Various numbers of identical capacitated machines operate in parallel at each stage. We present a mixed-integer programming (MIP) to analyze this novel integrated batching and lot streaming problem with variable sublots, incompatible job families, and sequence-dependent setup times. The model determines the number of sublots for each product, the size of each sublot, and the production sequencing for each sublot such that the sum of weighted completion time is minimized. Several numerical example problems are presented to validate the proposed formulation and to compare results with similar problems in the literature. Furthermore, an experimental design based on real industrial data is used to evaluate the performance of proposed model. Results indicate that the computational cost of solving the model is high
Flow-time Optimization for Concurrent Open-Shop and Precedence Constrained Scheduling Models
Scheduling a set of jobs over a collection of machines is a fundamental problem that needs to be solved millions of times a day in various computing platforms: in operating systems, in large data clusters, and in data centers. Along with makespan, flow-time, which measures the length of time a job spends in a system before it completes, is arguably the most important metric to measure the performance of a scheduling algorithm. In recent years, there has been a remarkable progress in understanding flow-time based objective functions in diverse settings such as unrelated machines scheduling, broadcast scheduling, multi-dimensional scheduling, to name a few.
Yet, our understanding of the flow-time objective is limited mostly to the scenarios where jobs have no dependencies. On the other hand, in almost all real world applications, think of MapReduce settings for example, jobs have dependencies that need to be respected while making scheduling decisions. In this paper, we take first steps towards understanding this complex problem. In particular, we consider two classical scheduling problems that capture dependencies across jobs: 1) concurrent open-shop scheduling (COSSP) and 2) precedence constrained scheduling. Our main motivation to study these problems specifically comes from their relevance to two scheduling problems that have gained importance in the context of data centers: co-flow scheduling and DAG scheduling. We design almost optimal approximation algorithms for COSSP and PCSP, and show hardness results
On the use of biased-randomized algorithms for solving non-smooth optimization problems
Soft constraints are quite common in real-life applications. For example, in freight transportation, the fleet size can be enlarged by outsourcing part of the distribution service and some deliveries to customers can be postponed as well; in inventory management, it is possible to consider stock-outs generated by unexpected demands; and in manufacturing processes and project management, it is frequent that some deadlines cannot be met due to delays in critical steps of the supply chain. However, capacity-, size-, and time-related limitations are included in many optimization problems as hard constraints, while it would be usually more realistic to consider them as soft ones, i.e., they can be violated to some extent by incurring a penalty cost. Most of the times, this penalty cost will be nonlinear and even noncontinuous, which might transform the objective function into a non-smooth one. Despite its many practical applications, non-smooth optimization problems are quite challenging, especially when the underlying optimization problem is NP-hard in nature. In this paper, we propose the use of biased-randomized algorithms as an effective methodology to cope with NP-hard and non-smooth optimization problems in many practical applications. Biased-randomized algorithms extend constructive heuristics by introducing a nonuniform randomization pattern into them. Hence, they can be used to explore promising areas of the solution space without the limitations of gradient-based approaches, which assume the existence of smooth objective functions. Moreover, biased-randomized algorithms can be easily parallelized, thus employing short computing times while exploring a large number of promising regions. This paper discusses these concepts in detail, reviews existing work in different application areas, and highlights current trends and open research lines
Throughput Maximization in Multiprocessor Speed-Scaling
We are given a set of jobs that have to be executed on a set of
speed-scalable machines that can vary their speeds dynamically using the energy
model introduced in [Yao et al., FOCS'95]. Every job is characterized by
its release date , its deadline , its processing volume if
is executed on machine and its weight . We are also given a budget
of energy and our objective is to maximize the weighted throughput, i.e.
the total weight of jobs that are completed between their respective release
dates and deadlines. We propose a polynomial-time approximation algorithm where
the preemption of the jobs is allowed but not their migration. Our algorithm
uses a primal-dual approach on a linearized version of a convex program with
linear constraints. Furthermore, we present two optimal algorithms for the
non-preemptive case where the number of machines is bounded by a fixed
constant. More specifically, we consider: {\em (a)} the case of identical
processing volumes, i.e. for every and , for which we
present a polynomial-time algorithm for the unweighted version, which becomes a
pseudopolynomial-time algorithm for the weighted throughput version, and {\em
(b)} the case of agreeable instances, i.e. for which if and only
if , for which we present a pseudopolynomial-time algorithm. Both
algorithms are based on a discretization of the problem and the use of dynamic
programming
Parameterized complexity of machine scheduling: 15 open problems
Machine scheduling problems are a long-time key domain of algorithms and
complexity research. A novel approach to machine scheduling problems are
fixed-parameter algorithms. To stimulate this thriving research direction, we
propose 15 open questions in this area whose resolution we expect to lead to
the discovery of new approaches and techniques both in scheduling and
parameterized complexity theory.Comment: Version accepted to Computers & Operations Researc
On Idle Energy Consumption Minimization in Production: Industrial Example and Mathematical Model
This paper, inspired by a real production process of steel hardening,
investigates a scheduling problem to minimize the idle energy consumption of
machines. The energy minimization is achieved by switching a machine to some
power-saving mode when it is idle. For the steel hardening process, the mode of
the machine (i.e., furnace) can be associated with its inner temperature.
Contrary to the recent methods, which consider only a small number of machine
modes, the temperature in the furnace can be changed continuously, and so an
infinite number of the power-saving modes must be considered to achieve the
highest possible savings. To model the machine modes efficiently, we use the
concept of the energy function, which was originally introduced in the domain
of embedded systems but has yet to take roots in the domain of production
research. The energy function is illustrated with several application examples
from the literature. Afterward, it is integrated into a mathematical model of a
scheduling problem with parallel identical machines and jobs characterized by
release times, deadlines, and processing times. Numerical experiments show that
the proposed model outperforms a reference model adapted from the literature.Comment: Accepted to 9th International Conference on Operations Research and
Enterprise Systems (ICORES 2020
- âŠ