1,813 research outputs found

    Partial flexible job shop scheduling considering preventive maintenance and priorities

    Full text link
    [EN] In this paper, a new mathematical programming model is proposed for a partial flexible job shop scheduling problem with an integrated solution approach. The purpose of this model is the assignment of production operations to machines with the goal of simultaneously minimizing operating costs and penalties. These penalties include delayed delivery, deviation from a fixed time point for preventive maintenance, and deviation from the priorities of each machine. Considering the priorities for machines in partial flexible job shop scheduling problems can be a contribution in closer to the reality of production systems. For validation and evaluation of the effectiveness of the model, several numerical examples are solved by using the Baron solver in GAMS. Sensitivity analysis is performed for the model parameters. The results further indicate the relationship between scheduling according to priorities of each machine and production scheduling.Farahani, A.; Tohidi, H.; Khalaj, M.; Shoja, A. (2020). Partial flexible job shop scheduling considering preventive maintenance and priorities. WPOM-Working Papers on Operations Management. 11(2):27-48. https://doi.org/10.4995/wpom.v11i2.14187OJS274811

    Comparative study of heuristics algorithms in solving flexible job shop scheduling problem with condition based maintenance

    Get PDF
    Purpose: This paper focuses on a classic optimization problem in operations research, the flexible job shop scheduling problem (FJSP), to discuss the method to deal with uncertainty in a manufacturing system. Design/methodology/approach: In this paper, condition based maintenance (CBM), a kind of preventive maintenance, is suggested to reduce unavailability of machines. Different to the simultaneous scheduling algorithm (SSA) used in the previous article (Neale & Cameron,1979), an inserting algorithm (IA) is applied, in which firstly a pre-schedule is obtained through heuristic algorithm and then maintenance tasks are inserted into the pre-schedule scheme. Findings: It is encouraging that a new better solution for an instance in benchmark of FJSP is obtained in this research. Moreover, factually SSA used in literature for solving normal FJSPPM (FJSP with PM) is not suitable for the dynamic FJSPPM. Through application in the benchmark of normal FJSPPM, it is found that although IA obtains inferior results compared to SSA used in literature, it performs much better in executing speed. Originality/value: Different to traditional scheduling of FJSP, uncertainty of machines is taken into account, which increases the complexity of the problem. An inserting algorithm (IA) is proposed to solve the dynamic scheduling problem. It is stated that the quality of the final result depends much on the quality of the pre-schedule obtained during the procedure of solving a normal FJSP. In order to find the best solution of FJSP, a comparative study of three heuristics is carried out, the integrated GA, ACO and ABC. In the comparative study, we find that GA performs best in the three heuristic algorithms. Meanwhile, a new better solution for an instance in benchmark of FJSP is obtained in this research.Peer Reviewe

    The Integration of Maintenance Decisions and Flow Shop Scheduling

    Get PDF
    In the conventional production and service scheduling problems, it is assumed that the machines can continuously process the jobs and the information is complete and certain. However, in practice the machines must stop for preventive or corrective maintenance, and the information available to the planners can be both incomplete and uncertain. In this dissertation, the integration of maintenance decisions and production scheduling is studied in a permutation flow shop setting. Several variations of the problem are modeled as (stochastic) mixed-integer programs. In these models, some technical nuances are considered that increase the practicality of the models: having various types of maintenance, combining maintenance activities, and the impact of maintenance on the processing times of the production jobs. The solution methodologies involve studying the solution space of the problems, genetic algorithms, stochastic optimization, multi-objective optimization, and extensive computational experiments. The application of the problems and managerial implications are demonstrated through a case study in the earthmoving operations in construction projects

    Mixed-Integer Optimization Modeling for the Simultaneous Scheduling of Component Replacement and Repair

    Get PDF
    Maintenance is a critical aspect of many industries, playing an indispensable role in ensuring the optimal functionality, reliability, and longevity of various assets, equipment, and infrastructure. For a system to remain operational, maintenance of its components is required, and for the industry to optimize its operations, establishment of good maintenance policies and practices is vital.This thesis concerns the simultaneous scheduling of preventive maintenance for a fleet of aircraft and their common components along with the maintenance workshop, to which the components are sent for repair. The problem arises from an industrial project with the Swedish aerospace and defence company Saab. In the four papers underlying this thesis, we develop mathematical models\ua0 based on a mixed-binary linear optimization model of a preventive maintenance scheduling problem with so-called interval costs over a finite and discretized time horizon. We extend this scheduling model with the flow of components through the repair workshop, including stocks of spare components as well as of damaged components to be repaired. The components are modeled either individually, aggregated, or as jobs in the workshop, whose scheduling is considered to be preemptive or non-preemptive. Along with the scheduling, we address and analyze two contracting forms between the stakeholders---the aircraft operator and the repair workshop; namely, an availability of repaired components contract and a repair turn--around time contract of components sent to the repair workshop, leading to a bi-objective optimization problem for each of the two contracting forms. To handle the computational complexity of the problems at hand, we use Lagrangean relaxation and subgradient optimization to find lower bounding functions---in the objective space---of the set of non-dominated solutions, complemented with math-heuristics to identify good feasible solutions. Our modeling enables capturing important properties of the results from the contracting forms and it can be utilized for obtaining a lower limit on the optimal performance of a contracted collaboration between the stakeholders

    Integrating Preventive Maintenance Planning and Production Scheduling under Reentrant Job Shop

    Get PDF
    This paper focuses on a preventive maintenance plan and production scheduling problem under reentrant Job Shop in semiconductor production. Previous researches discussed production scheduling and preventive maintenance plan independently, especially on reentrant Job Shop. Due to reentrancy, reentrant Job Shop scheduling is more complex than the standard Job Shop which belongs to NP-hard problems. Reentrancy is a typical characteristic of semiconductor production. What is more, the equipment of semiconductor production is very expensive. Equipment failure will affect the normal production plan. It is necessary to maintain it regularly. So, we establish an integrated and optimal mathematical model. In this paper, we use the hybrid particle swarm optimization algorithm to solve the problem for it is highly nonlinear and discrete. The proposed model is evaluated through some simple simulation experiments and the results show that the model works better than the independent decision-making model in terms of minimizing maximum completion time

    Planning and Scheduling Optimization

    Get PDF
    Although planning and scheduling optimization have been explored in the literature for many years now, it still remains a hot topic in the current scientific research. The changing market trends, globalization, technical and technological progress, and sustainability considerations make it necessary to deal with new optimization challenges in modern manufacturing, engineering, and healthcare systems. This book provides an overview of the recent advances in different areas connected with operations research models and other applications of intelligent computing techniques used for planning and scheduling optimization. The wide range of theoretical and practical research findings reported in this book confirms that the planning and scheduling problem is a complex issue that is present in different industrial sectors and organizations and opens promising and dynamic perspectives of research and development
    • …
    corecore