14,222 research outputs found
Fast divide-and-conquer algorithms for preemptive scheduling problems with controllable processing times – A polymatroid optimization approach
We consider a variety of preemptive scheduling problems with controllable processing times on a single machine and on identical/uniform parallel machines, where the objective
is to minimize the total compression cost. In this paper, we propose fast divide-and-conquer algorithms for these scheduling problems. Our approach is based on the observation that each scheduling problem we discuss can be formulated as a polymatroid optimization problem.
We develop a novel divide-and-conquer technique for the polymatroid optimization problem and then apply it to each scheduling problem. We show that each scheduling problem can
be solved in O(Tfeas(n) log n) time by using our divide-and-conquer technique, where n is the number of jobs and Tfeas(n) denotes the time complexity of the corresponding feasible scheduling problem with n jobs. This approach yields faster algorithms for most of the scheduling problems discussed in this paper
Scheduling aircraft landings - the static case
This is the publisher version of the article, obtained from the link below.In this paper, we consider the problem of scheduling aircraft (plane) landings at an airport. This problem is one of deciding a landing time for each plane such that each plane lands within a predetermined time window and that separation criteria between the landing of a plane and the landing of all successive planes are respected. We present a mixed-integer zero–one formulation of the problem for the single runway case and extend it to the multiple runway case. We strengthen the linear programming relaxations of these formulations by introducing additional constraints. Throughout, we discuss how our formulations can be used to model a number of issues (choice of objective function, precedence restrictions, restricting the number of landings in a given time period, runway workload balancing) commonly encountered in practice. The problem is solved optimally using linear programming-based tree search. We also present an effective heuristic algorithm for the problem. Computational results for both the heuristic and the optimal algorithm are presented for a number of test problems involving up to 50 planes and four runways.J.E.Beasley. would like to acknowledge the financial support of the Commonwealth Scientific and Industrial Research Organization, Australia
On Idle Energy Consumption Minimization in Production: Industrial Example and Mathematical Model
This paper, inspired by a real production process of steel hardening,
investigates a scheduling problem to minimize the idle energy consumption of
machines. The energy minimization is achieved by switching a machine to some
power-saving mode when it is idle. For the steel hardening process, the mode of
the machine (i.e., furnace) can be associated with its inner temperature.
Contrary to the recent methods, which consider only a small number of machine
modes, the temperature in the furnace can be changed continuously, and so an
infinite number of the power-saving modes must be considered to achieve the
highest possible savings. To model the machine modes efficiently, we use the
concept of the energy function, which was originally introduced in the domain
of embedded systems but has yet to take roots in the domain of production
research. The energy function is illustrated with several application examples
from the literature. Afterward, it is integrated into a mathematical model of a
scheduling problem with parallel identical machines and jobs characterized by
release times, deadlines, and processing times. Numerical experiments show that
the proposed model outperforms a reference model adapted from the literature.Comment: Accepted to 9th International Conference on Operations Research and
Enterprise Systems (ICORES 2020
Practical solutions for a dock assignment problem with trailer transportation.
We study a distribution warehouse in which trailers need to be assigned to docks for loading or unloading. A parking lot is used as a buffer zone and transportation between the parking lot and the docks is performed by auxiliary resources called terminal tractors. Each incoming trailer has a known arrival time and each outgoing trailer a desired departure time. The primary objective is to produce a docking schedule such that the weighted sum of the number of late outgoing trailers and the tardiness of these trailers is minimized; the secondary objective is to minimize the weighted completion time of all trailers, both incoming and outgoing. The purpose of this paper is to produce high-quality solutions to large instances that are comparable to a real-life case. We implement several heuristic algorithms: truncated branch and bound, beam search and tabu search. Lagrangian relaxation is embedded in the algorithms for constructing an initial solution and for computing lower bounds. The different solution frameworks are compared via extensive computational experiments.Dock assignment; Multicriteria scheduling; Branch and bound; Beam search; Lagrangian relaxation; Tabu search;
- …