563 research outputs found

    Annual ADP planning document

    Get PDF
    The Category A computer systems at KSC (Al and A2) which perform scientific and business/administrative operations are described. This data division is responsible for scientific requirements supporting Saturn, Atlas/Centaur, Titan/Centaur, Titan III, and Delta vehicles, and includes realtime functions, Apollo-Soyuz Test Project (ASTP), and the Space Shuttle. The work is performed chiefly on the GEL-635 (Al) system located in the Central Instrumentation Facility (CIF). The Al system can perform computations and process data in three modes: (1) real-time critical mode; (2) real-time batch mode; and (3) batch mode. The Division's IBM-360/50 (A2) system, also at the CIF, performs business/administrative data processing such as personnel, procurement, reliability, financial management and payroll, real-time inventory management, GSE accounting, preventive maintenance, and integrated launch vehicle modification status

    Operations analysis (study 2.1): Shuttle upper stage software requirements

    Get PDF
    An investigation of software costs related to space shuttle upper stage operations with emphasis on the additional costs attributable to space servicing was conducted. The questions and problem areas include the following: (1) the key parameters involved with software costs; (2) historical data for extrapolation of future costs; (3) elements of the basic software development effort that are applicable to servicing functions; (4) effect of multiple servicing on complexity of the operation; and (5) are recurring software costs significant. The results address these questions and provide a foundation for estimating software costs based on the costs of similar programs and a series of empirical factors

    Cycle O (CY 1991) NLS trade studies and analyses, book 2. Part 1: Avionics and systems

    Get PDF
    An assessment was conducted to determine the maximum LH2 tank stretch capability based on the constraints of the manufacturing, tooling and facilities at the Michoud Assembly Facility in New Orleans, Louisiana. The maximum tank stretch was determined to be 5 ft. with minor or no modifications, a stretch of 11 ft. with some possible facility modifications and beyond 11 ft. significant new facilities are required. A cost analysis was performed to evaluate the impacts for various stretch lengths. Tasks that were defined to perform trades and studies regarding the best approach to meet requirements for the National Launch System Avionics are also discussed

    The writers guide to NASA

    Get PDF
    NASA services of interest to writers and to the news media include personal interviews, daily audio reports of major missions, and projects via automated telephone, research assistance from historians or history monitors at technical libraries, the use of a collection of historical photographs, and the free loan of sound films of NASA research and development activities. The names and phones numbers are listed for public affairs contacts at Headquarters and at each of the major centers and their component installations. An overview of the six NASA program offices is included along with a vicinity map of each center and a description of their facilities and management responsibilities

    A summary of major NASA launchings, 1 October 1958 - 30 September 1973

    Get PDF
    This report was compiled from several different sources. Documents consulted included: Operations Summaries, post-launch Flash Flight Reports, Final Field Reports, Mission Operations Reports (both pre-launch and post-launch), and Satellite Situation Reports. Other major references were publications of the NASA Historical Office, such as: Aeronautics and Astronautics 1916-1960; Aeronautical and Astronautical Events of 1961-1962; Aeronautics and Astronautics (yearly editions since 1963); and NASA's Pocket Statistics (published monthly.) The report is divided into projects within broad mission categories, with each project being treated chronologically. Mission results have been categorized as: successful (S); unsuccessful (U); or, partially successful (P). These are arbitrary classifications, made after a comparison of objectives and actual results

    Application of advanced technology to space automation

    Get PDF
    Automated operations in space provide the key to optimized mission design and data acquisition at minimum cost for the future. The results of this study strongly accentuate this statement and should provide further incentive for immediate development of specific automtion technology as defined herein. Essential automation technology requirements were identified for future programs. The study was undertaken to address the future role of automation in the space program, the potential benefits to be derived, and the technology efforts that should be directed toward obtaining these benefits

    On the Shoulders of Titans: A History of Project Gemini

    Get PDF
    Gemini was the intermediate manned space flight program between America's first steps into space with Mercury and the manned lunar expeditions of Apollo. Because of its position between these two other efforts, Gemini is probably less remembered. Still, it more than had its place in man's progress into this new frontier. Gemini accomplishments were manyfold. They included many firsts: first astronaut-controlled maneuvering in space; first rendezvous in space of one spacecraft with another; first docking of one spacecraft with a propulsive stage and use of that stage to transfer man to high altitude; first traverse of man into the earth's radiation belts; first extended manned flights of a week or more in duration; first extended stays of man outside his spacecraft; first controlled reentry and precision landing; and many more. These achievements were significant in ways one cannot truly evaluate even today, but two things stand out: (1) it was the time when America caught up and surpassed the Soviet Union in manned space flight, and (2) these demonstrations of capability were an absolute prerequisite to the phenomenal Apollo accomplishments then yet to come

    Twenty-first semiannual report to Congress, 1 January - 30 June 1969

    Get PDF
    Manned space flights, satellite observations, space sciences, and air traffic control - NASA report to Congress for 1 Jan. to 30 June 196

    The Apollo spacecraft: A chronology, volume 3, 1 October 1964 - 20 January 1966

    Get PDF
    The development of the Apollo spacecraft is traced along with that of Saturn V. Emphasis is placed on the detailed engineering design and exhaustive testing performed to qualify both the command and service modules and the lunar module for manned flight
    • …
    corecore