1,466 research outputs found

    Notes on Max Flow Time Minimization with Controllable Processing Times

    Get PDF
    In a scheduling problem with controllable processing times the job processing time can be compressed through incurring an additional cost. We consider the identical parallel machines max flow time minimization problem with controllable processing times. We address the preemptive and non-preemptive version of the problem. For the preemptive case, a linear programming formulation is presented which solves the problem optimally in polynomial time. For the non-preemptive problem it is shown that the First In First Out (FIFO) heuristic has a tight worst-case performance of 3−2/m, when jobs processing times and costs are set as in some optimal preemptive schedul

    Serial-batch scheduling – the special case of laser-cutting machines

    Get PDF
    The dissertation deals with a problem in the field of short-term production planning, namely the scheduling of laser-cutting machines. The object of decision is the grouping of production orders (batching) and the sequencing of these order groups on one or more machines (scheduling). This problem is also known in the literature as "batch scheduling problem" and belongs to the class of combinatorial optimization problems due to the interdependencies between the batching and the scheduling decisions. The concepts and methods used are mainly from production planning, operations research and machine learning

    Resource Management in Machine Scheduling Problems: A Survey

    Get PDF
    The paper is a survey devoted to job scheduling problems with resource allocation. We present the results available in the scientific literature for commonly used models of job processing times and job release dates, i.e., the models in which the job processing time or the job release date is given as a linear or convex function dependent on the amount of the additional resource allotted to the job. The scheduling models with resource dependent processing times or resource dependent release dates extend the classical scheduling models to reflect more precisely scheduling problems that appear in real life. Thus, in this paper we present the computational complexity results and solution algorithms that have been developed for this kind of problems

    A PTAS for single machine scheduling with controllable processing times

    Get PDF
    We deal with a single machine scheduling problem in which each job has a release date, a delivery time and a controllable processing time. The fact that the jobs have a controllable processing time means that it is allowed to compress (a part of) the processing time of the job, in return for compression cost. The objective is to find a schedule that minimizes the total cost, that is, the latest delivery time of any job plus the total compression cost. In this note we discuss how the techniques of Hall and Shmoys [3] and Hall [1] can directly be applied to design a polynomial time approximation scheme for this problem

    Realization of an Optimal Schedule for the Two-machine Flow-Shop with Interval Job Processing Times

    Get PDF
    Non-preemptive two-machine flow-shop scheduling problem with uncertain processing times of n jobs is studied. In an uncertain version of a scheduling problem, there may not exist a unique schedule that remains optimal for all possible realizations of the job processing times. We find necessary and sufficient conditions (Theorem 1) when there exists a dominant permutation that is optimal for all possible realizations of the job processing times. Our computational studies show the percentage of the problems solvable under these conditions for the cases of randomly generated instances with n ≤ 100 . We also show how to use additional information about the processing times of the completed jobs during optimal realization of a schedule (Theorems 2 – 4). Computational studies for randomly generated instances with n ≤ 50 show the percentage of the two- machine flow-shop scheduling problems solvable under the sufficient conditions given in Theorems 2 – 4

    Machine Scheduling with Resource Dependent Processing Times

    Get PDF
    We consider several parallel machine scheduling settings with the objective to minimize the schedule makespan. The most general of these settings is unrelated parallel machine scheduling. We assume that, in addition to its machine dependence, the processing time of any job is dependent on the usage of a scarce renewable resource. A given amount of that resource, e.g. workers, can be distributed over the jobs in process at any time, and the more of that resource is allocated to a job, the smaller is its processing time. This model generalizes classical machine scheduling problems, adding a time-resource tradeoff. It is also a natural variant of a generalized assignment problem studied previously by Shmoys and Tardos. On the basis of integer programming formulations for relaxations of the respective problems, we use LP rounding techniques to allocate resources to jobs, and to assign jobs to machines. Combined with Graham''s list scheduling, we thus prove the existence of constant factor approximation algorithms. Our performance guarantee is 6.83 for the most general case of unrelated parallel machine scheduling. We improve this bound for two special cases, namely to 5.83 whenever the jobs are assigned to machines beforehand, and to (5+e), e>0, whenever the processing times do not depend on the machine. Moreover, we discuss tightness of the relaxations, and derive inapproximability results.operations research and management science;

    A common framework and taxonomy for multicriteria scheduling problems with Interfering and competing Jobs: Multi-agent scheduling problems

    Get PDF
    Most classical scheduling research assumes that the objectives sought are common to all jobs to be scheduled. However, many real-life applications can be modeled by considering different sets of jobs, each one with its own objective(s), and an increasing number of papers addressing these problems has appeared over the last few years. Since so far the area lacks a uni ed view, the studied problems have received different names (such as interfering jobs, multi-agent scheduling, mixed-criteria, etc), some authors do not seem to be aware of important contributions in related problems, and solution procedures are often developed without taking into account existing ones. Therefore, the topic is in need of a common framework that allows for a systematic recollection of existing contributions, as well as a clear de nition of the main research avenues. In this paper we review multicriteria scheduling problems involving two or more sets of jobs and propose an uni ed framework providing a common de nition, name and notation for these problems. Moreover, we systematically review and classify the existing contributions in terms of the complexity of the problems and the proposed solution procedures, discuss the main advances, and point out future research lines in the topic

    Scheduling with tool changes to minimize total completion time under controllable machining conditions

    Get PDF
    Cataloged from PDF version of article.Scheduling under controllable machining conditions has been studied for some time. Scheduling with tool changes, particularly due to tool wear, has just begun to receive attention. Though machining conditions impact tool wear and induce tool change, the two issues have not been considered together.We address for the first time the problem of scheduling a computer numerically controlled (CNC) machine subject to tool changes and controllable machining conditions; our objective is to minimize the total completion time of a given set of jobs. We establish an important result that helps us identify feasible settings of machining parameters such as feed rate and cutting speed. However, the problem at hand remains intractable, even when a single setting is used. In the general case, we are able to solve the problem exactly for up to 30 jobs using a mixed integer linear programming formulation. For larger problems, we turn to approximate solution via heuristics. We examine a number of different schemes. The best of these schemes are used in a problem space genetic algorithm; this produces quality solutions in a time-efficient manner, as is evidenced from an extensive computational study conducted by us. 2005 Elsevier Ltd. All rights reserved

    A fast FPTAS for single machine scheduling problem of minimizing total weighted earliness and tardiness about a large common due date

    Get PDF
    We address the single machine scheduling problem to minimize the total weighted earliness and tardiness about a nonrestrictive common due date. This is a basic problem with applications to the just-in-time manufacturing. The problem is linked to a Boolean programming problem with a quadratic objective function, known as the half-product. An approach to developing a fast fully polynomial-time approximation scheme (FPTAS) for the problem is identified and implemented. The running time matches the best known running time for an FPTAS for minimizing a half-product with no additive constan