11,636 research outputs found
Parameterized complexity of machine scheduling: 15 open problems
Machine scheduling problems are a long-time key domain of algorithms and
complexity research. A novel approach to machine scheduling problems are
fixed-parameter algorithms. To stimulate this thriving research direction, we
propose 15 open questions in this area whose resolution we expect to lead to
the discovery of new approaches and techniques both in scheduling and
parameterized complexity theory.Comment: Version accepted to Computers & Operations Researc
Approximate Deadline-Scheduling with Precedence Constraints
We consider the classic problem of scheduling a set of n jobs
non-preemptively on a single machine. Each job j has non-negative processing
time, weight, and deadline, and a feasible schedule needs to be consistent with
chain-like precedence constraints. The goal is to compute a feasible schedule
that minimizes the sum of penalties of late jobs. Lenstra and Rinnoy Kan
[Annals of Disc. Math., 1977] in their seminal work introduced this problem and
showed that it is strongly NP-hard, even when all processing times and weights
are 1. We study the approximability of the problem and our main result is an
O(log k)-approximation algorithm for instances with k distinct job deadlines
Asymptotically Optimal Approximation Algorithms for Coflow Scheduling
Many modern datacenter applications involve large-scale computations composed
of multiple data flows that need to be completed over a shared set of
distributed resources. Such a computation completes when all of its flows
complete. A useful abstraction for modeling such scenarios is a {\em coflow},
which is a collection of flows (e.g., tasks, packets, data transmissions) that
all share the same performance goal.
In this paper, we present the first approximation algorithms for scheduling
coflows over general network topologies with the objective of minimizing total
weighted completion time. We consider two different models for coflows based on
the nature of individual flows: circuits, and packets. We design
constant-factor polynomial-time approximation algorithms for scheduling
packet-based coflows with or without given flow paths, and circuit-based
coflows with given flow paths. Furthermore, we give an -approximation polynomial time algorithm for scheduling circuit-based
coflows where flow paths are not given (here is the number of network
edges).
We obtain our results by developing a general framework for coflow schedules,
based on interval-indexed linear programs, which may extend to other coflow
models and objective functions and may also yield improved approximation bounds
for specific network scenarios. We also present an experimental evaluation of
our approach for circuit-based coflows that show a performance improvement of
at least 22% on average over competing heuristics.Comment: Fixed minor typo
Single machine scheduling problems with uncertain parameters and the OWA criterion
In this paper a class of single machine scheduling problems is discussed. It
is assumed that job parameters, such as processing times, due dates, or weights
are uncertain and their values are specified in the form of a discrete scenario
set. The Ordered Weighted Averaging (OWA) aggregation operator is used to
choose an optimal schedule. The OWA operator generalizes traditional criteria
in decision making under uncertainty, such as the maximum, average, median or
Hurwicz criterion. It also allows us to extend the robust approach to
scheduling by taking into account various attitudes of decision makers towards
the risk. In this paper a general framework for solving single machine
scheduling problems with the OWA criterion is proposed and some positive and
negative computational results for two basic single machine scheduling problems
are provided
Single-machine scheduling with stepwise tardiness costs and release times
We study a scheduling problem that belongs to the yard operations component of the railroad planning problems, namely the hump sequencing problem. The scheduling problem is characterized as a single-machine problem with stepwise tardiness cost objectives. This is a new scheduling criterion which is also relevant in the context of traditional machine scheduling problems. We produce complexity results that characterize some cases of the problem as pseudo-polynomially solvable. For the difficult-to-solve cases of the problem, we develop mathematical programming formulations, and propose heuristic algorithms. We test the formulations and heuristic algorithms on randomly generated single-machine scheduling problems and real-life datasets for the hump sequencing problem. Our experiments show promising results for both sets of problems
Lift-and-Round to Improve Weighted Completion Time on Unrelated Machines
We consider the problem of scheduling jobs on unrelated machines so as to
minimize the sum of weighted completion times. Our main result is a
-approximation algorithm for some fixed , improving upon the
long-standing bound of 3/2 (independently due to Skutella, Journal of the ACM,
2001, and Sethuraman & Squillante, SODA, 1999). To do this, we first introduce
a new lift-and-project based SDP relaxation for the problem. This is necessary
as the previous convex programming relaxations have an integrality gap of
. Second, we give a new general bipartite-rounding procedure that produces
an assignment with certain strong negative correlation properties.Comment: 21 pages, 4 figure
Malleable Scheduling Beyond Identical Machines
In malleable job scheduling, jobs can be executed simultaneously on multiple machines with the processing time depending on the number of allocated machines. Jobs are required to be executed non-preemptively and in unison, in the sense that they occupy, during their execution, the same time interval over all the machines of the allocated set. In this work, we study generalizations of malleable job scheduling inspired by standard scheduling on unrelated machines. Specifically, we introduce a general model of malleable job scheduling, where each machine has a (possibly different) speed for each job, and the processing time of a job j on a set of allocated machines S depends on the total speed of S for j. For machines with unrelated speeds, we show that the optimal makespan cannot be approximated within a factor less than e/(e-1), unless P = NP. On the positive side, we present polynomial-time algorithms with approximation ratios 2e/(e-1) for machines with unrelated speeds, 3 for machines with uniform speeds, and 7/3 for restricted assignments on identical machines. Our algorithms are based on deterministic LP rounding and result in sparse schedules, in the sense that each machine shares at most one job with other machines. We also prove lower bounds on the integrality gap of 1+phi for unrelated speeds (phi is the golden ratio) and 2 for uniform speeds and restricted assignments. To indicate the generality of our approach, we show that it also yields constant factor approximation algorithms (i) for minimizing the sum of weighted completion times; and (ii) a variant where we determine the effective speed of a set of allocated machines based on the L_p norm of their speeds
Throughput Maximization in Multiprocessor Speed-Scaling
We are given a set of jobs that have to be executed on a set of
speed-scalable machines that can vary their speeds dynamically using the energy
model introduced in [Yao et al., FOCS'95]. Every job is characterized by
its release date , its deadline , its processing volume if
is executed on machine and its weight . We are also given a budget
of energy and our objective is to maximize the weighted throughput, i.e.
the total weight of jobs that are completed between their respective release
dates and deadlines. We propose a polynomial-time approximation algorithm where
the preemption of the jobs is allowed but not their migration. Our algorithm
uses a primal-dual approach on a linearized version of a convex program with
linear constraints. Furthermore, we present two optimal algorithms for the
non-preemptive case where the number of machines is bounded by a fixed
constant. More specifically, we consider: {\em (a)} the case of identical
processing volumes, i.e. for every and , for which we
present a polynomial-time algorithm for the unweighted version, which becomes a
pseudopolynomial-time algorithm for the weighted throughput version, and {\em
(b)} the case of agreeable instances, i.e. for which if and only
if , for which we present a pseudopolynomial-time algorithm. Both
algorithms are based on a discretization of the problem and the use of dynamic
programming
Reallocation Problems in Scheduling
In traditional on-line problems, such as scheduling, requests arrive over
time, demanding available resources. As each request arrives, some resources
may have to be irrevocably committed to servicing that request. In many
situations, however, it may be possible or even necessary to reallocate
previously allocated resources in order to satisfy a new request. This
reallocation has a cost. This paper shows how to service the requests while
minimizing the reallocation cost. We focus on the classic problem of scheduling
jobs on a multiprocessor system. Each unit-size job has a time window in which
it can be executed. Jobs are dynamically added and removed from the system. We
provide an algorithm that maintains a valid schedule, as long as a sufficiently
feasible schedule exists. The algorithm reschedules only a total number of
O(min{log^* n, log^* Delta}) jobs for each job that is inserted or deleted from
the system, where n is the number of active jobs and Delta is the size of the
largest window.Comment: 9 oages, 1 table; extended abstract version to appear in SPAA 201
- …