    Application of design science research to design a modelling approach for procurement of infrastructure systems

    Full text link
    Š 2019 IEEE. Model-driven approaches are widely used in managing the complex domains such as infrastructure systems or disaster management. The foundation of conducting a systematic research is designing a methodology that pertinently covers the steps of research from problem definition to solution proposal and then identifying or tailoring a method for developing and validating the solution. This paper explains the application of Design Science for conducting a research which aims at providing a model-driven approach for addressing the complexities of infrastructure procurement projects. So firstly the design science artefacts are adopted for designing the method for this research. Then the steps of this method are explained briefly along with description of how each step is applied in this research. The core of this method is proposing a process for developing and validating the metamodels which is designed based on combination of other metamodeling processes

    CRC for Construction Innovation : annual report 2008-2009

    Get PDF

    Building information modelling (BIM) implementation and remote construction projects: issues, challenges, and critiques.

    Get PDF
    The construction industry has been facing a paradigm shift to (i) increase productivity, efficiency, infrastructure value; quality and sustainability (ii) reduce lifecycle costs, lead times and duplications via effective collaboration and communication of stakeholders in construction projects. This paradigm shift is becoming more critical with remote construction projects, which reveals unique and even more complicated challenging problems in relation to communication and management due to the remoteness of the construction sites. On the other hand, Building Informational Modelling (BIM) is offered by some as the panacea to addressing the interdisciplinary inefficiencies in construction projects. Although in many cases the adoption of BIM has numerous potential benefits, it also raises interesting challenges with regards to how BIM integrates the business processes of individual practices. This paper aims to show how BIM adoption for an architectural company helps to mitigate the management and communication problems in remote construction project. The paper adopts a case study methodology, which is a UK Knowledge Transfer Partnership (KTP) project of BIM adoption between the University of Salford, UK and John McCall Architects (JMA), in which the BIM use between the architectural company and the main contractor for a remote construction project is elaborated and justified. Research showed that the key management and communication problems such as poor quality of construction works, unavailability of materials, and ineffective planning and scheduling can largely be mitigated by adopting BIM at the design stage

    Infrastructure transitions toward sustainability: a complex adaptive systems perspective

    Get PDF
    To ensure infrastructure assets are procured and maintained by government on behalf of citizens, appropriate policy and institutional architecture is needed, particularly if a fundamental shift to more sustainable infrastructure is the goal. The shift in recent years from competitive and resource-intensive procurement to more collaborative and sustainable approaches to infrastructure governance is considered a major transition in infrastructure procurement systems. In order to better understand this transition in infrastructure procurement arrangements, the concept of emergence from Complex Adaptive Systems (CAS) theory is offered as a key construct. Emergence holds that micro interactions can result in emergent macro order. Applying the concept of emergence to infrastructure procurement, this research examines how interaction of agents in individual projects can result in different industry structural characteristics. The paper concludes that CAS theory, and particularly the concept of ‘emergence’, provides a useful construct to understand infrastructure procurement dynamics and progress towards sustainability

    Implementing 5D BIM on construction projects: Contractor perspectives from the UK construction sector

    Get PDF
    This is an accepted manuscript of an article published by Emerald in Journal of Engineering, Design and Technology on 09/05/2020: https://doi.org/10.1108/JEDT-01-2020-0007 The accepted version of the publication may differ from the final published version.Purpose The purpose of this paper is to report on primary research findings that sought to investigate and analyse salient issues on the implementation of 5D building information modelling (BIM) from the UK contractors’ perspective. Previous research and efforts have predominantly focussed on the use of technologies for cost estimation and quantity takeoff within a more traditional-led procurement, with a paucity of research focussing on how 5D BIM could facilitate costing within contractor-led procurement. This study fills this current knowledge gap and enhances the understanding of the specific costing challenges faced by contractors in contractor-led projects, leading to the development of 5D framework for use in future projects. Design/methodology/approach To develop a fully detailed understanding of the challenges and issues being faced in this regard, a phenomenological, qualitative-based study was undertaken through interviews involving 21 participants from UK-wide construction organisations. A thematic data analytical process was applied to the data to derive key issues, and this was then used to inform the development of a 5D-BIM costing framework. Findings Multi-disciplinary findings reveal a range of issues faced by contractors when implementing 5D BIM. These exist at strategic, operational and technological levels which require addressing successful implementation of 5D BIM on contractor-led projects adhering to Level 2 BIM standards. These findings cut across the range of stakeholders on contractor-led projects. Ultimately, the findings suggest strong commitment and leadership from organisational management are required to facilitate cost savings and generate accurate cost information. Practical implications This study highlights key issues for any party seeking to effectively deploy 5D BIM on a contractor-led construction project. A considerable cultural shift towards automating and digitising cost functions virtually, stronger collaborative working relationship relative to costing in design development, construction practice, maintenance and operation is required. Originality/value By analysing findings from primary research data, the work concludes with the development of a 5D BIM costing framework to support contractor-led projects which can be implemented to ensure that 5D BIM is successfully implemented
    • …