3,814 research outputs found

    An economic lot and delivery scheduling problem with the fuzzy shelf life in a flexible job shop with unrelated parallel machines

    Get PDF
    This paper considers an economic lot and delivery scheduling problem (ELDSP) in a fuzzy environment with the fuzzy shelf life for each product. This problem is formulated in a flexible job shop with unrelated parallel machines, when the planning horizon is finite and it determines lot sizing, scheduling and sequencing, simultaneously. The proposed model of this paper is based on the basic period (BP) approach. In this paper, a mixed-integer nonlinear programming (MINLP) model is presented and then it is changed into two models in the fuzzy shelf life. The main model is dependent to the multiple basic periods and it is difficult to solve the resulted proposed model for large-scale problems in reasonable amount of time; thus, an efficient heuristic method is proposed to solve the problem. The performance of the proposed model is demonstrated using some numerical examples

    Determining cycle time for a multi-product FPR model with rework and an improved delivery policy by alternative approach

    Get PDF
    The present study determines the common cycle time for a multi-product finite production rate (FPR) model with rework and an improved delivery policy [1] by an alternative approach. Conventional method to the multi-product FPR problem employs the differential calculus to first prove convexity of the system cost function, then to derive the optimal common production cycle time that minimizes the long-run average system cost per unit time; whereas the proposed approach obtains the optimal cycle time without the need to reference the differential calculus. Such a simplified method may help those practitioners who have insufficient knowledge of calculus to effectively manage the real-life multi-product FPR problem

    Cycle Time Analysis For Photolithography Tools In Semiconductor Manufacturing Industry With Simulation Model : A Case Study [TR940. S618 2008 f rb].

    Get PDF
    Perkembangan industri semikonduktor dalam bidang fabrikasi biasanya melibatkan kos pelaburan yang tinggi terutamanya dalam alatan photolithography. The industry of semiconductor wafer fabrication (“fab”) has invested a huge amount of capital on the manufacturing equipments particular in photolithograph

    Workforce scheduling and planning : a combinatorial approach

    Get PDF
    This thesis investigates solution methodologies for concrete combinatorial problems in scheduling and planning. In all considered problems, it is assumed that the available information does not change over time; hence these problems have a deterministic structure. The problems studied in this thesis are divided into two groups; \workforce scheduling" and \planning". In workforce scheduling, the center problem is to build a schedule of tasks and technicians. It is assumed that the time line is split into workdays. In every workday, tasks must be grouped as sequences, each being performed by a team of technicians. Skill requirements of every task in a sequence must be met by the assigned team. This scheduling problem with some other aspects is di??cult to solve quickly and e??ciently. We developed a Mixed Integer Programming (MIP) based heuristic approach to tackle this complex scheduling problem. Our MIP model is basically a formulation of the matching problem on bipartite graphs and it enabled us to have a global way of assigning technicians to tasks. It is capable of revising technician-task allocations and performs very well, especially in the case of rare skills. A workday schedule of the aforementioned problem includes many-to-one type workforce assignments. As the second problem in workforce scheduling, stability of these workforce assignments is investigated. The stability de??nition of Gale-Shapley on the Marriage model is extended to the setting of multi-skill workforce assignments. It is shown that ??nding stable assignments is NP-hard. In some special cases stable assignments can be constructed in polynomial time. For the general case, we give linear inequalities of binary variables that describe the set of stable assignments. We propose a MIP model including these linear inequalities. To the best of our knowledge, the Gale-Shapley stability is not studied under the multi-skill workforce scheduling framework so far in the literature. The closed form description of stable assignments is also the ??rst embedding of the Gale-Shapley stability concept into an NP-complete problem. In the second problem group, two vehicle related problems are studied; the "dial a ride problem" and the "vehicle refueling problem". In the former, the goal is to check whether a list of pick-up and delivery tasks can be achieved under several timing constraints. It is shown this feasibility testing can be done in linear time using interval graphs. In the vehicle refueling problem, the goal is to make refueling decisions to reach a destination such that the cost of the travel is minimized. A greedy algorithm is presented to ??nd optimal refueling decisions. Moreover, it is shown that the vehicle refueling problem is equivalent to a ow problem on a special network

    A survey of scheduling problems with setup times or costs

    Get PDF
    Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    Mathematics in the Supply Chain

    Get PDF
    [no abstract available
    corecore