15 research outputs found

    Development of a Novel Integrated CCSD-ITARA-MARCOS Decision-Making Approach for Stackers Selection in a Logistics System

    Get PDF
    The main goal of this paper is to propose a Multiple-Criteria Decision-Making (MCDM) approach that will facilitate decision-making in the field of logistics—i.e., in the selection of the optimal equipment for performing a logistics activity. For defining the objective weights of the criteria, the correlation coefficient and the standard deviation (CCSD method) are applied. Furthermore, for determining the semi-objective weights of the considered criteria, the indifference threshold-based attribute ratio analysis method (ITARA) is used. In this way, by combining these two methods, the weights of the criteria are determined with a higher degree of reliability. For the final ranking of the alternatives, the measurement of alternatives and ranking according to the compromise solution method (MARCOS) is utilized. For demonstrating the applicability of the proposed approach, an illustrative case study pointing to the selection of the best manual stacker for a small warehouse is performed. The final results are compared with the ones obtained using the other proved MCDM methods that confirmed the reliability and stability of the proposed approach. The proposed integrated approach shows itself as a suitable technique for applying in the process of logistics equipment selection, because it defines the most influential criteria and the optimal choice with regard to all of them in a relatively easy and comprehensive way. Additionally, conceiving the determination of the criteria with the combination of objective and semi-objective methods enables defining the objective weights concerning the attitudes of the involved decision-makers, which finally leads to more reliable result

    Algorithms for probabilistic uncertain linguistic multiple attribute group decision making based on the GRA and CRITIC method: application to location planning of electric vehicle charging stations

    Get PDF
    Electric vehicles (EVs) could be regarded as one of the most innovative and high technologies all over the world to cope with the fossil fuel energy resource crisis and environmental pollution issues. As the initiatory task of EV charging station (EVCS) construction, site selection play an important part throughout the whole life cycle, which is deemed to be multiple attribute group decision making (MAGDM) problem involving many experts and many conflicting attributes. In this paper, a grey relational analysis (GRA) method is investigated to tackle the probabilistic uncertain linguistic MAGDM in which the attribute weights are completely unknown information. Firstly, the definition of the expected value is then employed to objectively derive the attribute weights based on the CRiteria Importance Through Intercriteria Correlation (CRITIC) method. Then, the optimal alternative is chosen by calculating largest relative relational degree from the probabilistic uncertain linguistic positive ideal solution (PULPIS) which considers both the largest grey relational coefficient from the PULPIS and the smallest grey relational coefficient from the probabilistic uncertain linguistic negative ideal solution (PULNIS). Finally, a numerical case for site selection of electric vehicle charging stations (EVCS) is designed to illustrate the proposed method. The result shows the approach is simple, effective and easy to calculate

    An integrated and comprehensive fuzzy multicriteria model for supplier selection in digital supply chains

    Get PDF
    Digital supply chains (DSCs) are collaborative digital systems designed to quickly and efficiently move information, products, and services through global supply chains. The physical flow of products in traditional supply chains is replaced by the digital flow of information in DSCs. This digitalization has changed the conventional supplier selection processes. We propose an integrated and comprehensive fuzzy multicriteria model for supplier selection in DSCs. The proposed model integrates the fuzzy best-worst method (BWM) with the fuzzy multi-objective optimization based on ratio analysis plus full multiplicative form (MULTIMOORA), fuzzy complex proportional assessment of alternatives (COPRAS), and fuzzy technique for order preference by similarity to ideal solution (TOPSIS). The fuzzy BWM approach is used to measure the importance weights of the digital criteria. The fuzzy MULTIMOORA, fuzzy COPRAS, and fuzzy TOPSIS methods are used as prioritization methods to rank the suppliers. The maximize agreement heuristic (MAH) is used to aggregate the supplier rankings obtained from the prioritization methods into a consensus ranking. We present a real-world case study in a manufacturing company to demonstrate the applicability of the proposed method

    Is credit rating reserved territory for credit rating agencies? A MULTIMOORA approach for European firms and countries

    Get PDF
    Credit Rating Agencies rate firms and countries by internal experts but with a final qualitative judgment by their management acting as decision makers. These ratings on their turn influence the countries credit rating and ipso facto of their enterprises. The work of the CRA is in fact double: credit rating of firms and other organizations at one side and countries on the other. Considering the credit rating of firms, the CRA made significant mistakes during the Recession 2007−2009 and their judgment is too much American oriented, in any way from a European point of view. Consequently, in Europe many efforts were made to come to a new agency, but all efforts failed. It could be different for the rating of countries. Is a more scientific approach, eventually on a quantitative and structural basis, not possible? Therefore, MULTIMOORA, a quantitative method, is suggested. The study was made for all countries of the European Continent. Based on data available in 2013 and on their extrapolation, the results are quite comparable to the results of Standard & Poor’s Credit Rating System of the moment. As the classifications of Moody’s and Fitch are very similar to those of Standard & Poor’s the outcome would be similar for these other Credit Rating Agencies

    Dynamics under Uncertainty: Modeling Simulation and Complexity

    Get PDF
    The dynamics of systems have proven to be very powerful tools in understanding the behavior of different natural phenomena throughout the last two centuries. However, the attributes of natural systems are observed to deviate from their classical states due to the effect of different types of uncertainties. Actually, randomness and impreciseness are the two major sources of uncertainties in natural systems. Randomness is modeled by different stochastic processes and impreciseness could be modeled by fuzzy sets, rough sets, Dempster–Shafer theory, etc

    MCDM model for critical selection of building and insulation materials for optimising energy usage and environmental effect in production focus

    Get PDF
    In the context of sustainable buildings, an ecological study of building and insulating materials is critical since it may assist affirm or shift the path of new technology development. Utilising sustainable material is a part of the sustainable improvement. For this reason, material fabrication is the primary process for the energy usage and release of intense environmental gaseous. The fabrication of the insulation and building materials, as in every fabrication process, comprises an energy consumption of crude materials in addition to the pollutants’ release. In buildings, insulation is a relevant technological resolution for cutting energy usage. This study aims to assess the primary energy consumption and the environmental effects of the fabrication of building and thermal isolation materials by using a new hybrid MCDM model. The proposed new hybrid MCDM model includes Fuzzy FUCOM, CCSD and CRADIS methods. While the subjective weights of the criteria were determined with the fuzzy FUCOM method, the objective weights of the criteria were determined with the CCSD method. Construction materials were listed with the CRADIS method. According to the fuzzy FUCOM method, the most important criterion was determined as the CR3 criterion, while the most important criterion according to the CCSD method was determined as the CR1 criterion. According to the combined weights, the most important criterion was determined as the CR3 criterion. According to the CRADIS method, the material with the best performance was determined as Cement Plaster. The methodology used in this study is a novel approach therefore it has not been used in any study before. In addition, since the CRADIS method is a newly developed MCDM method, the number of articles related to this method is low. Therefore, this research gap will be filled with this study

    TOPSIS and Modified TOPSIS: A comparative analysis

    Full text link
    Selection of an appropriate Multiple Attribute Decision Making (MADM) method for providing a solution to a
 given MADM problem is always challenging endeavour. The challenge is even greater for situations where for a specific MADM problem there exist multiple MADM methods with similar degree of suitability. The Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) and its dominant variant the Modified TOPSIS methods are two very similar methods applicable to the same type of MADM problems. This study provides extensive simulation-based comparisons and mathematical analysis of these two popular methods in order to clarify the confusion regarding their selection for solving MADM problems

    Identifying and prioritizing cost reduction solutions in the supply chain by integrating value engineering and gray multi-criteria decision-making

    Get PDF
    Value engineering is an appropriate policy for creating and improving value, which reduces unnecessary costs and maintains core functionality. Despite the mentioned benefits, this approach has so far received little attention in the area of supply chain management. Although this approach is highly structured, limitations such as overemphasizing the cost criterion and failure to meet other criteria, utilizing team members’ votes to rank solutions, ignoring inherent uncertainty and ultimately disagreement between value engineering team members have reduced the effectiveness of this approach. The present study aims to provide a coherent framework for utilizing a value engineering approach to supply chain cost management and overcome the aforementioned limitations by utilizing gray multi-criteria decision-making. In this regard, in the first phase, the initial list of improvement solutions is determined, the criteria extracted from the literature are localized using value engineering team members’ opinion. These criteria are weighted using the gray stepwise weight assessment ratio analysis (SWARA-Gray) method. Then, the score of each solution is calculated by the value engineering team based on the list of criteria as a gray number. The scores are aggregated using the gray evaluation based on distance from average solution (EDAS-Gray) method, and the solutions are prioritized. Finally, the application of the proposed framework is investigated in a real case study in a power plant in Iran. The results of the research show that the final rankings of the solutions rarely changed for different methods; so the model used in this study has acceptable stability. First published online 24 September 202

    The Modelling of Roof Installation Projects Using Decision Trees and the AHP Method

    Get PDF
    In this work, the process of roofing projects’ execution is considered. The proper analysis of this process is important to optimise the behaviour of a project’s participants and to perform risk evaluation. The main result of this work is methodology, which can be used to optimise a project owner’s decisions and potentially can be applied for risk control or integrated into expert systems. This methodology includes the application of a decision tree and AHP (analytic hierarchy process) method to perform the modelling for roof installation project selection. In the proposed approach, a decision tree describes the process with nodes representing the states of a project. The tree includes the decision on whether to sell the project results or not, which requires the estimation of the subjective opinion of the project owner. These subjective values are used in the decision tree leaves. We propose to perform this estimation with the AHP method and describe how to do it in this paper. A particular example was considered. The proposed methodology was applied to that case, and all details of the process and results are provided. Using the proposed methodology, the adapted version of a specific, current situation model of project participants’ behaviours can be formed, allowing one to make the most efficient decisions in the light of the existing constraints. The application of results can increase the investor protection and contribute to the general sustainability of investments.This article belongs to the Special Issue Sustainable Construction Engineering and Managemen

    Multiple-Criteria Decision Making

    Get PDF
    Decision-making on real-world problems, including individual process decisions, requires an appropriate and reliable decision support system. Fuzzy set theory, rough set theory, and neutrosophic set theory, which are MCDM techniques, are useful for modeling complex decision-making problems with imprecise, ambiguous, or vague data.This Special Issue, “Multiple Criteria Decision Making”, aims to incorporate recent developments in the area of the multi-criteria decision-making field. Topics include, but are not limited to:- MCDM optimization in engineering;- Environmental sustainability in engineering processes;- Multi-criteria production and logistics process planning;- New trends in multi-criteria evaluation of sustainable processes;- Multi-criteria decision making in strategic management based on sustainable criteria
    corecore