255 research outputs found

    A survey of scheduling problems with setup times or costs

    Get PDF
    Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    ADAPTIVE SCHEDULING FOR OPERATING ROOM MANAGEMENT

    Get PDF
    The perioperative process in hospitals can be modelled as a 3-stage no-wait flow shop. The utilization of OR units and the average waiting time of patients are related to makespan and total completion time, respectively. However, minimizations of makespan and total completion time are NP-hard and NP-complete. Consequently, achieving good effectiveness and efficiency is a challenge in no-wait flow shop scheduling. The average idle time (AIT) and current and future idle time (CFI) heuristics are proposed to minimize makespan and total completion time, respectively. To improve effectiveness, current idle times and future idle times are taken into consideration and the insertion and neighborhood exchanging techniques are used. To improve efficiency, an objective increment method is introduced and the number of iterations is determined to reduce the computation times. Compared with three best-known heuristics for each objective, AIT and CFI heuristics can achieve greater effectiveness in the same computational complexity based on a variety of benchmarks. Furthermore, AIT and CFI heuristics perform better on trade-off balancing compared with other two best-known heuristics. Moreover, using the CFI heuristic for operating room (OR) scheduling, the average patient flow times are decreased by 11.2% over historical ones at University of Kentucky Health Care

    Solving no-wait two-stage flexible flow shop scheduling problem with unrelated parallel machines and rework time by the adjusted discrete Multi Objective Invasive Weed Optimization and fuzzy dominance approach

    Get PDF
    Purpose: Adjusted discrete Multi-Objective Invasive Weed Optimization (DMOIWO) algorithm, which uses fuzzy dominant approach for ordering, has been proposed to solve No-wait two-stage flexible flow shop scheduling problem. Design/methodology/approach: No-wait two-stage flexible flow shop scheduling problem by considering sequence-dependent setup times and probable rework in both stations, different ready times for all jobs and rework times for both stations as well as unrelated parallel machines with regards to the simultaneous minimization of maximum job completion time and average latency functions have been investigated in a multi-objective manner. In this study, the parameter setting has been carried out using Taguchi Method based on the quality indicator for beater performance of the algorithm. Findings: The results of this algorithm have been compared with those of conventional, multi-objective algorithms to show the better performance of the proposed algorithm. The results clearly indicated the greater performance of the proposed algorithm. Originality/value: This study provides an efficient method for solving multi objective no-wait two-stage flexible flow shop scheduling problem by considering sequence-dependent setup times, probable rework in both stations, different ready times for all jobs, rework times for both stations and unrelated parallel machines which are the real constraints.Peer Reviewe

    Comparative Analysis of Metaheuristic Approaches for Makespan Minimization for No Wait Flow Shop Scheduling Problem

    Get PDF
    This paper provides comparative analysis of various metaheuristic approaches for m-machine no wait flow shop scheduling (NWFSS) problem with makespan as an optimality criterion. NWFSS problem is NP hard and brute force method unable to find the solutions so approximate solutions are found with metaheuristic algorithms. The objective is to find out the scheduling sequence of jobs to minimize total completion time. In order to meet the objective criterion, existing metaheuristic techniques viz. Tabu Search (TS), Genetic Algorithm (GA) and Particle Swarm Optimization (PSO) are implemented for small and large sized problems and effectiveness of these techniques are measured with statistical metric

    Deterministic Assembly Scheduling Problems: A Review and Classification of Concurrent-Type Scheduling Models and Solution Procedures

    Get PDF
    Many activities in industry and services require the scheduling of tasks that can be concurrently executed, the most clear example being perhaps the assembly of products carried out in manufacturing. Although numerous scientific contributions have been produced on this area over the last decades, the wide extension of the problems covered and the lack of a unified approach have lead to a situation where the state of the art in the field is unclear, which in turn hinders new research and makes translating the scientific knowledge into practice difficult. In this paper we propose a unified notation for assembly scheduling models that encompass all concurrent-type scheduling problems. Using this notation, the existing contributions are reviewed and classified into a single framework, so a comprehensive, unified picture of the field is obtained. In addition, a number of conclusions regarding the state of the art in the topic are presented, as well as some opportunities for future research.Ministerio de Ciencia e Innovación español DPI2016-80750-

    Adaptive Production Scheduling and Control in One-Of-A-Kind Production

    Get PDF

    Benchmarking Permutation Flow Shop Problem: Adaptive and Enumerative Approaches Implementations via Novel Threading Techniques

    Full text link
    A large number of real-world planning problems are combinatorial optimization problems which are easy to state and have a finite but usually very large number of feasible solutions. The minimum spanning tree problem and the shortest path problem are some which are solvable through polynomial algorithms. Even though there are other problems such as crew scheduling, vehicle routing, production planning, and hotel room operations which have no properties such as to solve the problem with polynomial algorithms. All these problems are NP-hard. The permutation flow shop problem is also NP-hard problem and they require high computation. These problems are solvable as in the form of the optimal and near-optimal solution. Some approach to get optimal are exhaustive search and branch and bound whereas near optimal are achieved annealing, Genetic algorithm, and other various methods. We here have used different approach exhaustive search, branch and bound and genetic algorithm. We optimize these algorithms to get performance in time as well as get the result closer to optimal. The exhaustive search and branch and bound gives all possible optimal solutions. We here have shown the comparative result of optimal calculation for 10 jobs with varying machine number up to 20. The genetic algorithm scales up and gives results to the instances with a larger number of jobs and machines

    Multicriteria hybrid flow shop scheduling problem: literature review, analysis, and future research

    Get PDF
    This research focuses on the Hybrid Flow Shop production scheduling problem, which is one of the most difficult problems to solve. The literature points to several studies that focus the Hybrid Flow Shop scheduling problem with monocriteria functions. Despite of the fact that, many real world problems involve several objective functions, they can often compete and conflict, leading researchers to concentrate direct their efforts on the development of methods that take consider this variant into consideration. The goal of the study is to review and analyze the methods in order to solve the Hybrid Flow Shop production scheduling problem with multicriteria functions in the literature. The analyses were performed using several papers that have been published over the years, also the parallel machines types, the approach used to develop solution methods, the type of method develop, the objective function, the performance criterion adopted, and the additional constraints considered. The results of the reviewing and analysis of 46 papers showed opportunities for future researchon this topic, including the following: (i) use uniform and dedicated parallel machines, (ii) use exact and metaheuristics approaches, (iv) develop lower and uppers bounds, relations of dominance and different search strategiesto improve the computational time of the exact methods,  (v) develop  other types of metaheuristic, (vi) work with anticipatory setups, and (vii) add constraints faced by the production systems itself

    A simulation-based approach for solving the flowshop problem

    Get PDF
    A simulation-based algorithm for the Permutation Flowshop Sequencing Problem (PFSP) is presented. The algorithm uses Monte Carlo Simulation and a discrete version of the triangular distribution to incorporate a randomness criterion in the classical Nawaz, Enscore, and Ham (NEH) heuristic and starts an iterative process in order to obtain a set of alternative solutions to the PFSP. Thus, a random but biased lo We can then consider several properties per solution other than the makespan, such as balanced idle times among machines, number of completed jobs at a given target time, etc. This allows the decision-maker to consider multiple solution characteristics apart from those defined by the aprioristic objective function. Therefore, our methodology provides flexibility during the sequence selection process, which may help to improve the scheduling process. Several tests have been performed to discuss the effectiveness of this approach. The results obtained so far are promising enough to encourage further developments and improvements on the algorithm and its applications in real-life scenarios. In particular, Multi-Agent Simulation is proposed as a promising technique to be explored in future works.Postprint (published version