4,224 research outputs found

    A coordinated approach for supply-chain tracking in the liquefied natural gas industry

    Get PDF
    With the increased size and complexity of liquefied natural gas (LNG) projects, supplychain management has become a challenging process due to involvements of the remote location of the project site and the multiple stakeholders. The transparency and traceability of the supply-chain are critical as any surpluses or shortages of materials will put the project at risk. Currently, limited research has been conducted on LNG projects considering the total supply-chain perspective, which refers to all stages of materials tracking in off-site manufacturing, transportation, and site logistics. The purpose of this research is to propose a framework of a coordinated approach for supply-chain tracking in the LNG industry. Two focus group studies were organized to develop the proposed framework: One for LNG construction supply chain process development, and another for alternative tracking technologies selection. In addition, two experiments, namely off-site fabrication tracking and site logistics tracking, were conducted in a field to evaluate the feasibility of the proposed framework. Technology limitations were also discussed in terms of field implementation

    An Integration of Project Management Body of Knowledge and Project Management Information System to Improve On-time Deliverable of Liquefied Natural Gas Station Construction Projects

    Get PDF
    The objective of this study is to improve the liquefied natural gas station construction project to achieve on-time delivery. Diverse tools and techniques are integrated to make various interrelated activities in the project occur effectively as planned with less cost, suggested by the Project Management Body of Knowledge (PMBOK) guideline and the Project Management Information System (PMIS). To implement the PMIS along with the PMBOK, the project management software and Internet of Things (IoT) are utilized for real-time long-distance monitoring and control of the project. The proposed approach is implemented at a real demonstration project. The results reveal that the proposed approach is quite effective, which help increase the number of projects completed on schedule from 75% in the last year to 100% this year. Moreover, the implementation of the PMIS also results in substantial reductions in the employment allowance for routine site inspections and the travel expense for round-trip vehicles travelling from the company to the site

    Streamlining Digital Modeling and Building Information Modelling (BIM) Uses for the Oil and Gas Projects

    Get PDF
    The oil and gas industry is a technology-driven industry. Over the last two decades, it has heavily made use of digital modeling and associated technologies (DMAT) to enhance its commercial capability. Meanwhile, the Building Information Modelling (BIM) has grown at an exponential rate in the built environment sector. It is not only a digital representation of physical and functional characteristics of a facility, but it has also made an impact on the management processes of building project lifecycle. It is apparent that there are many similarities between BIM and DMAT usability in the aspect of physical modeling and functionality. The aim of this study is to streamline the usage of both DMAT and BIM whilst discovering valuable practices for performance improvement in the oil and gas projects. To achieve this, 28 BIM guidelines, 83 DMAT academic publications and 101 DMAT vendor case studies were selected for review. The findings uncover (a) 38 BIM uses; (b) 32 DMAT uses and; (c) 36 both DMAT and BIM uses. The synergy between DMAT and BIM uses would render insightful references into managing efficient oil and gas’s projects. It also helps project stakeholders to recognise future investment or potential development areas of BIM and DMAT uses in their projects

    Potential Terrorist Uses of Highway-Borne Hazardous Materials, MTI Report 09-03

    Get PDF
    The Department of Homeland Security (DHS) has requested that the Mineta Transportation Institutes National Transportation Security Center of Excellence (MTI NTSCOE) provide any research it has or insights it can provide on the security risks created by the highway transportation of hazardous materials. This request was submitted to MTI/NSTC as a National Transportation Security Center of Excellence. In response, MTI/NTSC reviewed and revised research performed in 2007 and 2008 and assembled a small team of terrorism and emergency-response experts, led by Center Director Brian Michael Jenkins, to report on the risks of terrorists using highway shipments of flammable liquids (e.g., gasoline tankers) to cause casualties anywhere, and ways to reduce those risks. This report has been provided to DHS. The teams first focus was on surface transportation targets, including highway infrastructure, and also public transportation stations. As a full understanding of these materials, and their use against various targets became revealed, the team shifted with urgency to the far more plentiful targets outside of surface transportation where people gather and can be killed or injured. However, the team is concerned to return to the top of the use of these materials against public transit stations and recommends it as a separate subject for urgent research

    Total Constraint Management for Improving Construction Work Flow in Liquefied Natural Gas Industry

    Get PDF
    Australia has benefited and will continue to benefit significantly from Liquefied Natural Gas (LNG) investments underway. Managing these LNG projects is challenging as they become increasingly complex and technologically demanding. The primary goal of this thesis is to develop a Total Constraint Management (TCM) method to improve construction work flow during LNG construction. Five controlled experiments were conducted and results show that successful implementation of TCM can significantly improve construction productivity and reduce schedule overruns

    Pacific Economic Monitor: Budget Analysis

    Get PDF
    The Monitor provides an update of developments in Pacific economies and explores topical policy issues

    Human Rights Due Diligence (HRDD) and Human Rights Impact Assessment (HRIA) Best Practices to Corporate Shared Value (CSV): a Case of British Petroleum Tangguh Project in Papua

    Full text link
    The Tangguh Liquefied Natural Gas (LNG) Project is a planned natural gas development project located in the remote area of Berau-Bintuni Bay in Papua Province, Indonesia. British Petroleum (BP) Tangguh project aims tobe the pioneer in producing natural gas. It can be concluded that BP contributes an innovative approach, bearing in mind to sustainable development, cultural preservation and biodiversity conservation. Therefore, in each of its corporate actions, BP always integrates the value of community, partnership, consultation and corporate responsibility. It is mentioned that through experience and observation, BP as an extractive company, haveestimated the costs of not finding a better mechanism to adjust to social challenges can be higher than the costs of the uncertainties inherent in the trial of new ideas. However, according to International Non-GovernmentalOrganization (NGO), Down to Earth, BP has conducted a series of human rights violations by exploiting natural resources in Papua and restricting Papuans in enjoying their fundamental human rights. If only the BP keeps this Tangguh project in line with its aim to accommodate concerns from the affected surroundings, thus, will surely bring positive changes in BP's corporate shared value

    Human Rights Due Diligence (HRDD) and Human Rights Impact Assessment (HRIA) Best Practices to Corporate Shared Value (CSV): a Case of British Petroleum Tangguh Project in Papua

    Full text link
    The Tangguh Liquefied Natural Gas (LNG) Project is a planned natural gas development project located in the remote area of Berau-Bintuni Bay in Papua Province, Indonesia. British Petroleum (BP) Tangguh project aims tobe the pioneer in producing natural gas. It can be concluded that BP contributes an innovative approach, bearing in mind to sustainable development, cultural preservation and biodiversity conservation. Therefore, in each of its corporate actions, BP always integrates the value of community, partnership, consultation and corporate responsibility. It is mentioned that through experience and observation, BP as an extractive company, haveestimated the costs of not finding a better mechanism to adjust to social challenges can be higher than the costs of the uncertainties inherent in the trial of new ideas. However, according to International Non-GovernmentalOrganization (NGO), Down to Earth, BP has conducted a series of human rights violations by exploiting natural resources in Papua and restricting Papuans in enjoying their fundamental human rights. If only the BP keeps this Tangguh project in line with its aim to accommodate concerns from the affected surroundings, thus, will surely bring positive changes in BP\u27s corporate shared value
    corecore