70 research outputs found
Lot Streaming in Different Types of Production Processes: A PRISMA Systematic Review
At present, any industry that wanted to be considered a vanguard must be willing to improve itself, developing innovative techniques to generate a competitive advantage against its direct competitors. Hence, many methods are employed to optimize production processes, such as Lot Streaming, which consists of partitioning the productive lots into overlapping small batches to reduce the overall operating times known as Makespan, reducing the delivery time to the final customer. This work proposes carrying out a systematic review following the PRISMA methodology to the existing literature in indexed databases that demonstrates the application of Lot Streaming in the different production systems, giving the scientific community a strong consultation tool, useful to validate the different important elements in the definition of the Makespan reduction objectives and their applicability in the industry. Two hundred papers were identified on the subject of this study. After applying a group of eligibility criteria, 63 articles were analyzed, concluding that Lot Streaming can be applied in different types of industrial processes, always keeping the main objective of reducing Makespan, becoming an excellent improvement tool, thanks to the use of different optimization algorithms, attached to the reality of each industry.This work was supported by the Universidad Tecnica de Ambato (UTA) and their Research and Development Department (DIDE) under project CONIN-P-256-2019, and SENESCYT by grants “Convocatoria Abierta 2011” and “Convocatoria Abierta 2013”
An estimation of distribution algorithm for combinatorial optimization problems
This paper considers solving more than one combinatorial problem considered some of the most difficult to solve in the combinatorial optimization field, such as the job shop scheduling problem (JSSP), the vehicle routing problem with time windows (VRPTW), and the quay crane scheduling problem (QCSP). A hybrid metaheuristic algorithm that integrates the Mallows model and the Moth-flame algorithm solves these problems. Through an exponential function, the Mallows model emulates the solution space distribution for the problems; meanwhile, the Moth-flame algorithm is in charge of determining how to produce the offspring by a geometric function that helps identify the new solutions. The proposed metaheuristic, called HEDAMMF (Hybrid Estimation of Distribution Algorithm with Mallows model and Moth-Flame algorithm), improves the performance of recent algorithms. Although knowing the algebra of permutations is required to understand the proposed metaheuristic, utilizing the HEDAMMF is justified because certain problems are fixed differently under different circumstances. These problems do not share the same objective function (fitness) and/or the same constraints. Therefore, it is not possible to use a single model problem. The aforementioned approach is able to outperform recent algorithms under different metrics for these three combinatorial problems. Finally, it is possible to conclude that the hybrid metaheuristics have a better performance, or equal in effectiveness than recent algorithms
Swarm intelligence for scheduling: a review
Swarm Intelligence generally refers to a problem-solving ability that emerges from the
interaction of simple information-processing units. The concept of Swarm suggests multiplicity,
distribution, stochasticity, randomness, and messiness. The concept of Intelligence suggests that
problem-solving approach is successful considering learning, creativity, cognition capabilities. This paper
introduces some of the theoretical foundations, the biological motivation and fundamental aspects of
swarm intelligence based optimization techniques such Particle Swarm Optimization (PSO), Ant Colony
Optimization (ACO) and Artificial Bees Colony (ABC) algorithms for scheduling optimization
An Enhanced Discrete Artificial Bee Colony Algorithm to Minimize the Total Flow Time in Permutation Flow Shop Scheduling with Limited Buffers
This paper presents an enhanced discrete artificial bee colony algorithm for minimizing the total flow time in the flow shop scheduling problem with buffer capacity. First, the solution in the algorithm is represented as discrete job permutation to directly convert to active schedule. Then, we present a simple and effective scheme called best insertion for the employed bee and onlooker bee and introduce a combined local search exploring both insertion and swap neighborhood. To validate the performance of the presented algorithm, a computational campaign is carried out on the Taillard benchmark instances, and computations and comparisons show that the proposed algorithm is not only capable of solving the benchmark set better than the existing discrete differential evolution algorithm and iterated greedy algorithm, but also capable of performing better than two recently proposed discrete artificial bee colony algorithms
An Enhanced Discrete Artificial Bee Colony Algorithm to Minimize the Total Flow Time in Permutation Flow Shop Scheduling with Limited Buffers
This paper presents an enhanced discrete artificial bee colony algorithm for minimizing the total flow time in the flow shop scheduling problem with buffer capacity. First, the solution in the algorithm is represented as discrete job permutation to directly convert to active schedule. Then, we present a simple and effective scheme called best insertion for the employed bee and onlooker bee and introduce a combined local search exploring both insertion and swap neighborhood. To validate the performance of the presented algorithm, a computational campaign is carried out on the Taillard benchmark instances, and computations and comparisons show that the proposed algorithm is not only capable of solving the benchmark set better than the existing discrete differential evolution algorithm and iterated greedy algorithm, but also capable of performing better than two recently proposed discrete artificial bee colony algorithms
Integrated Batching and Lot Streaming with Variable Sublots and Sequence-Dependent Setups in a Two-Stage Hybrid Flow Shop
Consider a paint manufacturing firm whose customers typically place orders for two or more products simultaneously: liquid primer, top coat paint, and/or undercoat paint. Each product belongs to an associated product family that can be batched together during the manufacturing process. Meanwhile, each product can be split into several sublots so that overlapping production is possible in a two-stage hybrid flow shop. Various numbers of identical capacitated machines operate in parallel at each stage. We present a mixed-integer programming (MIP) to analyze this novel integrated batching and lot streaming problem with variable sublots, incompatible job families, and sequence-dependent setup times. The model determines the number of sublots for each product, the size of each sublot, and the production sequencing for each sublot such that the sum of weighted completion time is minimized. Several numerical example problems are presented to validate the proposed formulation and to compare results with similar problems in the literature. Furthermore, an experimental design based on real industrial data is used to evaluate the performance of proposed model. Results indicate that the computational cost of solving the model is high
Rámec pro plánování problémy
Import 22/07/2015Scheduling problems form an important subclass of combinatorial optimisation problems with many applications in manufacturing and logistics. Predominately these problems are NP-complete (decision based) and NP-hard (optimisation based), hence the main course of research in solving them concentrates on the design of efficient heuristic algorithms. Two main categories of these algorithms exist: deterministic algorithms and evolutionary metaheuristics. The deterministic algorithms comprise local improvement techniques, such as k-opt algorithm, which try to improve existing feasible solution, and constructive heuristics, such as NEH, which build a solution starting from scratch, adding one job at a time. Evolutionary metaheuristics have prospered in the past decades, owing to their efficiency and flexibility. Drawing inspiration from the theory of natural evolution or swarm behavioural patterns, the most popular of these algorithms in practice include for instance Genetic Algorithms, Differential Evolution, Particle Swarm Optimisation, amongst others.
However, even though these heuristics provide in most cases close to optimal solution at reasonable execution time, this time is still impractically long for many applications. Therefore much effort has been dedicated to accelerating these algorithms. Since the development of hardware turns away from increasing the clock speed towards the parallel processing units, owing to reaching the limits of technology due to the increased power consumption and heat dissipation, this effort goes into parallelisation of the existing algorithms, to enable exploitation of the computing power of multi-core or many-core platforms. This is the goal of the first part of the thesis, accelerating two of the deterministic algorithms, NEH and 2-opt, with interesting results.
Another approach has been taken in the second part, with the core premise of exploring the influence of stochasticity on the performance of an evolutionary algorithm, selecting the relatively recent and promising Discrete Artificial Bee Colony algorithm. The pseudo-random number generator has been replaced with the different types of dissipative chaos maps, with some of them improving the algorithm significantly.
It has been shown that the population based evolutionary algorithms often form complex networks, taken from the point of view of the information exchange between individual solutions during the course of population development. The final part of this thesis puts this observation into practice by embedding the complex network analysis based self-adaptive mechanism into the ABC algorithm, a continuous optimisation problems solving evolutionary algorithm, which is however the basis for the afore mentioned DABC algorithm, and proving the effectiveness for some of the developed versions, currently on the standard continuous optimisation test functions, with the possibility to extend this modification to the combinatorial optimisations problems in the future being discussed in the conclusion.Rozvrhovací problémy jsou důležitou podtřídou úloh kombinatorické optimalizace s řadou aplikací ve výrobě a logistice. Většina těchto problémů je NP-úplných (rozhodovací forma) a NP-těžkých (optimalizační forma), proto se výzkum zaměřuje na návrh efektivních heuristických algoritmů. Dvě hlavní kategorie těchto algoritmů jsou deterministické algoritmy a evoluční metaheuristiky. Deterministické algoritmy zahrnují techniky lokálního prohledávání, například algoritmus k-opt, jejichž cílem je zlepšení existujícího přípustného řešení problému, dále pak konstruktivní heuristiky, jejichž příkladem je algoritmus NEH, které hledané řešení vytvářejí inkrementálně, bez potřeby znalosti vstupního bodu v prohledávaném prostoru řešení. Evoluční metaheuristiky mají za sebou historii úspěšného vývoje v posledních desetiletích, zejména díky jejich efektivitě a flexibilitě. Jejich inspirací jsou poznatky převzaté z biologie, teorie evoluce a inteligence hejna. Mezi nejpopulárnějšími z těchto algoritmů jsou, mimo jiné, genetické algoritmy, diferenciální evoluce, rojení částic (Particle Swarm Optimisation).
Ačkoli tyto heuristiky nalézají ve většině případů řešení blížící se globálnímu optimu v přípustném výpočetním čase, pro řadu aplikací mohou být stále ještě nepřijatelně pomalé. Velké úsilí bylo věnováno zrychlení těchto algoritmů. Protože se vývoj hardware díky dosažení technologických limitů, vzhledem ke zvyšující se spotřebě energie a tepelnému vyzařování, obrací od zvyšování frekvence jednojádrového procesoru k vícejádrovým procesorům a paralelnímu zpracování, je tato snaha většinou orientovaná na paralelizaci existujících algoritmů, aby bylo umožněno využití výpočetní síly vícejádrových platforem (multi-core a many-core). Prvním cílem této práce je tudíž akcelerace dvou deterministických algoritmů, NEH a 2-opt, přičemž bylo dosaženo zajímavých výsledků.
Jiný přístup byl zvolen ve druhé části, s hlavní myšlenkou prozkoumání vlivu náhodnosti na výkon evolučního algoritmu. Za tímto účelem byl zvolen relativně nový a slibný algoritmus Discrete Artificial Bee Colony. Generátor pseudonáhodných čísel byl nahrazen několika různými chaotickými mapami, z nichž některé znatelně zlepšily výsledky algoritmu.
Bylo ukázáno, že evoluční algoritmy založené na populaci často formují komplexní sítě, vzato z pohledu výměny informací mezi jednotlivými řešeními v populaci během jejího vývoje. Závěrečná část práce aplikuje toto pozorování vložením samo přizpůsobivého mechanismu založeném na analýze komplexní sítě do algoritmu ABC, který je evolučním algoritmem pro spojitou optimalizaci a zároveň základem dříve zmíněného DABC algoritmu. Efektivita několika verzí algoritmu založeném na této myšlence je dokázána na standardní sadě testovacích funkcí pro spojitou optimalizaci. Možnost rozšíření této modifikace na kombinatorické optimalizační problémy je diskutována v závěru práce.460 - Katedra informatikyvýborn
Iterated search methods for earliness and tardiness minimization in hybrid flowshops with due windows
[EN] In practice due dates usually behave more like intervals rather than specific points in time. This paper studies hybrid flowshops where jobs, if completed inside a due window, are considered on time. The objective is therefore the minimization of the weighted earliness and tardiness from the due window. This objective has seldom been studied and there are almost no previous works for hybrid flowshops. We present methods based on the simple concepts of iterated greedy and iterated local search. We introduce some novel operators and characteristics, like an optimal idle time insertion procedure and a two stage local search where, in the second stage, a limited local search on a exact representation is carried out. We also present a comprehensive computational campaign, including the reimplementation and comparison of 9 competing procedures. A thorough evaluation of all methods with more than 3000 instances shows that our presented approaches yield superior results which are also demonstrated to be statistically significant. Experiments also show the contribution of the new operators in the presented methods. (C) 2016 Elsevier Ltd. All rights reserved.The authors would like to thank Professors Lofti Hidri and Mohamed Haouari for sharing with us the source codes and explanations of the lower bounds. Quan-Ke Pan is supported by the National Natural Science Foundation of China (Grant No. 51575212), Program for New Century Excellent Talents in University (Grant No. NCET-13-0106), Science Foundation of Hubei Province in China (Grant No. 2015CFB560), Specialized Research Fund for the Doctoral Program of Higher Education (Grant No. 20130042110035), Key Laboratory Basic Research Foundation of Education Department of Liaoning Province (LZ2014014), Open Research Fund Program of the State Key Laboratory of Digital Manufacturing Equipment and Technology, Huazhong University of Science and Technology, China. Ruben Ruiz and Pedro Alfaro-Fernandez are supported by the Spanish Ministry of Economy and Competitiveness, under the project "SCHEYARD Optimization of Scheduling Problems in Container Yards" (No. DPI2015-65895-R) financed by FEDER funds.Pan, Q.; Ruiz García, R.; Alfaro-Fernandez, P. (2017). Iterated search methods for earliness and tardiness minimization in hybrid flowshops with due windows. Computers & Operations Research. 80:50-60. https://doi.org/10.1016/j.cor.2016.11.022S50608
Modeling and Solving Flow Shop Scheduling Problem Considering Worker Resource
In this paper, an uninterrupted hybrid flow scheduling problem is modeled under uncertainty conditions. Due to the uncertainty of processing time in workshops, fuzzy programming method has been used to control the parameters of processing time and preparation time. In the proposed model, there are several jobs that must be processed by machines and workers, respectively. The main purpose of the proposed model is to determine the correct sequence of operations and assign operations to each machine and each worker at each stage, so that the total completion time (Cmax) is minimized. Also this paper, fuzzy programming method is used for control unspecified parameter has been used from GAMS software to solve sample problems. The results of problem solving in small and medium dimensions show that with increasing uncertainty, the amount of processing time and consequently the completion time increases. Increases from the whole work. On the other hand, with the increase in the number of machines and workers in each stage due to the high efficiency of the machines, the completion time of all works has decreased. Innovations in this paper include uninterrupted hybrid flow storage scheduling with respect to fuzzy processing time and preparation time in addition to payment time. The allocation of workers and machines to jobs is another innovation of this article
- …