71,917 research outputs found

    SIMDAT

    No full text

    Building information modelling (BIM) implementation and remote construction projects: issues, challenges, and critiques.

    Get PDF
    The construction industry has been facing a paradigm shift to (i) increase productivity, efficiency, infrastructure value; quality and sustainability (ii) reduce lifecycle costs, lead times and duplications via effective collaboration and communication of stakeholders in construction projects. This paradigm shift is becoming more critical with remote construction projects, which reveals unique and even more complicated challenging problems in relation to communication and management due to the remoteness of the construction sites. On the other hand, Building Informational Modelling (BIM) is offered by some as the panacea to addressing the interdisciplinary inefficiencies in construction projects. Although in many cases the adoption of BIM has numerous potential benefits, it also raises interesting challenges with regards to how BIM integrates the business processes of individual practices. This paper aims to show how BIM adoption for an architectural company helps to mitigate the management and communication problems in remote construction project. The paper adopts a case study methodology, which is a UK Knowledge Transfer Partnership (KTP) project of BIM adoption between the University of Salford, UK and John McCall Architects (JMA), in which the BIM use between the architectural company and the main contractor for a remote construction project is elaborated and justified. Research showed that the key management and communication problems such as poor quality of construction works, unavailability of materials, and ineffective planning and scheduling can largely be mitigated by adopting BIM at the design stage

    Adaptive development and maintenance of user-centric software systems

    Get PDF
    A software system cannot be developed without considering the various facets of its environment. Stakeholders – including the users that play a central role – have their needs, expectations, and perceptions of a system. Organisational and technical aspects of the environment are constantly changing. The ability to adapt a software system and its requirements to its environment throughout its full lifecycle is of paramount importance in a constantly changing environment. The continuous involvement of users is as important as the constant evaluation of the system and the observation of evolving environments. We present a methodology for adaptive software systems development and maintenance. We draw upon a diverse range of accepted methods including participatory design, software architecture, and evolutionary design. Our focus is on user-centred software systems

    ArchOptions: A Real Options-Based Model for Predicting the Stability of Software Architectures

    Get PDF
    Architectural stability refers to the extent an architecture is flexible to endure evolutionary changes in stakeholders\' requirements and the environment. We assume that the primary goal of software architecture is to guide the system\'s evolution. We contribute to a novel model that exploits options theory to predict architectural stability. The model is predictive: it provides \"insights\" on the evolution of the software system based on valuing the extent an architecture can endure a set of likely evolutionary changes. The model builds on Black and Scholes financial options theory (Noble Prize wining) to value such extent. We show how we have derived the model: the analogy and assumptions made to reach the model, its formulation, and possible interpretations. We refer to this model as ArchOptions

    Development of a scale for factors causing delays in infrastructure projects in India

    Get PDF
    The objective of the paper is to develop a validated scale to measure the factors that cause delays in infrastructure projects. The study employed a standard three phase scale development procedure of Churchill (1979) which was augmented subsequently by Nunnally, Bernstein and Berge (1994) and Prakash and Phadtare (2018). In phase one, 73 factors that cause delays were identified, which were reduced to 45 based on literature review and expert opinions. These 45 factors were subjected to an exploratory factor analysis (EFA) and confirmatory factor analysis (CFA) in phase two and three, respectively, to refine and establish convergent, discriminant and nomological validity of the scale. The study confirms that delays in infrastructure projects happen due to six factors, i.e., Contractor Related Factors (CON); Consultant Related Factors (CS); External Factors (EX); Labour Related Factors (LR); Material Related Factors (MT) and Design Related Factors (DJ). The study is particularly useful for the firms engaged in the development of infrastructure projects globally, as it identifies and ranks the factors that cause delays in a project. However, the study being confirmatory in nature only confirms the grouping of factors causing delays and is also limited by the possibility of sampling error.&nbsp

    BIM adoption and implementation for architectural practices

    Get PDF
    Severe issues about data acquisition and management arise during the design creation and development due to complexity, uncertainty and ambiguity. BIM (Building Information Modelling) is a tool for a team based lean design approach towards improved architectural practice across the supply chain. However, moving from a CAD (Computer Aided Design) approach to BIM (Building Information Modelling) represents a fundamental change for individual disciplines and the construction industry as a whole. Although BIM has been implemented by large practices, it is not widely used by SMEs (Small and Medium Sized Enterprises). Purpose: This paper aims to present a systematic approach for BIM implementation for Architectural SMEs at the organizational level Design/Methodology/Approach: The research is undertaken through a KTP (Knowledge transfer Partnership) project between the University of Salford and John McCall Architects (JMA) a SME based in Liverpool. The overall aim of the KTP is to develop lean design practice through BIM adoption. The BIM implementation approach uses a socio-technical view which does not only consider the implementation of technology but also considers the socio-cultural environment that provides the context for its implementation. The action research oriented qualitative and quantitative research is used for discovery, comparison, and experimentation as it provides �learning by doing�. Findings: The strategic approach to BIM adoption incorporated people, process and technology equally and led to capacity building through the improvements in process, technological infrastructure and upskilling of JMA staff to attain efficiency gains and competitive advantages. Originality/Value: This paper introduces a systematic approach for BIM adoption based on the action research philosophy and demonstrates a roadmap for BIM adoption at the operational level for SME companie
    • …
    corecore