2,698 research outputs found
Recommended from our members
An Assessment of PIER Electric Grid Research 2003-2014 White Paper
This white paper describes the circumstances in California around the turn of the 21st century that led the California Energy Commission (CEC) to direct additional Public Interest Energy Research funds to address critical electric grid issues, especially those arising from integrating high penetrations of variable renewable generation with the electric grid. It contains an assessment of the beneficial science and technology advances of the resultant portfolio of electric grid research projects administered under the direction of the CEC by a competitively selected contractor, the University of California’s California Institute for Energy and the Environment, from 2003-2014
Time domain analysis of switching transient fields in high voltage substations
Switching operations of circuit breakers and disconnect switches generate transient currents propagating along the substation busbars. At the moment of switching, the busbars temporarily acts as antennae radiating transient electromagnetic fields within the substations. The radiated fields may interfere and disrupt normal operations of electronic equipment used within the substation for measurement, control and communication purposes. Hence there is the need to fully characterise the substation electromagnetic environment as early as the design stage of substation planning and operation to ensure safe operations of the electronic equipment. This paper deals with the computation of transient electromagnetic fields due to switching within a high voltage air-insulated substation (AIS) using the finite difference time domain (FDTD) metho
Monitoring and Fault Location Sensor Network for Underground Distribution Lines
One of the fundamental tasks of electric distribution utilities is guaranteeing a continuous
supply of electricity to their customers. The primary distribution network is a critical part of these
facilities because a fault in it could affect thousands of customers. However, the complexity of
this network has been increased with the irruption of distributed generation, typical in a Smart
Grid and which has significantly complicated some of the analyses, making it impossible to apply
traditional techniques. This problem is intensified in underground lines where access is limited. As a
possible solution, this paper proposes to make a deployment of a distributed sensor network along
the power lines. This network proposes taking advantage of its distributed character to support new
approaches of these analyses. In this sense, this paper describes the aquiculture of the proposed
network (adapted to the power grid) based on nodes that use power line communication and energy
harvesting techniques. In this sense, it also describes the implementation of a real prototype that
has been used in some experiments to validate this technological adaptation. Additionally, beyond
a simple use for monitoring, this paper also proposes the use of this approach to solve two typical
distribution system operator problems, such as: fault location and failure forecasting in power cables.Ministerio de Economía y Competitividad, Government of Spain project Sistema Inteligente Inalámbrico para Análisis y Monitorización de Líneas de Tensión Subterráneas en Smart Grids (SIIAM) TEC2013-40767-RMinisterio de Educación, Cultura y Deporte, Government of Spain, for the funding of the scholarship Formación de Profesorado Universitario 2016 (FPU 2016
A Dynamic Ampacity Model for the Testing of Advanced Conductors
Advanced Conductors are an intriguing new technology that promises to help the utility industry increase the transmission capacity available in the United States. Manufacturers of advanced conductors promise double the current carrying capacity of normal Aluminum Clad Steel Reinforced conductor through a combination of increased thermal limits and decreased thermal elongation.
This thesis will outline a control developed for the Power Line Conductor Accelerated Test Facility at Oak Ridge National Laboratory. This custom facility is designed for the testing and rapid aging of advanced overhead conductors as part of a U.S. Department of Energy initiative to assist the development and deployment of new transmission technologies. The control outlined will make use of an ampacity model capable of accurately describing the current – temperature relationship of bare overhead conductor at an outdoor facility. This model will be used to maintain test conductors at specific elevated temperatures for extended periods of time. It is hoped that these tests will verify the thermal limits of the advanced conductors and encourage utilities to begin deploying them in the field
Experimental study of visual corona under aeronautic pressure conditions using low-cost imaging sensors
Visual corona tests have been broadly applied for identifying the critical corona points of diverse high-voltage devices, although other approaches based on partial discharge or radio interference voltage measurements are also widely applied to detect corona activity. Nevertheless, these two techniques must be applied in screened laboratories, which are scarce and expensive, require sophisticated instrumentation, and typically do not allow location of the discharge points. This paper describes the detection of the visual corona and location of the critical corona points of a sphere-plane gap configurations under different pressure conditions ranging from 100 to 20 kPa, covering the pressures typically found in aeronautic environments. The corona detection is made with a low-cost CMOS imaging sensor from both the visible and ultraviolet (UV) spectrum, which allows detection of the discharge points and their locations, thus significantly reducing the complexity and costs of the instrumentation required while preserving the sensitivity and accuracy of the measurements. The approach proposed in this paper can be applied in aerospace applications to prevent the arc tracking phenomenon, which can lead to catastrophic consequences since there is not a clear protection solution, due to the low levels of leakage current involved in the pre-arc phenomenon.Peer ReviewedPostprint (published version
Engineering study for a mass memory system for advanced spacecrafts Final report, 1 Dec. 1969 - 1 Jul. 1970
Mass memory system for advanced spacecraf
- …