The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review
Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe
A simheuristic algorithm for solving an integrated resource allocation and scheduling problem
Modern companies have to face challenging configuration issues in their manufacturing chains. One of these challenges is related to the integrated allocation and scheduling of resources such as machines, workers, energy, etc. These integrated optimization problems are difficult to solve, but they can be even more challenging when real-life uncertainty is considered. In this paper, we study an integrated allocation and scheduling optimization problem with stochastic processing times. A simheuristic algorithm is proposed in order to effectively solve this integrated and stochastic problem. Our approach relies on the hybridization of simulation with a metaheuristic to deal with the stochastic version of the allocation-scheduling problem. A series of numerical experiments contribute to illustrate the efficiency of our methodology as well as their potential applications in real-life enterprise settings
Multi crteria decision making and its applications : a literature review
This paper presents current techniques used in Multi Criteria Decision Making (MCDM) and their applications. Two basic approaches for MCDM, namely Artificial Intelligence MCDM (AIMCDM) and Classical MCDM (CMCDM) are discussed and investigated. Recent articles from international journals related to MCDM are collected and analyzed to find which approach is more common than the other in MCDM. Also, which area these techniques are applied to. Those articles are appearing in journals for the year 2008 only. This paper provides evidence that currently, both AIMCDM and CMCDM are equally common in MCDM
Managing Uncertainty: A Case for Probabilistic Grid Scheduling
The Grid technology is evolving into a global, service-orientated
architecture, a universal platform for delivering future high demand
computational services. Strong adoption of the Grid and the utility computing
concept is leading to an increasing number of Grid installations running a wide
range of applications of different size and complexity. In this paper we
address the problem of elivering deadline/economy based scheduling in a
heterogeneous application environment using statistical properties of job
historical executions and its associated meta-data. This approach is motivated
by a study of six-month computational load generated by Grid applications in a
multi-purpose Grid cluster serving a community of twenty e-Science projects.
The observed job statistics, resource utilisation and user behaviour is
discussed in the context of management approaches and models most suitable for
supporting a probabilistic and autonomous scheduling architecture
An optimal-control based integrated model of supply chain
Problems of supply chain scheduling are challenged by high complexity, combination of continuous and discrete processes, integrated production and transportation operations as well as dynamics and resulting requirements for adaptability and stability analysis. A possibility to address the above-named issues opens modern control theory and optimal program control in particular. Based on a combination of fundamental results of modern optimal program control theory and operations research, an original approach to supply chain scheduling is developed in order to answer the challenges of complexity, dynamics, uncertainty, and adaptivity. Supply chain schedule generation is represented as an optimal program control problem in combination with mathematical programming and interpreted as a dynamic process of operations control within an adaptive framework. The calculation procedure is based on applying Pontryagin’s maximum principle and the resulting essential reduction of problem dimensionality that is under solution at each instant of time. With the developed model, important categories of supply chain analysis such as stability and adaptability can be taken into consideration. Besides, the dimensionality of operations research-based problems can be relieved with the help of distributing model elements between an operations research (static aspects) and a control (dynamic aspects) model. In addition, operations control and flow control models are integrated and applicable for both discrete and continuous processes.supply chain, model of supply chain scheduling, optimal program control theory, Pontryagin’s maximum principle, operations research model,
On green routing and scheduling problem
The vehicle routing and scheduling problem has been studied with much
interest within the last four decades. In this paper, some of the existing
literature dealing with routing and scheduling problems with environmental
issues is reviewed, and a description is provided of the problems that have
been investigated and how they are treated using combinatorial optimization
tools
Project management under uncertainty: a study on solution methods
Project Management involves onetime endeavors that demand for getting it right the first time. On the other hand, project scheduling, being one of the most modeled project management process stages, still faces a wide gap from theory to practice. Demanding computational models and their consequent call for simplification, divert the implementation of such models in project management tools from the actual day to day project management process. Special focus is being made to the robustness of the generated project schedules facing the omnipresence of uncertainty. An "easy" way out is to add, more or less cleverly calculated, time buffers that always result in project duration increase and correspondingly, in cost. A better approach to deal with uncertainty seems to be to explore slack that might be present in a given project schedule, a fortiori when a non-optimal schedule is used. The combination of such approach to recent advances in modeling resource allocation and scheduling techniques to cope with the increasing flexibility in resources, as can be expressed in "Flexible Resource Constraint Project Scheduling Problem" (FRCPSP) formulations, should be a promising line of research to generate more adequate project management tools. In reality, this approach has been frequently used, by project managers in an ad-hoc way
The safety case and the lessons learned for the reliability and maintainability case
This paper examine the safety case and the lessons learned for the reliability and maintainability case
- …