21,703 research outputs found

    Test exploration and validation using transaction level models

    Get PDF
    The complexity of the test infrastructure and test strategies in systems-on-chip approaches the complexity of the functional design space. This paper presents test design space exploration and validation of test strategies and schedules using transaction level models (TLMs). Since many aspects of testing involve the transfer of a significant amount of test stimuli and responses, the communication-centric view of TLMs suits this purpose exceptionally wel

    Task scheduling techniques for asymmetric multi-core systems

    Get PDF
    As performance and energy efficiency have become the main challenges for next-generation high-performance computing, asymmetric multi-core architectures can provide solutions to tackle these issues. Parallel programming models need to be able to suit the needs of such systems and keep on increasing the application’s portability and efficiency. This paper proposes two task scheduling approaches that target asymmetric systems. These dynamic scheduling policies reduce total execution time either by detecting the longest or the critical path of the dynamic task dependency graph of the application, or by finding the earliest executor of a task. They use dynamic scheduling and information discoverable during execution, fact that makes them implementable and functional without the need of off-line profiling. In our evaluation we compare these scheduling approaches with two existing state-of the art heterogeneous schedulers and we track their improvement over a FIFO baseline scheduler. We show that the heterogeneous schedulers improve the baseline by up to 1.45 in a real 8-core asymmetric system and up to 2.1 in a simulated 32-core asymmetric chip.This work has been supported by the Spanish Government (SEV2015-0493), by the Spanish Ministry of Science and Innovation (contract TIN2015-65316-P), by Generalitat de Catalunya (contracts 2014-SGR-1051 and 2014-SGR-1272), by the RoMoL ERC Advanced Grant (GA 321253) and the European HiPEAC Network of Excellence. The Mont-Blanc project receives funding from the EU’s Seventh Framework Programme (FP7/2007-2013) under grant agreement no 610402 and from the EU’s H2020 Framework Programme (H2020/2014-2020) under grant agreement no 671697. M. Moretó has been partially supported by the Ministry of Economy and Competitiveness under Juan de la Cierva postdoctoral fellowship number JCI-2012-15047. M. Casas is supported by the Secretary for Universities and Research of the Ministry of Economy and Knowledge of the Government of Catalonia and the Cofund programme of the Marie Curie Actions of the 7th R&D Framework Programme of the European Union (Contract 2013 BP B 00243).Peer ReviewedPostprint (author's final draft

    Feedback and time are essential for the optimal control of computing systems

    Get PDF
    The performance, reliability, cost, size and energy usage of computing systems can be improved by one or more orders of magnitude by the systematic use of modern control and optimization methods. Computing systems rely on the use of feedback algorithms to schedule tasks, data and resources, but the models that are used to design these algorithms are validated using open-loop metrics. By using closed-loop metrics instead, such as the gap metric developed in the control community, it should be possible to develop improved scheduling algorithms and computing systems that have not been over-engineered. Furthermore, scheduling problems are most naturally formulated as constraint satisfaction or mathematical optimization problems, but these are seldom implemented using state of the art numerical methods, nor do they explicitly take into account the fact that the scheduling problem itself takes time to solve. This paper makes the case that recent results in real-time model predictive control, where optimization problems are solved in order to control a process that evolves in time, are likely to form the basis of scheduling algorithms of the future. We therefore outline some of the research problems and opportunities that could arise by explicitly considering feedback and time when designing optimal scheduling algorithms for computing systems

    The Living Application: a Self-Organising System for Complex Grid Tasks

    Full text link
    We present the living application, a method to autonomously manage applications on the grid. During its execution on the grid, the living application makes choices on the resources to use in order to complete its tasks. These choices can be based on the internal state, or on autonomously acquired knowledge from external sensors. By giving limited user capabilities to a living application, the living application is able to port itself from one resource topology to another. The application performs these actions at run-time without depending on users or external workflow tools. We demonstrate this new concept in a special case of a living application: the living simulation. Today, many simulations require a wide range of numerical solvers and run most efficiently if specialized nodes are matched to the solvers. The idea of the living simulation is that it decides itself which grid machines to use based on the numerical solver currently in use. In this paper we apply the living simulation to modelling the collision between two galaxies in a test setup with two specialized computers. This simulation switces at run-time between a GPU-enabled computer in the Netherlands and a GRAPE-enabled machine that resides in the United States, using an oct-tree N-body code whenever it runs in the Netherlands and a direct N-body solver in the United States.Comment: 26 pages, 3 figures, accepted by IJHPC

    The building information modeling for the retrofitting of existing buildings. A case study in the University of Cagliari.

    Get PDF
    Italy's very consistent buildings stock has become the major field for real estate investments and for the related projects and actions. The urge of working on built environment is however facing some crucial issues. The first is the lack of documentation on the construction history and on the real constructive layout of existing buildings (in terms of components, installations, plants, etc.). The second is the poor activity in surveying their current status, with reference to use (energy behaviour, real consumptions, etc.) and maintenance (conservation status, previous maintenance works, compliance with current regulations, etc.). These obstacles cause a deep inefficiency in the planning, programming and controlling of requalification and/or refunctionalisation works. Starting from these assumptions, this paper shows the findings of a research shared by the Politecnico of Milan and the Department of Civil and Environmental Engineering and Architecture of the University of Cagliari. It is aimed at testing the use of building information modeling (BIM) to structure the necessary knowledge to evaluate intervention scenarios. The research is focused on the Mandolesi Pavilion of the University of Cagliari, designed by Enrico Mandolesi. It is a highly stimulating architectural object because it incorporates values that require a conservative approach, but at the same time, like most contemporary buildings, it was designed and built for innovation and not for “long duration”. The work has actually led to the realization of a BIM model of the case study. It represents the first prefiguration of an approach that develops from construction history and continues with advanced diagnostics on the statical and energy performances of the building. The model formalizes knowledge and information on a significant building, aimed at its management. It allows also the setting of intervention scenarios that can be evaluated with real-time simulations of cost, time and ROI
    corecore