10,321 research outputs found
A 3D immersive discrete event simulator for enabling prototyping of factory layouts
There is an increasing need to eliminate wasted time and money during factory layout design and subsequent construction. It is presently difficult for engineers to foresee if a certain layout is optimal for work and material flows. By exploiting modelling, simulation and visualisation techniques, this paper presents a tool concept called immersive WITNESS that combines the modelling strengths of Discrete Event Simulation (DES) with the 3D visualisation strengths of recent 3D low cost gaming technology to enable decision makers make informed design choices for future factories layouts. The tool enables engineers to receive immediate feedback on their design choices. Our results show that this tool has the potential to reduce rework as well as the associated costs of making physical prototypes
Multiobjective scheduling for semiconductor manufacturing plants
Scheduling of semiconductor wafer manufacturing system is identified as a complex problem, involving multiple and conflicting objectives (minimization of facility average utilization, minimization of waiting time and storage, for instance) to simultaneously satisfy. In this study, we propose an efficient approach based on an artificial neural network technique embedded into a multiobjective genetic algorithm for multi-decision scheduling problems in a semiconductor wafer fabrication environment
Discrete event simulation and virtual reality use in industry: new opportunities and future trends
This paper reviews the area of combined discrete
event simulation (DES) and virtual reality (VR) use within industry.
While establishing a state of the art for progress in this
area, this paper makes the case for VR DES as the vehicle of choice
for complex data analysis through interactive simulation models,
highlighting both its advantages and current limitations. This paper
reviews active research topics such as VR and DES real-time
integration, communication protocols, system design considerations,
model validation, and applications of VR and DES. While
summarizing future research directions for this technology combination,
the case is made for smart factory adoption of VR DES as
a new platform for scenario testing and decision making. It is put
that in order for VR DES to fully meet the visualization requirements
of both Industry 4.0 and Industrial Internet visions of digital
manufacturing, further research is required in the areas of lower
latency image processing, DES delivery as a service, gesture recognition
for VR DES interaction, and linkage of DES to real-time data streams and Big Data sets
Multiobjective strategies for New Product Development in the pharmaceutical industry
New Product Development (NPD) constitutes a challenging problem in the pharmaceutical industry, due to the characteristics of the development pipeline. Formally, the NPD problem can be stated as follows: select a set of R&D projects from a pool of candidate projects in order to satisfy several criteria (economic profitability, time to market) while coping with the uncertain nature of the projects. More precisely, the recurrent key issues are to determine the projects to develop once target molecules have been identified, their order and the level of resources to assign. In this context, the proposed approach combines discrete event stochastic simulation (Monte Carlo approach) with multiobjective genetic algorithms (NSGAII type, Non-Sorted Genetic Algorithm II) to optimize the highly combinatorial portfolio management problem. In that context, Genetic Algorithms (GAs) are particularly attractive for treating this kind of problem, due to their ability to directly lead to the so-called Pareto front and to account for the combinatorial aspect. This work is illustrated with a study case involving nine interdependent new product candidates targeting three diseases. An analysis is performed for this test bench on the different pairs of criteria both for the bi- and tricriteria optimization: large portfolios cause resource queues and delays time to launch and are eliminated by the bi- and tricriteria optimization strategy. The optimization strategy is thus interesting to detect the sequence candidates. Time is an important criterion to consider simultaneously with NPV and risk criteria. The order in which drugs are released in the pipeline is of great importance as with scheduling problems
Multiobjective strategies for New Product Development in the pharmaceutical industry
New Product Development (NPD) constitutes a challenging problem in the pharmaceutical industry, due to the characteristics of the development pipeline. Formally, the NPD problem can be stated as follows: select a set of R&D projects from a pool of candidate projects in order to satisfy several criteria (economic profitability, time to market) while coping with the uncertain nature of the projects. More precisely, the recurrent key issues are to determine the projects to develop once target molecules have been identified, their order and the level of resources to assign. In this context, the proposed approach combines discrete event stochastic simulation (Monte Carlo approach) with multiobjective genetic algorithms (NSGAII type, Non-Sorted Genetic Algorithm II) to optimize the highly combinatorial portfolio management problem. In that context, Genetic Algorithms (GAs) are particularly attractive for treating this kind of problem, due to their ability to directly lead to the so-called Pareto front and to account for the combinatorial aspect. This work is illustrated with a study case involving nine interdependent new product candidates targeting three diseases. An analysis is performed for this test bench on the different pairs of criteria both for the bi- and tricriteria optimization: large portfolios cause resource queues and delays time to launch and are eliminated by the bi- and tricriteria optimization strategy. The optimization strategy is thus interesting to detect the sequence candidates. Time is an important criterion to consider simultaneously with NPV and risk criteria. The order in which drugs are released in the pipeline is of great importance as with scheduling problems
A State-of-the-art Integrated Transportation Simulation Platform
Nowadays, universities and companies have a huge need for simulation and
modelling methodologies. In the particular case of traffic and transportation,
making physical modifications to the real traffic networks could be highly
expensive, dependent on political decisions and could be highly disruptive to
the environment. However, while studying a specific domain or problem,
analysing a problem through simulation may not be trivial and may need several
simulation tools, hence raising interoperability issues. To overcome these
problems, we propose an agent-directed transportation simulation platform,
through the cloud, by means of services. We intend to use the IEEE standard HLA
(High Level Architecture) for simulators interoperability and agents for
controlling and coordination. Our motivations are to allow multiresolution
analysis of complex domains, to allow experts to collaborate on the analysis of
a common problem and to allow co-simulation and synergy of different
application domains. This paper will start by presenting some preliminary
background concepts to help better understand the scope of this work. After
that, the results of a literature review is shown. Finally, the general
architecture of a transportation simulation platform is proposed
Mutual benefits of two multicriteria analysis methodologies: A case study for batch plant design
This paper presents a MultiObjective Genetic Algorithm (MOGA) optimization framework for batch plant design. For this purpose, two approaches are implemented and compared with respect to three criteria, i.e., investment cost, equipment number and a flexibility indicator based on work in process (the so-called WIP) computed by use of a discrete-event simulation model. The first approach involves a genetic algorithm in order to generate acceptable solutions, from which the best ones are chosen by using a Pareto Sort algorithm. The second approach combines the previous Genetic Algorithm with a multicriteria analysis methodology, i.e., the Electre method in order to find the best solutions. The performances of the two procedures are studied for a large-size problem and a comparison between the procedures is then made
Panel on future challenges in modeling methodology
This panel paper presents the views of six researchers and practitioners of simulation modeling. Collectively we attempt to address a range of key future challenges to modeling methodology. It is hoped that the views of this paper, and the presentations made by the panelists at the 2004 Winter Simulation Conference will raise awareness and stimulate further discussion on the future of modeling methodology in areas such as modeling problems in business applications, human factors and geographically dispersed networks; rapid model development and maintenance; legacy modeling approaches; markup languages; virtual interactive process design and simulation; standards; and Grid computing
- …