157 research outputs found
A note on the data-driven capacity of P2P networks
We consider two capacity problems in P2P networks. In the first one, the
nodes have an infinite amount of data to send and the goal is to optimally
allocate their uplink bandwidths such that the demands of every peer in terms
of receiving data rate are met. We solve this problem through a mapping from a
node-weighted graph featuring two labels per node to a max flow problem on an
edge-weighted bipartite graph. In the second problem under consideration, the
resource allocation is driven by the availability of the data resource that the
peers are interested in sharing. That is a node cannot allocate its uplink
resources unless it has data to transmit first. The problem of uplink bandwidth
allocation is then equivalent to constructing a set of directed trees in the
overlay such that the number of nodes receiving the data is maximized while the
uplink capacities of the peers are not exceeded. We show that the problem is
NP-complete, and provide a linear programming decomposition decoupling it into
a master problem and multiple slave subproblems that can be resolved in
polynomial time. We also design a heuristic algorithm in order to compute a
suboptimal solution in a reasonable time. This algorithm requires only a local
knowledge from nodes, so it should support distributed implementations.
We analyze both problems through a series of simulation experiments featuring
different network sizes and network densities. On large networks, we compare
our heuristic and its variants with a genetic algorithm and show that our
heuristic computes the better resource allocation. On smaller networks, we
contrast these performances to that of the exact algorithm and show that
resource allocation fulfilling a large part of the peer can be found, even for
hard configuration where no resources are in excess.Comment: 10 pages, technical report assisting a submissio
An oil pipeline design problem
Copyright @ 2003 INFORMSWe consider a given set of offshore platforms and onshore wells producing known (or estimated) amounts of oil to be connected to a port. Connections may take place directly between platforms, well sites, and the port, or may go through connection points at given locations. The configuration of the network and sizes of pipes used must be chosen to minimize construction costs. This problem is expressed as a mixed-integer program, and solved both heuristically by Tabu Search and Variable Neighborhood Search methods and exactly by a branch-and-bound method. Two new types of valid inequalities are introduced. Tests are made with data from the South Gabon oil field and randomly generated problems.The work of the first author was supported by NSERC grant #OGP205041. The work of the second author was supported by FCAR (Fonds pour la Formation des Chercheurs et lâAide Ă la Recherche) grant #95-ER-1048, and NSERC grant #GP0105574
- âŚ