192 research outputs found

    A survey of scheduling problems with setup times or costs

    Get PDF
    Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    Flowshop scheduling problems with due date related objectives: A review of the literature

    Get PDF
    3rd International Conference on Industrial Engineering and Industrial Management XIII Congreso de Ingeniería de Organización Barcelona-Terrassa, September 2nd-4th 200

    A heuristic approach for tow-machine no-wait flowshop scheduling with due dates and class setups

    Get PDF
    2005-2006 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    A particle swarm optimisation for the no-wait flow shop problem with due date constraints.

    Get PDF
    Peer ReviewedThis paper considers the no-wait flow shop scheduling problem with due date constraints. In the no-wait flow shop problem, waiting time is not allowed between successive operations of jobs. Moreover, a due date is associated with the completion of each job. The considered objective function is makespan. This problem is proved to be strongly NP-Hard. In this paper, a particle swarm optimisation (PSO) is developed to deal with the problem. Moreover, the effect of some dispatching rules for generating initial solutions are studied. A Taguchi-based design of experience approach has been followed to determine the effect of the different values of the parameters on the performance of the algorithm. To evaluate the performance of the proposed PSO, a large number of benchmark problems are selected from the literature and solved with different due date and penalty settings. Computational results confirm that the proposed PSO is efficient and competitive; the developed framework is able to improve many of the best-known solutions of the test problems available in the literature

    An iterated greedy heuristic for no-wait flow shops with sequence dependent setup times, learning and forgetting effects

    Full text link
    [EN] This paper addresses a sequence dependent setup times no-wait flowshop with learning and forgetting effects to minimize total flowtime. This problem is NP-hard and has never been considered before. A position-based learning and forgetting effects model is constructed. Processing times of operations change with the positions of corresponding jobs in a schedule. Objective increment properties are deduced and based on them three accelerated neighbourhood construction heuristics are presented. Because of the simplicity and excellent performance shown in flowshop scheduling problems, an iterated greedy heuristic is proposed. The proposed iterated greedy algorithm is compared with some existing algorithms for related problems on benchmark instances. Comprehensive computational and statistical tests show that the presented method obtains the best performance among the compared methods. (C) 2018 Elsevier Inc. All rights reserved.This work is supported by the National Natural Science Foundation of China (Nos. 61572127, 61272377), the Collaborative Innovation Center of Wireless Communications Technology and the Key Natural Science Fund for Colleges and Universities in Jiangsu Province (No. 12KJA630001). Ruben Ruiz is partially supported by the Spanish Ministry of Economy and Competitiveness(MINECO), under the project "SCHEYARD - Optimization of Scheduling Problems in Container Yards" with reference DPI2015-65895-R.Li, X.; Yang, Z.; Ruiz García, R.; Chen, T.; Sui, S. (2018). An iterated greedy heuristic for no-wait flow shops with sequence dependent setup times, learning and forgetting effects. Information Sciences. 453:408-425. https://doi.org/10.1016/j.ins.2018.04.038S40842545

    Deterministic Assembly Scheduling Problems: A Review and Classification of Concurrent-Type Scheduling Models and Solution Procedures

    Get PDF
    Many activities in industry and services require the scheduling of tasks that can be concurrently executed, the most clear example being perhaps the assembly of products carried out in manufacturing. Although numerous scientific contributions have been produced on this area over the last decades, the wide extension of the problems covered and the lack of a unified approach have lead to a situation where the state of the art in the field is unclear, which in turn hinders new research and makes translating the scientific knowledge into practice difficult. In this paper we propose a unified notation for assembly scheduling models that encompass all concurrent-type scheduling problems. Using this notation, the existing contributions are reviewed and classified into a single framework, so a comprehensive, unified picture of the field is obtained. In addition, a number of conclusions regarding the state of the art in the topic are presented, as well as some opportunities for future research.Ministerio de Ciencia e Innovación español DPI2016-80750-

    Permutation flow shops with exact time lags to minimise maximum lateness

    Get PDF
    International audienceIn this paper we investigate the m-machine permutation flow shop scheduling problem where exact time lags are defined between consecutive operations of every job. This generic model can be used for the study and analysis of various real situations that may arise, for instance, in the food-producing, pharmaceutical and steel industries. The objective is to minimise the maximum lateness. We study polynomial special cases and provide a dominance relation. We derive lower and upper bounds that are integrated in a branch-and-bound procedure to solve the problem. Three branching schemes are proposed and compared. We perform a computational analysis to evaluate the efficiency of the developed method

    Scheduling problems with the effects of deterioration and learning

    Get PDF
    Author name used in this publication: T. C. E. Cheng2006-2007 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    On the exact solution of the no-wait flow shop problem with due date constraints

    Get PDF
    Peer ReviewedThis paper deals with the no-wait flow shop scheduling problem with due date constraints. In the no-wait flow shop problem, waiting time is not allowed between successive operations of jobs. Moreover, the jobs should be completed before their respective due dates; due date constraints are dealt with as hard constraints. The considered performance criterion is makespan. The problem is strongly NP-hard. This paper develops a number of distinct mathematical models for the problem based on different decision variables. Namely, a mixed integer programming model, two quadratic mixed integer programming models, and two constraint programming models are developed. Moreover, a novel graph representation is developed for the problem. This new modeling technique facilitates the investigation of some of the important characteristics of the problem; this results in a number of propositions to rule out a large number of infeasible solutions from the set of all possible permutations. Afterward, the new graph representation and the resulting propositions are incorporated into a new exact algorithm to solve the problem to optimality. To investigate the performance of the mathematical models and to compare them with the developed exact algorithm, a number of test problems are solved and the results are reported. Computational results demonstrate that the developed algorithm is significantly faster than the mathematical models