408 research outputs found
On the Neutrality of Flowshop Scheduling Fitness Landscapes
Solving efficiently complex problems using metaheuristics, and in particular
local searches, requires incorporating knowledge about the problem to solve. In
this paper, the permutation flowshop problem is studied. It is well known that
in such problems, several solutions may have the same fitness value. As this
neutrality property is an important one, it should be taken into account during
the design of optimization methods. Then in the context of the permutation
flowshop, a deep landscape analysis focused on the neutrality property is
driven and propositions on the way to use this neutrality to guide efficiently
the search are given.Comment: Learning and Intelligent OptimizatioN Conference (LION 5), Rome :
Italy (2011
NILS: a Neutrality-based Iterated Local Search and its application to Flowshop Scheduling
This paper presents a new methodology that exploits specific characteristics
from the fitness landscape. In particular, we are interested in the property of
neutrality, that deals with the fact that the same fitness value is assigned to
numerous solutions from the search space. Many combinatorial optimization
problems share this property, that is generally very inhibiting for local
search algorithms. A neutrality-based iterated local search, that allows
neutral walks to move on the plateaus, is proposed and experimented on a
permutation flowshop scheduling problem with the aim of minimizing the
makespan. Our experiments show that the proposed approach is able to find
improving solutions compared with a classical iterated local search. Moreover,
the tradeoff between the exploitation of neutrality and the exploration of new
parts of the search space is deeply analyzed
Models and Strategies for Variants of the Job Shop Scheduling Problem
Recently, a variety of constraint programming and Boolean satisfiability
approaches to scheduling problems have been introduced. They have in common the
use of relatively simple propagation mechanisms and an adaptive way to focus on
the most constrained part of the problem. In some cases, these methods compare
favorably to more classical constraint programming methods relying on
propagation algorithms for global unary or cumulative resource constraints and
dedicated search heuristics. In particular, we described an approach that
combines restarting, with a generic adaptive heuristic and solution guided
branching on a simple model based on a decomposition of disjunctive
constraints. In this paper, we introduce an adaptation of this technique for an
important subclass of job shop scheduling problems (JSPs), where the objective
function involves minimization of earliness/tardiness costs. We further show
that our technique can be improved by adding domain specific information for
one variant of the JSP (involving time lag constraints). In particular we
introduce a dedicated greedy heuristic, and an improved model for the case
where the maximal time lag is 0 (also referred to as no-wait JSPs).Comment: Principles and Practice of Constraint Programming - CP 2011, Perugia
: Italy (2011
Scheduling flow lines with buffers by ant colony digraph
This work starts from modeling the scheduling of n jobs on m machines/stages as flowshop with buffers in manufacturing. A mixed-integer linear programing model is presented, showing that buffers of size n - 2 allow permuting sequences of jobs between stages. This model is addressed in the literature as non-permutation flowshop scheduling (NPFS) and is described in this article by a disjunctive graph (digraph) with the purpose of designing specialized heuristic and metaheuristics algorithms for the NPFS problem. Ant colony optimization (ACO) with the biologically inspired mechanisms of learned desirability and pheromone rule is shown to produce natively eligible schedules, as opposed to most metaheuristics approaches, which improve permutation solutions found by other heuristics. The proposed ACO has been critically compared and assessed by computation experiments over existing native approaches. Most makespan upper bounds of the established benchmark problems from Taillard (1993) and Demirkol, Mehta, and Uzsoy (1998) with up to 500 jobs on 20 machines have been improved by the proposed ACO
Minimizing the sum of the job completion times in the two-machine flow shop by Lagrangian relaxation
- …