834 research outputs found

    Optimization of Spinning Reserve in Stand-alone Wind-Diesel Power Systems

    Get PDF
    Spinning reserve carried on synchronized units is the most effective resource available to the system operators for managing unforeseen power unbalances, such as demand fluctuations and the sudden loss of generation equipment. The amount of reserve and the speed that it can effectively be deployed determine the supply reliability that the generation system can achieve. Carrying more spinning reserve reduces the probability that the generation system become unable to preserve the momentary power balance and costly remedial actions, such as involuntary load shedding, turns unavoidable to prevent a system collapse. Nevertheless, providing spinning reserve on a continuous basis is expensive. Indeed, the provision of spinning reserve entails incurring in startup costs to commit generating units in excess of the forecasted load, which consequently have to be dispatched at less efficient operating points. The problem of keeping the power balance is still more difficult in stand-alone wind-diesel power systems, since these systems are additionally subjected to random power fluctuations originated in the uncertain and intermittent nature of the wind resource. Furthermore, autonomous power system cannot rely on power imported from interconnections for preserving the power balance. The inherent characteristics of these systems require scheduling more reserve on synchronized units for ensuring adequate security and reliability levels. The higher reserve requirements may substantially deteriorate the economy of these supply systems. The costs of keeping spinning reserve must be compared with the benefits that it provides in terms of lower expected costs of interruptions. In essence, the optimal reserve level can be set so that the marginal cost of carrying an additional MW equals the marginal reduction of the expected load curtailment costs. Despite the apparent simplicity of this optimality condition, determining the optimal amount of spinning reserve in a practical setting presents substantial modelling complexities and computational challenges. Given the random nature of the disturbances and contingencies that may face a generation system, assessing the benefits of carrying a certain amount of spinning reserve involves quantifying the occurrence probability, Wind Power 2 duration, extent and costs of load loss events. Such evaluation entails modelling the stochastic behaviour of system operation by considering the random failure of system components and the stochastic fluctuations of load and wind generation. The problem is probabilistic in its very nature and thus it may be appropriately treated by applying stochastic modelling techniques. Only with the advent of more powerful computing hardware, the problem of optimizing the spinning reserve has attracted the interest of researchers and its solution is currently deemed practicable. This work proposes a novel method for determining the optimal amount of spinning reserve that should be carried in autonomous hybrid wind-diesel generation systems. The optimal spinning reserve is determined by comparing the cost of its provision with the economic benefits it delivers in terms of supply reliability. The proposed approach is still general and can be applied in straightforward manner to establish the optimal reserve level in large interconnected systems. The presented methodology considers with accuracy the probabilistic features of the load and the wind generation, as well as the random outages of the conventional generating units. By applying high-resolution chronological simulation techniques, the stochastic features of the integrated operation of the diesel units and the wind turbine can be detailed replicated. The mathematical model appropriately considers all relevant characteristics and operational constraints of the generating units, e.g. non-linear heat rate curve, maximum and minimum output, startup and synchronization time, minimum down and uptime, ramping, etc. Massive stochastic simulation methods allow assessing the system reliability and valuing the economic costs of loss load events. Global search methods like particle swarm optimization (PSO) are proposed for finding the optimal scheduling policy and spinning reserve requirement that minimizes the sum of the expected operation costs and the expected costs of the energy not served.Fil: Olsina, Fernando Gabriel. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Conicet - San Juan; Argentina. Universidad Nacional de San Juan. Facultad de Ingeniería. Instituto de Energía Eléctrica; ArgentinaFil: Larisson, Carlos Hugo. No especifíca

    Risk based multi-objective security control and congestion management

    Get PDF
    Deterministic security criterion has served power system operation, congestion management quite well in last decades. It is simple to be implemented in a security control model, for example, security constrained optimal power flow (SCOPF). However, since event likelihood and violation information are not addressed, it does not provide quantitative security understanding, and so results in system inadequate awareness. Therefore, even if computation capability and information techniques have been greatly improved and widely applied in the operation support tool, operators are still not able to get rid of the security threat, especially in the market competitive environment.;Probability approach has shown its strong ability for planning purpose, and recently gets attention in operation area. Since power system security assessment needs to analyze consequence of all credible events, risk defined as multiplication of event probability and severity is well suited to give an indication to quantify the system security level, and congestion level as well. Since risk addresses extra information, its application for making BETTER online operation decision becomes an attractive research topic.;This dissertation focus on system online risk calculation, risk based multi-objective optimization model development, risk based security control design, and risk based congestion management. A regression model is proposed to predict contingency probability using weather and geography information for online risk calculation. Risk based multi-objective optimization (RBMO) model is presented, considering conflict objectives: risks and cost. Two types of method, classical methods and evolutionary algorithms, are implemented to solve RBMO problem, respectively. A risk based decision making architecture for security control is designed based on the Pareto-optimal solution understanding, visualization tool and high level information analysis. Risk based congestion management provides a market lever to uniformly expand a security VOLUME , where greater volume means more risk. Meanwhile, risk based LMP signal contracts ALL dimensions of this VOLUME in proper weights (state probabilities) at a time.;Two test systems, 6-bus and IEEE RTS 96, are used to test developed algorithms. The simulation results show that incorporating risk into security control and congestion management will evolve our understanding of security level, improve control and market efficiency, and support operator to maneuver system in an effective fashion

    Intelligent power system operation in an uncertain environment

    Get PDF
    This dissertation presents some challenging problems in power system operations. The efficacy of a heuristic method, namely, modified discrete particle swarm optimization (MDPSO) algorithm is illustrated and compared with other methods by solving the reliability based generator maintenance scheduling (GMS) optimization problem of a practical hydrothermal power system. The concept of multiple swarms is incorporated into the MDPSO algorithm to form a robust multiple swarms-modified particle swarm optimization (MS-MDPSO) algorithm and applied to solving the GMS problem on two power systems. Heuristic methods are proposed to circumvent the problems of imposed non-smooth assumptions common with the classical approaches in solving the challenging dynamic economic dispatch problem. The multi-objective combined economic and emission dispatch (MO-CEED) optimization problem for a wind-hydrothermal power system is formulated and solved in this dissertation. This MO-CEED problem formulation becomes a challenging problem because of the presence of uncertainty in wind power. A family of distributed optimal Pareto fronts for the MO-CEED problem has been generated for different scenarios of capacity credit of wind power. A real-time (RT) network stability index is formulated for determining a power system\u27s ability to continue to provide service (electric energy) in a RT manner in case of an unforeseen catastrophic contingency. Cascading stages of fuzzy inference system is applied to combine non real-time (NRT) and RT power system assessments. NRT analysis involves eigenvalue and transient energy analysis. RT analysis involves angle, voltage and frequency stability indices. RT Network status index is implemented in real-time on a practical power system --Abstract, page iv

    Forecasting tools and probabilistic scheduling approach incorporatins renewables uncertainty for the insular power systems industry

    Get PDF
    Nowadays, the paradigm shift in the electricity sector and the advent of the smart grid, along with the growing impositions of a gradual reduction of greenhouse gas emissions, pose numerous challenges related with the sustainable management of power systems. The insular power systems industry is heavily dependent on imported energy, namely fossil fuels, and also on seasonal tourism behavior, which strongly influences the local economy. In comparison with the mainland power system, the behavior of insular power systems is highly influenced by the stochastic nature of the renewable energy sources available. The insular electricity grid is particularly sensitive to power quality parameters, mainly to frequency and voltage deviations, and a greater integration of endogenous renewables potential in the power system may affect the overall reliability and security of energy supply, so singular care should be placed in all forecasting and system operation procedures. The goals of this thesis are focused on the development of new decision support tools, for the reliable forecasting of market prices and wind power, for the optimal economic dispatch and unit commitment considering renewable generation, and for the smart control of energy storage systems. The new methodologies developed are tested in real case studies, demonstrating their computational proficiency comparatively to the current state-of-the-art

    Agent-based technology applied to power systems reliability

    Get PDF
    Tese de doutoramento. Engenharia Electrotécnica e de Computadores. Faculdade de Engenharia. Universidade do Porto. 200

    Reinforcement Learning and Tree Search Methods for the Unit Commitment Problem

    Get PDF
    The unit commitment (UC) problem, which determines operating schedules of generation units to meet demand, is a fundamental task in power systems operation. Existing UC methods using mixed-integer programming are not well-suited to highly stochastic systems. Approaches which more rigorously account for uncertainty could yield large reductions in operating costs by reducing spinning reserve requirements; operating power stations at higher efficiencies; and integrating greater volumes of variable renewables. A promising approach to solving the UC problem is reinforcement learning (RL), a methodology for optimal decision-making which has been used to conquer long-standing grand challenges in artificial intelligence. This thesis explores the application of RL to the UC problem and addresses challenges including robustness under uncertainty; generalisability across multiple problem instances; and scaling to larger power systems than previously studied. To tackle these issues, we develop guided tree search, a novel methodology combining model-free RL and model-based planning. The UC problem is formalised as a Markov decision process and we develop an open-source environment based on real data from Great Britain's power system to train RL agents. In problems of up to 100 generators, guided tree search is shown to be competitive with deterministic UC methods, reducing operating costs by up to 1.4\%. An advantage of RL is that the framework can be easily extended to incorporate considerations important to power systems operators such as robustness to generator failure, wind curtailment or carbon prices. When generator outages are considered, guided tree search saves over 2\% in operating costs as compared with methods using conventional NxN-x reserve criteria
    corecore