A survey of simulation techniques in commerce and defence
Despite the developments in Modelling and Simulation (M&S) tools and techniques over the past years, there has been a gap in the M&S research and practice in healthcare on developing a toolkit to assist the modellers and simulation practitioners with selecting an appropriate set of techniques. This study is a preliminary step towards this goal. This paper presents some results from a systematic literature survey on applications of M&S in the commerce and defence domains that could inspire some improvements in the healthcare. Interim results show that in the commercial sector Discrete-Event Simulation (DES) has been the most widely used technique with System Dynamics (SD) in second place. However in the defence sector, SD has gained relatively more attention. SD has been found quite useful for qualitative and soft factors analysis. From both the surveys it becomes clear that there is a growing trend towards using hybrid M&S approaches
A virtual environment for the design and simulated construction of prefabricated buildings
The construction industry has acknowledged that its current working practices are in need of substantial improvements in quality and efficiency and has identified that computer modelling techniques and the use of prefabricated components can help reduce times, costs, and minimise defects and problems of on-site construction. This paper describes a virtual environment to support the design and construction processes of buildings from prefabricated components and the simulation of their construction sequence according to a project schedule. The design environment can import a library of 3-D models of prefabricated modules that can be used to interactively design a building. Using Microsoft Project, the construction schedule of the designed building can be altered, with this information feeding back to the construction simulation environment. Within this environment the order of construction can be visualised using virtual machines. Novel aspects of the system are that it provides a single 3-D environment where the user can construct their design with minimal user interaction through automatic constraint recognition and view the real-time simulation of the construction process within the environment. This takes this area of research a step forward from other systems that only allow the planner to view the construction at certain stages, and do not provide an animated view of the construction process
Recommended from our members
Project Controls and Management Systems : current practice and how it has changed over the past decade
Project Controls and Management System (PCMS) refers to an ecosystem of processes, tools and personnel required for the proper planning and execution of capital projects throughout the different phases of design, procurement, construction and startup. This can be divided into different focus areas (functions) that would include Estimating, Planning, Scheduling, Cost Control, Change Management, Progressing, and Forecasting. Various trends such as globalization, contractor specialization and information technology developments have impacted the way PCMS are implemented and made it the subject of extensive research over the past years to investigate how to best utilize those trends. Replicating the research methodology used in a 2011 report published by the Construction Research Institute (CII), this work aims to investigate the current status of PCMS implementation and how it has changed over the past decade. It was concluded that while the original PCMS principles are still valid, adoption has drastically changed in terms of efficiency for the majority of the functions. The research also identifies areas of potential concerns and provides recommendations for further improvement.Civil, Architectural, and Environmental Engineerin
Enhancing the decision-making process of project managers in the built environment: An integrated approach
A study of the project manager’s (PM) function must be to examine: what their role is, their skills, and training needed. The project manager needs wide perspective regarding the classic management functions of control, coordination, communication, and the settling of performance standards. If the PM is a professional, their performance must be of the highest standard, and must be accountable for a high level of productivity. This is the project manager’s Achilles heel.
Another problem is the absence of feedback during the early stages through to completion of the project. During the project’s life the relative importance of their responsibilities may change several times, including the constant changing of the dynamic environment. The PM will aim for a balanced emphasis; they will try to be flexible so they can adapt to new circumstances as they occur. The PM needs tried and tested methods to aid his decision making. This paper posits an integrated development and use of methods such as; scenario planning, effectuation, and reflective thinking to enhance decision making. The paper concludes with potential benefits that this method brings to the PM when fully understood and tested in the application domain
Integrating BIM and Planning Software for Health and Safety Site Induction
Project management software packages have been around for quite a long time to help managers to run construction projects effectively. Building Information Modelling – also known as Object-orientated Modelling technology was used at the beginning in architectural design which has become more widespread in structural and services engineering. The development of BIM modelling has made the tool more users friendly. As a result, BIM became widely used by most practitioners in their specialist areas. For health and safety practitioners within construction project management, This tool has not been fully explored. BIM technology has the potential to be used in safety planning procedures particularly those related to tasks on construction sites.
The section of the research presented in this paper intend to explore and review health and safety issues on construction site with the sole intension of using better visualisation software to meet the needs of health and safety site practitioners in understanding such H&S problems. A framework needed for better H&S practice on site that may be used actively by all practitioners will be developed. The intension is to find a way forward in addressing ‘real’ health and safety site issues that may not be easy to be understood by practitioners without the full aid of visualisation.
Keywords: Health, Safety, construction site, BIM, 4D Modellin
Advanced security infrastructures for grid education
This paper describes the research conducted into advanced authorization infrastructures at the National e-Science Centre (NeSC) at the University of Glasgow and their application to support a teaching environment as part of the Dynamic Virtual Organisations in e-Science Education (DyVOSE) project. We outline the lessons learnt in teaching Grid computing and rolling out the associated security authorisation infrastructures, and describe our plans for a future, extended security infrastructure for dynamic establishment of inter-institutional virtual organisations (VO) in the education domain
- …