A Novel Approach to the Common Due-Date Problem on Single and Parallel Machines
This paper presents a novel idea for the general case of the Common Due-Date
(CDD) scheduling problem. The problem is about scheduling a certain number of
jobs on a single or parallel machines where all the jobs possess different
processing times but a common due-date. The objective of the problem is to
minimize the total penalty incurred due to earliness or tardiness of the job
completions. This work presents exact polynomial algorithms for optimizing a
given job sequence for single and identical parallel machines with the run-time
complexities of for both cases, where is the number of jobs.
Besides, we show that our approach for the parallel machine case is also
suitable for non-identical parallel machines. We prove the optimality for the
single machine case and the runtime complexities of both. Henceforth, we extend
our approach to one particular dynamic case of the CDD and conclude the chapter
with our results for the benchmark instances provided in the OR-library.Comment: Book Chapter 22 page
Optimal Algorithms for Scheduling under Time-of-Use Tariffs
We consider a natural generalization of classical scheduling problems in
which using a time unit for processing a job causes some time-dependent cost
which must be paid in addition to the standard scheduling cost. We study the
scheduling objectives of minimizing the makespan and the sum of (weighted)
completion times. It is not difficult to derive a polynomial-time algorithm for
preemptive scheduling to minimize the makespan on unrelated machines. The
problem of minimizing the total (weighted) completion time is considerably
harder, even on a single machine. We present a polynomial-time algorithm that
computes for any given sequence of jobs an optimal schedule, i.e., the optimal
set of time-slots to be used for scheduling jobs according to the given
sequence. This result is based on dynamic programming using a subtle analysis
of the structure of optimal solutions and a potential function argument. With
this algorithm, we solve the unweighted problem optimally in polynomial time.
For the more general problem, in which jobs may have individual weights, we
develop a polynomial-time approximation scheme (PTAS) based on a dual
scheduling approach introduced for scheduling on a machine of varying speed. As
the weighted problem is strongly NP-hard, our PTAS is the best possible
approximation we can hope for.Comment: 17 pages; A preliminary version of this paper with a subset of
results appeared in the Proceedings of MFCS 201
Throughput Maximization in Multiprocessor Speed-Scaling
We are given a set of jobs that have to be executed on a set of
speed-scalable machines that can vary their speeds dynamically using the energy
model introduced in [Yao et al., FOCS'95]. Every job is characterized by
its release date , its deadline , its processing volume if
is executed on machine and its weight . We are also given a budget
of energy and our objective is to maximize the weighted throughput, i.e.
the total weight of jobs that are completed between their respective release
dates and deadlines. We propose a polynomial-time approximation algorithm where
the preemption of the jobs is allowed but not their migration. Our algorithm
uses a primal-dual approach on a linearized version of a convex program with
linear constraints. Furthermore, we present two optimal algorithms for the
non-preemptive case where the number of machines is bounded by a fixed
constant. More specifically, we consider: {\em (a)} the case of identical
processing volumes, i.e. for every and , for which we
present a polynomial-time algorithm for the unweighted version, which becomes a
pseudopolynomial-time algorithm for the weighted throughput version, and {\em
(b)} the case of agreeable instances, i.e. for which if and only
if , for which we present a pseudopolynomial-time algorithm. Both
algorithms are based on a discretization of the problem and the use of dynamic
programming
Framework for sustainable TVET-Teacher Education Program in Malaysia Public Universities
Studies had stated that less attention was given to the education aspect, such as
teaching and learning in planning for improving the TVET system. Due to the 21st
Century context, the current paradigm of teaching for the TVET educators also has
been reported to be fatal and need to be shifted. All these disadvantages reported
hindering the country from achieving the 5th strategy in the Strategic Plan for
Vocational Education Transformation to transform TVET system as a whole.
Therefore, this study aims to develop a framework for sustainable TVET Teacher
Education program in Malaysia. This study had adopted an Exploratory Sequential
Mix-Method design, which involves a semi-structured interview (phase one) and
survey method (phase two). Nine experts had involved in phase one chosen by using
Purposive Sampling Technique. As in phase two, 118 TVET-TE program lecturers
were selected as the survey sample chosen through random sampling method. After
data analysis in phase one (thematic analysis) and phase two (Principal Component
Analysis), eight domains and 22 elements have been identified for the framework for
sustainable TVET-TE program in Malaysia. This framework was identified to embed
the elements of 21st Century Education, thus filling the gap in this research. The
research findings also indicate that the developed framework was unidimensional and
valid for the development and research regarding TVET-TE program in Malaysia.
Lastly, it is in the hope that this research can be a guide for the nations in producing a
quality TVET teacher in the future
Dynamic resource constrained multi-project scheduling problem with weighted earliness/tardiness costs
In this study, a conceptual framework is given for the dynamic multi-project scheduling problem with weighted earliness/tardiness costs (DRCMPSPWET) and a mathematical programming formulation of the problem is provided. In DRCMPSPWET, a project arrives on top of an existing project portfolio and a due date has to be quoted for the new project while minimizing the costs of schedule changes. The objective function consists of the weighted earliness tardiness costs of the activities of the existing projects in the current baseline schedule plus a term that increases linearly with the anticipated completion time of the new project. An iterated local search based approach is developed for large instances of this problem. In order to analyze the performance and behavior of the proposed method, a new multi-project data set is created by controlling the total number of activities, the due date tightness, the due date range, the number of resource types, and the completion time factor in an instance. A series of computational experiments are carried out to test the performance of the local search approach. Exact solutions are provided for the small instances. The results indicate that the local search heuristic performs well in terms of both solution quality and solution time
Optimizing production scheduling of steel plate hot rolling for economic load dispatch under time-of-use electricity pricing
Time-of-Use (TOU) electricity pricing provides an opportunity for industrial
users to cut electricity costs. Although many methods for Economic Load
Dispatch (ELD) under TOU pricing in continuous industrial processing have been
proposed, there are still difficulties in batch-type processing since power
load units are not directly adjustable and nonlinearly depend on production
planning and scheduling. In this paper, for hot rolling, a typical batch-type
and energy intensive process in steel industry, a production scheduling
optimization model for ELD is proposed under TOU pricing, in which the
objective is to minimize electricity costs while considering penalties caused
by jumps between adjacent slabs. A NSGA-II based multi-objective production
scheduling algorithm is developed to obtain Pareto-optimal solutions, and then
TOPSIS based multi-criteria decision-making is performed to recommend an
optimal solution to facilitate filed operation. Experimental results and
analyses show that the proposed method cuts electricity costs in production,
especially in case of allowance for penalty score increase in a certain range.
Further analyses show that the proposed method has effect on peak load
regulation of power grid.Comment: 13 pages, 6 figures, 4 table
- …