The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review
Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe
Project scheduling under undertainty – survey and research potentials.
The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the real world, project activities are subject to considerable uncertainty, that is gradually resolved during project execution. In this survey we review the fundamental approaches for scheduling under uncertainty: reactive scheduling, stochastic project scheduling, stochastic GERT network scheduling, fuzzy project scheduling, robust (proactive) scheduling and sensitivity analysis. We discuss the potentials of these approaches for scheduling projects under uncertainty.Management; Project management; Robustness; Scheduling; Stability;
An investigation of the trading agent competition : a thesis presented in partial fulfilment of the requirements for the degree of Master of Science in Computer Science at Massey University, Albany, New Zealand
The Internet has swept over the whole world. It is influencing almost every aspect of society. The blooming of electronic commerce on the back of the Internet further increases globalisation and free trade. However, the Internet will never reach its full potential as a new electronic media or marketplace unless agents are developed. The trading Agent Competition (TAC), which simulates online auctions, was designed to create a standard problem in the complex domain of electronic marketplaces and to inspire researchers from all over the world to develop distinctive software agents to a common exercise. In this thesis, a detailed study of intelligent software agents and a comprehensive investigation of the Trading Agent Competition will be presented. The design of the Risker Wise agent and a fuzzy logic system predicting the bid increase of the hotel auction in the TAC game will be discussed in detail
Recommended from our members
A reliability-and-cost-based fuzzy approach to optimize preventive maintenance scheduling for offshore wind farms
We study the preventive maintenance scheduling problem of wind farms in the offshore wind energy sector which operates under uncertainty due to the state of the ocean and market demand. We formulate a fuzzy multi-objective non-linear chance-constrained programming model with newly-defined reliability and cost criteria and constraints to obtain satisfying schedules for wind turbine maintenance. To solve the optimization model, a 2-phase solution framework integrating the operational law for fuzzy arithmetic and the non-dominated sorting genetic algorithm II for multi-objective programming is developed. Pareto-optimal solutions of the schedules are obtained to form the trade-offs between the reliability maximization and cost minimization objectives. A numerical example is illustrated to validate the model
Pre-emptive resource-constrained multimode project scheduling using genetic algorithm: a dynamic forward approach
Purpose: The issue resource over-allocating is a big concern for project engineers in the process
of scheduling project activities. Resource over-allocating drawback is frequently seen after
scheduling of a project in practice which causes a schedule to be useless. Modifying an
over-allocated schedule is very complicated and needs a lot of efforts and time. In this paper, a
new and fast tracking method is proposed to schedule large scale projects which can help project
engineers to schedule the project rapidly and with more confidence.
Design/methodology/approach: In this article, a forward approach for maximizing net
present value (NPV) in multi-mode resource constrained project scheduling problem while
assuming discounted positive cash flows (MRCPSP-DCF) is proposed. The progress payment
method is used and all resources are considered as pre-emptible. The proposed approach
maximizes NPV using unscheduled resources through resource calendar in forward mode. For
this purpose, a Genetic Algorithm is applied to solve.
Findings: The findings show that the proposed method is an effective way to maximize NPV in
MRCPSP-DCF problems while activity splitting is allowed. The proposed algorithm is very fast
and can schedule experimental cases with 1000 variables and 100 resources in few seconds. The
results are then compared with branch and bound method and simulated annealing algorithm and
it is found the proposed genetic algorithm can provide results with better quality. Then algorithm
is then applied for scheduling a hospital in practice.
Originality/value: The method can be used alone or as a macro in Microsoft Office Project®
Software to schedule MRCPSP-DCF problems or to modify resource over-allocated activities
after scheduling a project. This can help project engineers to schedule project activities rapidly
with more accuracy in practice.Peer Reviewe
Recommended from our members
A review of asset management literature on multi-asset systems
This article gives an overview of the literature on asset management for multi-unit systems with an emphasis on two multi-asset categories: fleet (a system of homogeneous assets) and portfolio (a system of heterogeneous assets). As asset systems become more complicated, researchers have employed different terms to refer to their specific problems. With an
objective to facilitate readers in searching conducive studies to their interests, this paper establishes a novel classification scheme for multi-unit systems in accordance with essential features such as diversity of assets and intervention options. Moreover, discerning differences in characteristics between cross-component and cross-asset interactions, we select three types of potential multi-component dependencies (performance, stochastic, and resource) and extend their notions to be applicable to multi-asset systems. The investigation into these dependencies enables the identification of problems that could exist in real industrial settings
but are yet to be determined in academia. Ultimately, we delve into modelling approaches adopted by previous researchers. This comprehensive information allows us to offer the insights into the current trends in multi-asset maintenance. We expect that the output of this review paper will not only stress research gaps on multi-asset systems, but more importantly
help systematise future studies on this aspect
- …