275 research outputs found

    A single-machine scheduling problem with multiple unavailability constraints: A mathematical model and an enhanced variable neighborhood search approach

    Get PDF
    AbstractThis research focuses on a scheduling problem with multiple unavailability periods and distinct due dates. The objective is to minimize the sum of maximum earliness and tardiness of jobs. In order to optimize the problem exactly a mathematical model is proposed. However due to computational difficulties for large instances of the considered problem a modified variable neighborhood search (VNS) is developed. In basic VNS, the searching process to achieve to global optimum or near global optimum solution is totally random, and it is known as one of the weaknesses of this algorithm. To tackle this weakness, a VNS algorithm is combined with a knowledge module. In the proposed VNS, knowledge module extracts the knowledge of good solution and save them in memory and feed it back to the algorithm during the search process. Computational results show that the proposed algorithm is efficient and effective

    Exact and Heuristic Algorithms for the Job Shop Scheduling Problem with Earliness and Tardiness Over a Common Due Date

    Get PDF
    Scheduling has turned out to be a fundamental activity for both production and service organizations. As competitive markets emerge, Just-In-Time (JIT) production has obtained more importance as a way of rapidly responding to continuously changing market forces. Due to their realistic assumptions, job shop production environments have gained much research effort among scheduling researchers. This research develops exact and heuristic methods and algorithms to solve the job shop scheduling problem when the objective is to minimize both earliness and tardiness costs over a common due date. The objective function of minimizing earliness and tardiness costs captures the essence of the JIT approach in job shops. A dynamic programming procedure is developed to solve smaller instances of the problem, and a Multi-Agent Systems approach is developed and implemented to solve the problem for larger instances since this problem is known to be NP-Hard in a strong sense. A combinational auction-based approach using a Mixed-Integer Linear Programming (MILP) model to construct and evaluate the bids is proposed. The results showed that the proposed combinational auction-based algorithm is able to find optimal solutions for problems that are balanced in processing times across machines. A price discrimination process is successfully implemented to deal with unbalanced problems. The exact and heuristic procedures developed in this research are the first steps to create a structured approach to handle this problem and as a result, a set of benchmark problems will be available to the scheduling research community

    04231 Abstracts Collection -- Scheduling in Computer and Manufacturing Systems

    Get PDF
    During 31.05.-04.06.04, the Dagstuhl Seminar 04231 "Scheduling in Computer and Manufacturing Systems" was held in the International Conference and Research Center (IBFI), Schloss Dagstuhl. During the seminar, several participants presented their current research, and ongoing work and open problems were discussed. Abstracts of the presentations given during the seminar as well as abstracts of seminar results and ideas are put together in this paper. The first section describes the seminar topics and goals in general. Links to extended abstracts or full papers are provided, if available

    Auction based scheduling for distributed systems

    Get PDF
    Cataloged from PDF version of article.Businesses deal with huge databases over a geographically distributed supply network. When this is combined with scheduling and planning needs, it becomes too difficult to handle. Recently, Fast Consumer Goods sector tends to consolidate their manufacturing facilities on a single supplier serving to a distributed customer network. This decentralized structure causes imperfect information sharing between customers and the supplier. We model this problem as a single machine distributed scheduling problem with job agents representing the customers and the machine agent representing the supplier. For benchmarking purpose, we analyzed the problem under three different scenarios: decentralized utility case (realistic case), centralized utility case, centralized cost case (classical single machine early/tardy problem). We developed Auction Based Algorithm by exploiting the opportunity to use game theoretic approach to solve the problem in the decentralized utility case. We used optimization techniques (Lagrangean Relaxation and Branch-and-Bound) for the centralized cases. Results of our extensive computational experiments indicate that Auction Based Algorithm converges to the upper bound found for the total utility measure.Zarifoğlu, EmrahM.S

    A new hybrid meta-heuristic algorithm for solving single machine scheduling problems

    Get PDF
    A dissertation submitted in partial ful lment of the degree of Master of Science in Engineering (Electrical) (50/50) in the Faculty of Engineering and the Built Environment Department of Electrical and Information Engineering May 2017Numerous applications in a wide variety of elds has resulted in a rich history of research into optimisation for scheduling. Although it is a fundamental form of the problem, the single machine scheduling problem with two or more objectives is known to be NP-hard. For this reason we consider the single machine problem a good test bed for solution algorithms. While there is a plethora of research into various aspects of scheduling problems, little has been done in evaluating the performance of the Simulated Annealing algorithm for the fundamental problem, or using it in combination with other techniques. Speci cally, this has not been done for minimising total weighted earliness and tardiness, which is the optimisation objective of this work. If we consider a mere ten jobs for scheduling, this results in over 3.6 million possible solution schedules. It is thus of de nite practical necessity to reduce the search space in order to nd an optimal or acceptable suboptimal solution in a shorter time, especially when scaling up the problem size. This is of particular importance in the application area of packet scheduling in wireless communications networks where the tolerance for computational delays is very low. The main contribution of this work is to investigate the hypothesis that inserting a step of pre-sampling by Markov Chain Monte Carlo methods before running the Simulated Annealing algorithm on the pruned search space can result in overall reduced running times. The search space is divided into a number of sections and Metropolis-Hastings Markov Chain Monte Carlo is performed over the sections in order to reduce the search space for Simulated Annealing by a factor of 20 to 100. Trade-o s are found between the run time and number of sections of the pre-sampling algorithm, and the run time of Simulated Annealing for minimising the percentage deviation of the nal result from the optimal solution cost. Algorithm performance is determined both by computational complexity and the quality of the solution (i.e. the percentage deviation from the optimal). We nd that the running time can be reduced by a factor of 4.5 to ensure a 2% deviation from the optimal, as compared to the basic Simulated Annealing algorithm on the full search space. More importantly, we are able to reduce the complexity of nding the optimal from O(n:n!) for a complete search to O(nNS) for Simulated Annealing to O(n(NMr +NS)+m) for the input variables n jobs, NS SA iterations, NM Metropolis- Hastings iterations, r inner samples and m sections.MT 201

    Heuristic Algorithms to Minimize Total Weighted Tardiness on the Single Machine and Identical Parallel Machines with Sequence Dependent Setup and Future Ready Time

    Get PDF
    This study generates heuristic algorithms to minimize the total weighted tardiness on the single machine and identical parallel machines with sequence dependent setup and future ready time. Due to the complexity of the considered problem, we propose two new Apparent Tardiness Cost based (ATC-based) rules. The performances of these two rules are evaluated on the single machine and identical parallel machines. Besides of these two rules, we also propose a look-ahead identical parallel machines heuristic (LAIPM). When a machine becomes idle, it selects a job to process from available jobs and near future jobs. The proposed method, LAIPM, is evaluated with other look-ahead methods on the identical parallel machines