381 research outputs found

    Algorithms for minimizing maximum lateness with unit length tasks and resource constraints

    Get PDF
    AbstractThe problem we consider is that of scheduling n unit length tasks on identical processors in the presence of additional scarce resources. The objective is to minimize maximum lateness. It has been known for some time that the problem is NP-hard even for two processors and one resource type. In the present paper we show that the problem can be solved in O(n log n) time, even for an arbitrary number of resources if the instance of the problem has the saturation property (i.e., no resource unit is idle in an optimal schedule). For the more general problem without saturation, two heuristic algorithms and a branch and bound approach are proposed. The results of computational tests of the above methods are also reported

    Scheduling theory since 1981: an annotated bibliography

    Get PDF

    Least space-time first scheduling algorithm : scheduling complex tasks with hard deadline on parallel machines

    Get PDF
    Both time constraints and logical correctness are essential to real-time systems and failure to specify and observe a time constraint may result in disaster. Two orthogonal issues arise in the design and analysis of real-time systems: one is the specification of the system, and the semantic model describing the properties of real-time programs; the other is the scheduling and allocation of resources that may be shared by real-time program modules. The problem of scheduling tasks with precedence and timing constraints onto a set of processors in a way that minimizes maximum tardiness is here considered. A new scheduling heuristic, Least Space Time First (LSTF), is proposed for this NP-Complete problem. Basic properties of LSTF are explored; for example, it is shown that (1) LSTF dominates Earliest-Deadline-First (EDF) for scheduling a set of tasks on a single processor (i.e., if a set of tasks are schedulable under EDF, they are also schedulable under LSTF); and (2) LSTF is more effective than EDF for scheduling a set of independent simple tasks on multiple processors. Within an idealized framework, theoretical bounds on maximum tardiness for scheduling algorithms in general, and tighter bounds for LSTF in particular, are proven for worst case behavior. Furthermore, simulation benchmarks are developed, comparing the performance of LSTF with other scheduling disciplines for average case behavior. Several techniques are introduced to integrate overhead (for example, scheduler and context switch) and more realistic assumptions (such as inter-processor communication cost) in various execution models. A workload generator and symbolic simulator have been implemented for comparing the performance of LSTF (and a variant -- LSTF+) with that of several standard scheduling algorithms. LSTF\u27s execution model, basic theories, and overhead considerations have been defined and developed. Based upon the evidence, it is proposed that LSTF is a good and practical scheduling algorithm for building predictable, analyzable, and reliable complex real-time systems. There remain some open issues to be explored, such as relaxing some current restrictions, discovering more properties and theorems of LSTF under different models, etc. We strongly believe that LSTF can be a practical scheduling algorithm in the near future

    Algorithms for Scheduling Problems

    Get PDF
    This edited book presents new results in the area of algorithm development for different types of scheduling problems. In eleven chapters, algorithms for single machine problems, flow-shop and job-shop scheduling problems (including their hybrid (flexible) variants), the resource-constrained project scheduling problem, scheduling problems in complex manufacturing systems and supply chains, and workflow scheduling problems are given. The chapters address such subjects as insertion heuristics for energy-efficient scheduling, the re-scheduling of train traffic in real time, control algorithms for short-term scheduling in manufacturing systems, bi-objective optimization of tortilla production, scheduling problems with uncertain (interval) processing times, workflow scheduling for digital signal processor (DSP) clusters, and many more

    A survey of scheduling problems with setup times or costs

    Get PDF
    Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    Single-machine bicriteria scheduling

    Get PDF

    Project scheduling under undertainty – survey and research potentials.

    Get PDF
    The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the real world, project activities are subject to considerable uncertainty, that is gradually resolved during project execution. In this survey we review the fundamental approaches for scheduling under uncertainty: reactive scheduling, stochastic project scheduling, stochastic GERT network scheduling, fuzzy project scheduling, robust (proactive) scheduling and sensitivity analysis. We discuss the potentials of these approaches for scheduling projects under uncertainty.Management; Project management; Robustness; Scheduling; Stability;