67,909 research outputs found
A Typical Verification Challenge for the GRID
A typical verification challenge for the GRID community is\ud
presented. The concrete challenge is to implement a simple recursive algorithm for finding the strongly connected components in a graph. The graph is typically stored in the collective memory of a number of computers, so a distributed algorithm is necessary.\ud
\ud
The implementation should be efficient and scalable, and separate synchronization and implementation details from the purely algorithmic aspects. In the end, a framework is envisaged for distributed algorithms on very large graphs. This would be useful to explore various alternative algorithmic choices
Recommended from our members
UC Berkeley's Cory Hall: Evaluation of Challenges and Potential Applications of Building-to-Grid Implementation
From September 2009 through June 2010, a team of researchers developed, installed, and tested instrumentation on the energy flows in Cory Hall on the UC Berkeley campus to create a Building-to-Grid testbed. The UC Berkeley team was headed by Professor David Culler, and assisted by members from EnerNex, Lawrence Berkeley National Laboratory, California State University Sacramento, and the California Institute for Energy & Environment. While the Berkeley team mapped the load tree of the building, EnerNex researched types of meters, submeters, monitors, and sensors to be used (Task 1). Next the UC Berkeley team analyzed building needs and designed the network of metering components and data storage/visualization software (Task 2). After meeting with vendors in January, the UCB team procured and installed the components starting in late March (Task 3). Next, the UCB team tested and demonstrated the system (Task 4). Meanwhile, the CSUS team documented the methodology and steps necessary to implement a testbed (Task 5) and Harold Galicer developed a roadmap for the CSUS Smart Grid Center with results from the testbed (Task 5a) and evaluated the Cory Hall implementation process (Task 5b). The CSUS team also worked with local utilities to develop an approach to the energy information communication link between buildings and the utility (Task 6). The UC Berkeley team then prepared a roadmap to outline necessary technology development for Building-to-Grid, and presented the results of the project in early July (Task 7). Finally, CIEE evaluated the implementation, noting challenges and potential applications of Building-to-Grid (Task 8). These deliverables are available at the i4Energy site: http://i4energy.org/
The prospect of using LES and DES in engineering design, and the research required to get there
In this paper we try to look into the future to divine how large eddy and
detached eddy simulations (LES and DES, respectively) will be used in the
engineering design process about 20-30 years from now. Some key challenges
specific to the engineering design process are identified, and some of the
critical outstanding problems and promising research directions are discussed.Comment: accepted for publication in the Royal Society Philosophical
Transactions
Recommended from our members
Provision of secondary frequency regulation by coordinated dispatch of industrial loads and thermal power plants
Demand responsive industrial loads with high thermal inertia have potential to provide ancillary service for frequency regulation in the power market. To capture the benefit, this study proposes a new hierarchical framework to coordinate the demand responsive industrial loads with thermal power plants in an industrial park for secondary frequency control. In the proposed framework, demand responsive loads and generating resources are coordinated for optimal dispatch in two-time scales: (1) the regulation reserve of the industrial park is optimally scheduled in a day-ahead manner. The stochastic regulation signal is replaced by the specific extremely trajectories. Furthermore, the extremely trajectories are achieved by the day-ahead predicted regulation mileage. The resulting benefit is to transform the stochastic reserve scheduling problem into a deterministic optimization; (2) a model predictive control strategy is proposed to dispatch the industry park in real time with an objective to maximize the revenue. The proposed technology is tested using a real-world industrial electrolysis power system based upon Pennsylvania, Jersey, and Maryland (PJM) power market. Various scenarios are simulated to study the performance of the proposed approach to enable industry parks to provide ancillary service into the power market. The simulation results indicate that an industrial park with a capacity of 500 MW can provide up to 40 MW ancillary service for participation in the secondary frequency regulation. The proposed strategy is demonstrated to be capable of maintaining the economic and secure operation of the industrial park while satisfying performance requirements from the real world regulation market
Impact Assessment of Hypothesized Cyberattacks on Interconnected Bulk Power Systems
The first-ever Ukraine cyberattack on power grid has proven its devastation
by hacking into their critical cyber assets. With administrative privileges
accessing substation networks/local control centers, one intelligent way of
coordinated cyberattacks is to execute a series of disruptive switching
executions on multiple substations using compromised supervisory control and
data acquisition (SCADA) systems. These actions can cause significant impacts
to an interconnected power grid. Unlike the previous power blackouts, such
high-impact initiating events can aggravate operating conditions, initiating
instability that may lead to system-wide cascading failure. A systemic
evaluation of "nightmare" scenarios is highly desirable for asset owners to
manage and prioritize the maintenance and investment in protecting their
cyberinfrastructure. This survey paper is a conceptual expansion of real-time
monitoring, anomaly detection, impact analyses, and mitigation (RAIM) framework
that emphasizes on the resulting impacts, both on steady-state and dynamic
aspects of power system stability. Hypothetically, we associate the
combinatorial analyses of steady state on substations/components outages and
dynamics of the sequential switching orders as part of the permutation. The
expanded framework includes (1) critical/noncritical combination verification,
(2) cascade confirmation, and (3) combination re-evaluation. This paper ends
with a discussion of the open issues for metrics and future design pertaining
the impact quantification of cyber-related contingencies
On Validating an Astrophysical Simulation Code
We present a case study of validating an astrophysical simulation code. Our
study focuses on validating FLASH, a parallel, adaptive-mesh hydrodynamics code
for studying the compressible, reactive flows found in many astrophysical
environments. We describe the astrophysics problems of interest and the
challenges associated with simulating these problems. We describe methodology
and discuss solutions to difficulties encountered in verification and
validation. We describe verification tests regularly administered to the code,
present the results of new verification tests, and outline a method for testing
general equations of state. We present the results of two validation tests in
which we compared simulations to experimental data. The first is of a
laser-driven shock propagating through a multi-layer target, a configuration
subject to both Rayleigh-Taylor and Richtmyer-Meshkov instabilities. The second
test is a classic Rayleigh-Taylor instability, where a heavy fluid is supported
against the force of gravity by a light fluid. Our simulations of the
multi-layer target experiments showed good agreement with the experimental
results, but our simulations of the Rayleigh-Taylor instability did not agree
well with the experimental results. We discuss our findings and present results
of additional simulations undertaken to further investigate the Rayleigh-Taylor
instability.Comment: 76 pages, 26 figures (3 color), Accepted for publication in the ApJ
- âŠ