328,301 research outputs found

    Simulation to reallocate supply to committed orders under shortage

    Full text link
    [EN] This article aims to deal with the reallocating supply problem in both its real and planned contexts, to orders that result from the order promising process under shortage. To this end, we propose a system dynamics-based simulation model to facilitate modelling for order managers, and to provide a graphic support tool to understand the process and to make decisions. The basis of the simulation model's structure is a mixed-integer linear programming approach that intends to maximise profits by considering the possibility of making partial and delayed deliveries. To illustrate this, we consider a real-world problem from the ceramic sector that contemplates 35 orders. We obtained a solution by a mathematical programming model and a simulation model. The results show the simulation model's capacity to obtain near-optimum results, and to provide a simulated history of the system."This is an Author's Accepted Manuscript of an article published in Esteso, Ana, Josefa Mula, Francisco Campuzano-Bolarín, MME Alemany Diaz, and Angel Ortiz. 2018. Simulation to Reallocate Supply to Committed Orders under Shortage. International Journal of Production Research 57 (5). Informa UK Limited: 1552 70. doi:10.1080/00207543.2018.1493239, available online at: https://www.tandfonline.com/doi/full/10.1080/00207543.2018.1493239"Esteso, A.; Mula, J.; Campuzano-Bolarín, F.; Alemany Díaz, MDM.; Ortiz Bas, Á. (2019). Simulation to reallocate supply to committed orders under shortage. International Journal of Production Research. 57(5):1552-1570. https://doi.org/10.1080/00207543.2018.1493239S15521570575Alarcón, F., Alemany, M. M. E., Lario, F. C., & Oltra, R. F. (2011). La falta de homogeneidad del producto (FHP) en las empresas cerámicas y su impacto en la reasignación del inventario. Boletín de la Sociedad Española de Cerámica y Vidrio, 50(1), 49-58. doi:10.3989/cyv.072011Alemany, M. M. E., Alarcón, F., Oltra, R. F., & Lario, F. C. (2013). Reasignación óptima del inventario a pedidos en empresas cerámicas caracterizadas por la falta de homogeneidad en el producto (FHP). Boletín de la Sociedad Española de Cerámica y Vidrio, 52(1), 31-41. doi:10.3989/cyv.42013Alemany, M. M. E., Grillo, H., Ortiz, A., & Fuertes-Miquel, V. S. (2015). A fuzzy model for shortage planning under uncertainty due to lack of homogeneity in planned production lots. Applied Mathematical Modelling, 39(15), 4463-4481. doi:10.1016/j.apm.2014.12.057Alemany, M. M. E., Lario, F.-C., Ortiz, A., & Gómez, F. (2013). Available-To-Promise modeling for multi-plant manufacturing characterized by lack of homogeneity in the product: An illustration of a ceramic case. Applied Mathematical Modelling, 37(5), 3380-3398. doi:10.1016/j.apm.2012.07.022ALEMANY, M. M. E., A., A., BOZA, A., & FUERTES-MIQUEL, V. S. (2015). A MODEL-DRIVEN DECISION SUPPORT SYSTEM FOR REALLOCATION OF SUPPLY TO ORDERS UNDER UNCERTAINTY IN CERAMIC COMPANIES. Technological and Economic Development of Economy, 21(4), 596-625. doi:10.3846/20294913.2015.1055613Boza, A., Alemany, M. M. E., Alarcón, F., & Cuenca, L. (2013). A model-driven DSS architecture for delivery management in collaborative supply chains with lack of homogeneity in products. Production Planning & Control, 25(8), 650-661. doi:10.1080/09537287.2013.798085Campuzano-Bolarín, F., Mula, J., & Peidro, D. (2013). An extension to fuzzy estimations and system dynamics for improving supply chains. International Journal of Production Research, 51(10), 3156-3166. doi:10.1080/00207543.2012.760854Framinan, J. M., & Leisten, R. (2009). Available-to-promise (ATP) systems: a classification and framework for analysis. International Journal of Production Research, 48(11), 3079-3103. doi:10.1080/00207540902810544Georgiadis, P., & Michaloudis, C. (2012). Real-time production planning and control system for job-shop manufacturing: A system dynamics analysis. European Journal of Operational Research, 216(1), 94-104. doi:10.1016/j.ejor.2011.07.022Georgiadis, P., & Politou, A. (2013). Dynamic Drum-Buffer-Rope approach for production planning and control in capacitated flow-shop manufacturing systems. Computers & Industrial Engineering, 65(4), 689-703. doi:10.1016/j.cie.2013.04.013Grillo, H., Alemany, M. M. E., & Ortiz, A. (2016). A review of mathematical models for supporting the order promising process under Lack of Homogeneity in Product and other sources of uncertainty. Computers & Industrial Engineering, 91, 239-261. doi:10.1016/j.cie.2015.11.013Grillo, H., Alemany, M. M. E., Ortiz, A., & Mula, J. (2017). A Fuzzy Order Promising Model With Non-Uniform Finished Goods. International Journal of Fuzzy Systems, 20(1), 187-208. doi:10.1007/s40815-017-0317-yJeon, S. M., & Kim, G. (2016). A survey of simulation modeling techniques in production planning and control (PPC). Production Planning & Control, 27(5), 360-377. doi:10.1080/09537287.2015.1128010Mula, J., Campuzano-Bolarin, F., Díaz-Madroñero, M., & Carpio, K. M. (2013). A system dynamics model for the supply chain procurement transport problem: comparing spreadsheets, fuzzy programming and simulation approaches. International Journal of Production Research, 51(13), 4087-4104. doi:10.1080/00207543.2013.774487Olhager, J. (2003). Strategic positioning of the order penetration point. International Journal of Production Economics, 85(3), 319-329. doi:10.1016/s0925-5273(03)00119-1Tako, A. A., & Robinson, S. (2012). The application of discrete event simulation and system dynamics in the logistics and supply chain context. Decision Support Systems, 52(4), 802-815. doi:10.1016/j.dss.2011.11.01

    The boomerang returns? Accounting for the impact of uncertainties on the dynamics of remanufacturing systems

    Get PDF
    Recent years have witnessed companies abandon traditional open-loop supply chain structures in favour of closed-loop variants, in a bid to mitigate environmental impacts and exploit economic opportunities. Central to the closed-loop paradigm is remanufacturing: the restoration of used products to useful life. While this operational model has huge potential to extend product life-cycles, the collection and recovery processes diminish the effectiveness of existing control mechanisms for open-loop systems. We systematically review the literature in the field of closed-loop supply chain dynamics, which explores the time-varying interactions of material and information flows in the different elements of remanufacturing supply chains. We supplement this with further reviews of what we call the three ‘pillars’ of such systems, i.e. forecasting, collection, and inventory and production control. This provides us with an interdisciplinary lens to investigate how a ‘boomerang’ effect (i.e. sale, consumption, and return processes) impacts on the behaviour of the closed-loop system and to understand how it can be controlled. To facilitate this, we contrast closed-loop supply chain dynamics research to the well-developed research in each pillar; explore how different disciplines have accommodated the supply, process, demand, and control uncertainties; and provide insights for future research on the dynamics of remanufacturing systems

    Towards an integrated perspective on fleet asset management: engineering and governance considerations

    Get PDF
    The traditional engineering perspective on asset management concentrates on the operational performance the assets. This perspective aims at managing assets through their life-cycle, from technical specification, to acquisition, operation including maintenance, and disposal. However, the engineering perspective often takes for granted organizational-level factors. For example, a focus on performance at the asset level may lead to ignore performance measures at the business unit level. The governance perspective on asset management usually concentrates on organizational factors, and measures performance in financial terms. In doing so, the governance perspective tends to ignore the engineering considerations required for optimal asset performance. These two perspectives often take each other for granted. However experience demonstrates that an exclusive focus on one or the other may lead to sub-optimal performance. For example, the two perspectives have different time frames: engineering considers the long term asset life-cycle whereas the organizational time frame is based on a yearly financial calendar. Asset fleets provide a relevant and important context to investigate the interaction between engineering and governance views on asset management as fleets have distributed system characteristics. In this project we investigate how engineering and governance perspectives can be reconciled and integrated to enable optimal asset and organizational performance in the context of asset fleets

    Principles of forming a modern accounting and analytical model of commercial organization in digital economy

    Get PDF
    Purpose: The article presents basic methodological approaches to the creation of a new model of forming and functioning of the accounting and analytical system to meet the information needs of internal and external stakeholders of organizations. Design/Approach/Methodology: Substantiation of the principles of building a system for accounting and analytical information management that meets current conditions for the business functioning using modern hardware and software. Findings: The developed model of cascade functioning of organization’s information support system optimizes the structure and content of accounting and analytical modules, contributes to the effective implementation of management functions, timely control and rapid response to the impact of negative factors. Practical implications: The principles of information flow management system constructing formulated in the article contribute to optimization of expenses for organization of accounting and analytical functions, improvement of quality of financial and non-financial reporting, realistic assessment and forecasting of business efficiency. Originality/Value: The proposed new model for constructing an accounting and analytical information base allows to improve the procedures of collection, processing, storage and disclosure of financial and non-financial information, to create a balanced structure of the database on the basis of cascade digitization of primary and derived data.peer-reviewe

    Optimal greenhouse cultivation control: survey and perspectives

    Get PDF
    Abstract: A survey is presented of the literature on greenhouse climate control, positioning the various solutions and paradigms in the framework of optimal control. A separation of timescales allows the separation of the economic optimal control problem of greenhouse cultivation into an off-line problem at the tactical level, and an on-line problem at the operational level. This paradigm is used to classify the literature into three categories: focus on operational control, focus on the tactical level, and truly integrated control. Integrated optimal control warrants the best economical result, and provides a systematic way to design control systems for the innovative greenhouses of the future. Research issues and perspectives are listed as well
    corecore