8,003 research outputs found

    Multi-Information Source Fusion and Optimization to Realize ICME: Application to Dual Phase Materials

    Get PDF
    Integrated Computational Materials Engineering (ICME) calls for the integration of computational tools into the materials and parts development cycle, while the Materials Genome Initiative (MGI) calls for the acceleration of the materials development cycle through the combination of experiments, simulation, and data. As they stand, both ICME and MGI do not prescribe how to achieve the necessary tool integration or how to efficiently exploit the computational tools, in combination with experiments, to accelerate the development of new materials and materials systems. This paper addresses the first issue by putting forward a framework for the fusion of information that exploits correlations among sources/models and between the sources and `ground truth'. The second issue is addressed through a multi-information source optimization framework that identifies, given current knowledge, the next best information source to query and where in the input space to query it via a novel value-gradient policy. The querying decision takes into account the ability to learn correlations between information sources, the resource cost of querying an information source, and what a query is expected to provide in terms of improvement over the current state. The framework is demonstrated on the optimization of a dual-phase steel to maximize its strength-normalized strain hardening rate. The ground truth is represented by a microstructure-based finite element model while three low fidelity information sources---i.e. reduced order models---based on different homogenization assumptions---isostrain, isostress and isowork---are used to efficiently and optimally query the materials design space.Comment: 19 pages, 11 figures, 5 table

    Optimal Battery Energy Storage Placement for Transient Voltage Stability Enhancement

    Full text link
    A placement problem for multiple Battery Energy Storage System (BESS) units is formulated towards power system transient voltage stability enhancement in this paper. The problem is solved by the Cross-Entropy (CE) optimization method. A simulation-based approach is adopted to incorporate higher-order dynamics and nonlinearities of generators and loads. The objective is to maximize the voltage stability index, which is set up based on certain grid-codes. Formulations of the optimization problem are then discussed. Finally, the proposed approach is implemented in MATLAB/DIgSILENT and tested on the New England 39-Bus system. Results indicate that installing BESS units at the optimized location can alleviate transient voltage instability issue compared with the original system with no BESS. The CE placement algorithm is also compared with the classic PSO (Particle Swarm Optimization) method, and its superiority is demonstrated in terms of fewer iterations for convergence with better solution qualities.Comment: This paper has been accepted by the 2019 IEEE PES General Meeting at Atlanta, GA in August 201
    • …
    corecore