6,922 research outputs found

    An effective hybrid ant lion algorithm to minimize mean tardiness on permutation flow shop scheduling problem

    Get PDF
    This article aimed to develop an improved Ant Lion algorithm. The objective function was to minimize the mean tardiness on the flow shop scheduling problem with a focus on the permutation flow shop problem (PFSP). The Hybrid Ant Lion Optimization Algorithm (HALO) with local strategy was proposed, and from the total search of the agent, the NEH-EDD algorithm was applied. Moreover, the diversity of the nominee schedule was improved through the use of swap mutation, flip, and slide to determine the best solution in each iteration. Finally, the HALO was compared with some algorithms, while some numerical experiments were used to show the performances of the proposed algorithms. It is important to note that comparative analysis has been previously conducted using the nine variations of the PFSSP problem, and the HALO obtained was compared to other algorithms based on numerical experiments

    A computational evaluation of constructive and improvement heuristics for the blocking flow shop to minimize total flowtime

    Get PDF
    This paper focuses on the blocking flow shop scheduling problem with the objective of total flowtime minimisation. This problem assumes that there are no buffers between machines and, due to its application to many manufacturing sectors, it is receiving a growing attention by researchers during the last years. Since the problem is NP-hard, a large number of heuristics have been proposed to provide good solutions with reasonable computational times. In this paper, we conduct a comprehensive evaluation of the available heuristics for the problem and for related problems, resulting in the implementation and testing of a total of 35 heuristics. Furthermore, we propose an efficient constructive heuristic which successfully combines a pool of partial sequences in parallel, using a beam-search-based approach. The computational experiments show the excellent performance of the proposed heuristic as compared to the best-so-far algorithms for the problem, both in terms of quality of the solutions and of computational requirements. In fact, despite being a relative fast constructive heuristic, new best upper bounds have been found for more than 27% of Taillard’s instances.Ministerio de Ciencia e Innovación DPI2013-44461-P/DP

    New efficient constructive heuristics for the hybrid flowshop to minimise makespan: A computational evaluation of heuristics

    Get PDF
    This paper addresses the hybrid flow shop scheduling problem to minimise makespan, a well-known scheduling problem for which many constructive heuristics have been proposed in the literature. Nevertheless, the state of the art is not clear due to partial or non homogeneous comparisons. In this paper, we review these heuristics and perform a comprehensive computational evaluation to determine which are the most efficient ones. A total of 20 heuristics are implemented and compared in this study. In addition, we propose four new heuristics for the problem. Firstly, two memory-based constructive heuristics are proposed, where a sequence is constructed by inserting jobs one by one in a partial sequence. The most promising insertions tested are kept in a list. However, in contrast to the Tabu search, these insertions are repeated in future iterations instead of forbidding them. Secondly, we propose two constructive heuristics based on Johnson’s algorithm for the permutation flowshop scheduling problem. The computational results carried out on an extensive testbed show that the new proposals outperform the existing heuristics.Ministerio de Ciencia e Innovación DPI2016-80750-

    Using real-time information to reschedule jobs in a flowshop with variable processing times

    Get PDF
    Versión revisada. Embargo 36 mesesIn a time where detailed, instantaneous and accurate information on shop-floor status is becoming available in many manufacturing companies due to Information Technologies initiatives such as Smart Factory or Industry 4.0, a question arises regarding when and how this data can be used to improve scheduling decisions. While it is acknowledged that a continuous rescheduling based on the updated information may be beneficial as it serves to adapt the schedule to unplanned events, this rather general intuition has not been supported by a thorough experimentation, particularly for multi-stage manufacturing systems where such continuous rescheduling may introduce a high degree of nervousness in the system and deteriorates its performance. In order to study this research problem, in this paper we investigate how real-time information on the completion times of the jobs in a flowshop with variable processing times can be used to reschedule the jobs. In an exhaustive computational experience, we show that rescheduling policies pay off as long as the variability of the processing times is not very high, and only if the initially generated schedule is of good quality. Furthermore, we propose several rescheduling policies to improve the performance of continuous rescheduling while greatly reducing the frequency of rescheduling. One of these policies, based on the concept of critical path of a flowshop, outperforms the rest of policies for a wide range of scenarios.Ministerio de Ciencia e Innovación DPI2016-80750-

    Iterated-greedy-based algorithms with beam search initialization for the permutation flowshop to minimize total tardiness

    Get PDF
    The permutation flow shop scheduling problem is one of the most studied operations research related problems. Literally, hundreds of exact and approximate algorithms have been proposed to optimise several objective functions. In this paper we address the total tardiness criterion, which is aimed towards the satisfaction of customers in a make-to-order scenario. Although several approximate algorithms have been proposed for this problem in the literature, recent contributions for related problems suggest that there is room for improving the current available algorithms. Thus, our contribution is twofold: First, we propose a fast beam-search-based constructive heuristic that estimates the quality of partial sequences without a complete evaluation of their objective function. Second, using this constructive heuristic as initial solution, eight variations of an iterated-greedy-based algorithm are proposed. A comprehensive computational evaluation is performed to establish the efficiency of our proposals against the existing heuristics and metaheuristics for the problem.Ministerio de Ciencia e Innovación DPI2013-44461-PMinisterio de Ciencia e Innovación DPI2016-80750-

    Efficient heuristics for the hybrid flow shop scheduling problem with missing operations

    Get PDF
    In this paper, we address the hybrid flowshop scheduling problem for makespan minimisation. More specifically, we are interested in the special case where there are missing operations, i.e. some stages are skipped, a condition inspired in a realistic problem found in a plastic manufacturer. The main contribution of our paper is twofold. On the one hand we carry out a computational analysis to study the hardness of the hybrid flowshop scheduling problem with missing operations as compared to the classical hybrid flowshop problem. On the other hand, we propose a set of heuristics that captures some special features of the missing operations and compare these algorithms with already existing heuristics for the classical hybrid flowshop, and for the hybrid flowshop problem with missing operations. The extensive computational experience carried out shows that our proposal outperforms existing methods for the problem, indicating that it is possible to improve the makespan by interacting with the jobs with missing operations.Ministerio de Ciencia e Innovación DPI2016-80750-

    NEH-based heuristics for the permutation flowshop scheduling problem to minimize total tardiness

    Get PDF
    Since Johnson׳s seminal paper in 1954, scheduling jobs in a permutation flowshop has been receiving the attention of hundreds of practitioners and researchers, being one of the most studied topics in the Operations Research literature. Among the different objectives that can be considered, minimising the total tardiness (i.e. the sum of the surplus of the completion time of each job over its due date) is regarded as a key objective for manufacturing companies, as it entails the fulfilment of the due dates committed to customers. Since this problem is known to be NP-hard, most research has focused on proposing approximate procedures to solve it in reasonable computation times. Particularly, several constructive heuristics have been proposed, with NEHedd being the most efficient one, serving also to provide an initial solution for more elaborate approximate procedures. In this paper, we first analyse in detail the decision problem depending on the generation of the due dates of the jobs, and discuss the similarities with different related decision problems. In addition, for the most characteristic tardiness scenario, the analysis shows that a huge number of ties appear during the construction of the solutions done by the NEHedd heuristic, and that wisely breaking the ties greatly influences the quality of the final solution. Since no tie-breaking mechanism has been designed for this heuristic up to now, we propose several mechanisms that are exhaustively tested. The results show that some of them outperform the original NEHedd by about 25% while keeping the same computational requirements.Ministerio de Ciencia e Innovación DPI2010-15573/DPIMinisterio de Ciencia e Innovación DPI2013-44461-P/DP

    Flow shop scheduling with earliness, tardiness and intermediate inventory holding costs

    Get PDF
    We consider the problem of scheduling customer orders in a flow shop with the objective of minimizing the sum of tardiness, earliness (finished goods inventory holding) and intermediate (work-in-process) inventory holding costs. We formulate this problem as an integer program, and based on approximate solutions to two di erent, but closely related, Dantzig-Wolfe reformulations, we develop heuristics to minimize the total cost. We exploit the duality between Dantzig-Wolfe reformulation and Lagrangian relaxation to enhance our heuristics. This combined approach enables us to develop two di erent lower bounds on the optimal integer solution, together with intuitive approaches for obtaining near-optimal feasible integer solutions. To the best of our knowledge, this is the first paper that applies column generation to a scheduling problem with di erent types of strongly NP-hard pricing problems which are solved heuristically. The computational study demonstrates that our algorithms have a significant speed advantage over alternate methods, yield good lower bounds, and generate near-optimal feasible integer solutions for problem instances with many machines and a realistically large number of jobs
    • …