    Unit commitment with valve-point loading effect

    Full text link
    Valve-point loading affects the input-output characteristics of generating units, bringing the fuel costs nonlinear and nonsmooth. This has been considered in the solution of load dispatch problems, but not in the planning phase of unit commitment. This paper presents a mathematical optimization model for the thermal unit commitment problem considering valve-point loading. The formulation is based on a careful linearization of the fuel cost function, which is modeled with great detail on power regions being used in the current solution, and roughly on other regions. A set of benchmark instances for this problem is used for analyzing the method, with recourse to a general-purpose mixed-integer optimization solver

    Contingency-Constrained Unit Commitment with Post-Contingency Corrective Recourse

    Full text link
    We consider the problem of minimizing costs in the generation unit commitment problem, a cornerstone in electric power system operations, while enforcing an N-k-e reliability criterion. This reliability criterion is a generalization of the well-known NN-kk criterion, and dictates that at least (1ej)(1-e_ j) fraction of the total system demand must be met following the failures of kk or fewer system components. We refer to this problem as the Contingency-Constrained Unit Commitment problem, or CCUC. We present a mixed-integer programming formulation of the CCUC that accounts for both transmission and generation element failures. We propose novel cutting plane algorithms that avoid the need to explicitly consider an exponential number of contingencies. Computational studies are performed on several IEEE test systems and a simplified model of the Western US interconnection network, which demonstrate the effectiveness of our proposed methods relative to current state-of-the-art

    A new methodology called dice game optimizer for capacitor placement in distribution systems

    Get PDF
    Purpose. Shunt capacitors are installed in power system for compensating reactive power. Therefore, feeder capacity releases, voltage profile improves and power loss reduces. However, determination optimal location and size of capacitors in distributionsystems is a complex optimization problem. In order to determine the optimum size and location of the capacitor, an objective function which is generally defined based on capacitor installation costs and power losses should be minimized According to operational limitations. This paper offers a newly developed metaheuristic technique, named dice game optimizerto determine optimal size and location of capacitors in a distribution network. Dice game optimizer is a game based optimization technique that is based on the rules of the dice game.Цель. Шунтирующие конденсаторы в энергосистеме устанавливаются для компенсации реактивной мощности. Следовательно, снижается емкость фидера, улучшается профиль напряжения и снижаются потери мощности. Однако определение оптимального местоположения и размера конденсаторов в системах распределения является сложной задачей оптимизации. Чтобы определить оптимальный размер и расположение конденсатора, целевую функцию, которая обычно определяется на основе затрат на установку конденсатора и потерь мощности, следует минимизировать в соответствии с эксплуатационными ограничениями. Данная статья предлагает недавно разработанный метаэвристический метод, называемый оптимизатором игры в кости, для определения оптимального размера и расположения конденсаторов в распределительной сети. Оптимизатор игры в кости – это игровой метод оптимизации, основанный на правилах игры в кости

    Reliability Constrained Unit Commitment Considering the Effect of DG and DR Program

    Get PDF
    Due to increase in energy prices at peak periods and increase in fuel cost, involving Distributed Generation (DG) and consumption management by Demand Response (DR) will be unavoidable options for optimal system operations. Also, with high penetration of DGs and DR programs into power system operation, the reliability criterion is taken into account as one of the most important concerns of system operators in management of power system. In this paper, a Reliability Constrained Unit Commitment (RCUC) at presence of time-based DR program and DGs integrated with conventional units is proposed and executed to reach a reliable and economic operation. Designated cost function has been minimized considering reliability constraint in prevailing UC formulation. The UC scheduling is accomplished in short-term so that the reliability is maintained in acceptable level. Because of complex nature of RCUC problem and full AC load flow constraints, the hybrid algorithm included Simulated Annealing (SA) and Binary Particle Swarm Optimization (BPSO) has been proposed to optimize the problem. Numerical results demonstrate the effectiveness of the proposed method and considerable efficacy of the time-based DR program in reducing operational costs by implementing it on IEEE-RTS79

    Resolving forward-reverse logistics multi-period model using evolutionary algorithms

    Get PDF
    © 2016 Elsevier Ltd In the changing competitive landscape and with growing environmental awareness, reverse logistics issues have become prominent in manufacturing organizations. As a result there is an increasing focus on green aspects of the supply chain to reduce environmental impacts and ensure environmental efficiency. This is largely driven by changes made in government rules and regulations with which organizations must comply in order to successfully operate in different regions of the world. Therefore, manufacturing organizations are striving hard to implement environmentally efficient supply chains while simultaneously maximizing their profit to compete in the market. To address the issue, this research studies a forward-reverse logistics model. This paper puts forward a model of a multi-period, multi-echelon, vehicle routing, forward-reverse logistics system. The network considered in the model assumes a fixed number of suppliers, facilities, distributors, customer zones, disassembly locations, re-distributors and second customer zones. The demand levels at customer zones are assumed to be deterministic. The objective of the paper is to maximize the total expected profit and also to obtain an efficient route for the vehicle corresponding to an optimal/near optimal solution. The proposed model is resolved using Artificial Immune System (AIS) and Particle Swarm Optimization (PSO) algorithms. The findings show that for the considered model, AIS works better than the PSO. This information is important for a manufacturing organization engaged in reverse logistics programs and in running units efficiently. This paper also contributes to the limited literature on reverse logistics that considers costs and profit as well as vehicle route management

    Creative criteria to develop product design in life skills classroom

    Get PDF
    In the era of 21 st century, creative students are the national asset that can contribute to the development of society, nation and economic growth. Applying creative criteria in life skills subject, help in preparing students with skilled workforce, professionals, entrepreneurs and product designers that in line with the demand of the current technology. There is a gap where students try to copy or replicate the product design available around them, and these restricted them to think creatively in producing innovative product design. Therefore this study is to investigate problems faced by students in developing product design in life skills subject and secondly is to investigate how the process of developing the product design will contribute to student's creativity in producing a product. To date, this study will employ interview and observation method in order to gather rich input from the participants. In this study, experts who have more than five years of experiences in product design in Vocational Colleges involved for the interview sessions. In addition, the observation sessions also proceeded with students who took the life skills subject by monitoring their design project progress as to identify criteria that contribute to the discrepancy in developing product design in the classroom. At this stage, at about ten participants involved in this study and most of the participants were students from Vocational Colleges. Findings showed that, there were student self factors that restricted the students to be creative in designing a product in life skills subject. In addition by having conducive classroom environment and supported by guidance from the teachers, intensive discussions, active brainstorming sessions, and interactive interactions were among the activities that help students to be creative and eventually nurturing the students to innovate their product design in the classroom