1,742 research outputs found

    Finding Optimum Resource Allocation to Optimizing Construction Project Time/Cost through Combination of Artificial Agents CPM and GA

    Get PDF
    In order to plan a construction project, computer simulations are frequently used to predict the performance of the operations through simulating the process flows and resource selection procedure. However, for finding the optimum resource allocation of the construction activities, all possible combinations must be tested through simulation study. If the number of activities and allocated resources are high, the numbers of these combinations become too large, then this process would not be economical task to do. Therefore, simulation analysis is no longer considered through an optimization technique. Using of Genetic Algorithms (GA) is one of the simple and widely used tools for optimizing heavy intensive engineering problems which can covers various areas of research. With keeping this in mind, this study presented a new hybrid model which integrated agent based modeling with CPM and GA to find out the best resource allocation combination for the construction project’s activities. Based on the results obtained, this new hybrid model can eectively find the optimum resource allocation with respect to time, cost, or any combination of time-cost

    Approximate Algorithms for the Combined arrival-Departure Aircraft Sequencing and Reactive Scheduling Problems on Multiple Runways

    Get PDF
    The problem addressed in this dissertation is the Aircraft Sequencing Problem (ASP) in which a schedule must be developed to determine the assignment of each aircraft to a runway, the appropriate sequence of aircraft on each runway, and their departing or landing times. The dissertation examines the ASP over multiple runways, under mixed mode operations with the objective of minimizing the total weighted tardiness of aircraft landings and departures simultaneously. To prevent the dangers associated with wake-vortex effects, separation times enforced by Aviation Administrations (e.g., FAA) are considered, adding another level of complexity given that such times are sequence-dependent. Due to the problem being NP-hard, it is computationally difficult to solve large scale instances in a reasonable amount of time. Therefore, three greedy algorithms, namely the Adapted Apparent Tardiness Cost with Separation and Ready Times (AATCSR), the Earliest Ready Time (ERT) and the Fast Priority Index (FPI) are proposed. Moreover, metaheuristics including Simulated Annealing (SA) and the Metaheuristic for Randomized Priority Search (Meta-RaPS) are introduced to improve solutions initially constructed by the proposed greedy algorithms. The performance (solution quality and computational time) of the various algorithms is compared to the optimal solutions and to each other. The dissertation also addresses the Aircraft Reactive Scheduling Problem (ARSP) as air traffic systems frequently encounter various disruptions due to unexpected events such as inclement weather, aircraft failures or personnel shortages rendering the initial plan suboptimal or even obsolete in some cases. This research considers disruptions including the arrival of new aircraft, flight cancellations and aircraft delays. ARSP is formulated as a multi-objective optimization problem in which both the schedule\u27s quality and stability are of interest. The objectives consist of the total weighted start times (solution quality), total weighted start time deviation, and total weighted runway deviation (instability measures). Repair and complete regeneration approximate algorithms are developed for each type of disruptive events. The algorithms are tested against difficult benchmark problems and the solutions are compared to optimal solutions in terms of solution quality, schedule stability and computational time

    The falling tide algorithm: A new multi-objective approach for complex workforce scheduling

    Get PDF
    We present a hybrid approach of goal programming and meta-heuristic search to find compromise solutions for a difficult employee scheduling problem, i.e. nurse rostering with many hard and soft constraints. By employing a goal programming model with different parameter settings in its objective function, we can easily obtain a coarse solution where only the system constraints (i.e. hard constraints) are satisfied and an ideal objective-value vector where each single goal (i.e. each soft constraint) reaches its optimal value. The coarse solution is generally unusable in practise, but it can act as an initial point for the subsequent meta-heuristic search to speed up the convergence. Also, the ideal objective-value vector is, of course, usually unachievable, but it can help a multi-criteria search method (i.e. compromise programming) to evaluate the fitness of obtained solutions more efficiently. By incorporating three distance metrics with changing weight vectors, we propose a new time-predefined meta-heuristic approach, which we call the falling tide algorithm, and apply it under a multi-objective framework to find various compromise solutions. By this approach, not only can we achieve a trade off between the computational time and the solution quality, but also we can achieve a trade off between the conflicting objectives to enable better decision-making
    • …
    corecore