833,809 research outputs found
Building information modeling (BIM) and green building index (GBI) assessment framework for non-residential new construction building (NRNC)
The global construction industry endorsed Building Information Modeling (BIM)
and its many advantages. However, despite this endorsement, BIM still failed to
attract Malaysian companies to use BIM in green building assessment, especially for
the assessment of Green Building Index (GBI), and maintain GBI certification during
building occupancy using BIM features. The main issue of utilizing BIM as a GBI
assessment tool is the applicability of BIM Tools to digitalize GBI credit by design
team, which results in the digitization of GBI criteria into BIM Model. This study
aims to identify common components related to the capability of BIM to digitalize
and assess GBI criteria. These components include BIM uses and tools and GBI
criteria and processes. This study applied quantitative and qualitative approaches to
collect data. The quantitative approach used questionnaires, which were distributed
to 900 GBI members, i.e. GBI certifiers and facilitators. The survey generated a
response rate of 32% during eight months of data collection. The results were
analyzed using SPSS and SmartPLS. Four model categories were identified, namely,
BIM uses, BIM tools, GBI criteria and GBI certification process. These categories
were used to assess the BIM–GBI framework. The results obtained from the
questionnaire showed that only 16 BIM uses must be included in the BIM execution
plan of the GBI project for assessment purposes. The results also showed that the
BIM tools present different levels of effect on the GBI criteria. The capability of
BIM to assess GBI could be stronger in the design assessment (DA) than in the
operation assessment, which supports the suggested BIM–GBI assessment
framework. The second data collection was conducted through a focus group
interview with BIM and GBI experts. Two interview sessions were conducted.
Results show that the assessment method has a significant correlation in the BIM–
GBI framework. The following categories were identified for the BIM assessment
framework: BIM uses, BIM tools, and control, which were based on the GBI criteria
for scoring and certification. Findings from the BIM and GBI assessment method
framework show that GBI credits can be digitalized using different BIM uses directly
and indirectly assessed by BIM tools for each GBI credit in both GBI assessment
process. Based on the qualitative result of this research showed that BIM can help the
design team to achieve 55% point in design assessment (DA) only and this helps the
building to achieve GBI certification in level 4 of certified rating. On the other hand,
45% points of GBI credits can be digitals in completion and verification assessment
(CVA). The framework provides a guide for the design team and facility
management in digitalizing and assessing GBI criteria using BIM application during
design assessment (DA) and completion and verification assessment (CVA) for new
nonresidential constructions. The framework also offers and provides insights that
will enable designers to understand the relationship between BIM and GBI criteria,
which will contribute to BIM integration in Stage 3 and automate GBI assessment for
the Malaysian construction industry
Garbled Protocols and Two-Round MPC from Bilinear Maps
In this paper, we initiate the study of \emph{garbled protocols} --- a generalization of Yao\u27s
garbled circuits construction to distributed protocols. More specifically, in a garbled protocol
construction, each party can independently generate a garbled protocol component along with pairs of input
labels. Additionally, it generates an encoding of its input. The evaluation procedure takes as input the set of all garbled protocol components and the labels corresponding to the input encodings of all parties and outputs the entire transcript of the distributed protocol.
We provide constructions for garbling arbitrary protocols based on standard
computational assumptions on bilinear maps (in the common random/reference string model). Next, using
garbled protocols we obtain a general compiler that compresses any arbitrary round multiparty secure
computation protocol into a two-round UC secure protocol. Previously,
two-round multiparty secure computation protocols were only known assuming witness encryption or learning-with errors. Benefiting from our generic approach we also obtain two-round protocols (i) for the setting of random access machines (RAM programs) while keeping the (amortized) communication and computational costs proportional to running times, (ii) making
only a black-box use of the underlying group,
eliminating the need for any expensive non-black-box group operations and (iii) satisfying semi-honest security in the plain model.
Our results are obtained by a simple but powerful extension of the non-interactive zero-knowledge proof system of
Groth, Ostrovsky and Sahai [Journal of ACM, 2012]
Designing a novel virtual collaborative environment to support collaboration in design review meetings
Project review meetings are part of the project management process and are organised to assess progress and resolve any design conflicts to avoid delays in construction. One of the key challenges during a project review meeting is to bring the stakeholders together and use this time effectively to address design issues as quickly as possible. At present, current technology solutions based on BIM or CAD are information-centric and do not allow project teams to collectively explore the design from a range of perspectives and brainstorm ideas when design conflicts are encountered. This paper presents a system architecture that can be used to support multi-functional team collaboration more effectively during such design review meetings. The proposed architecture illustrates how information-centric BIM or CAD systems can be made human- and team-centric to enhance team communication and problem solving. An implementation of the proposed system architecture has been tested for its utility, likability and usefulness during design review meetings. The evaluation results suggest that the collaboration platform has the potential to enhance collaboration among multi-functional teams
Software engineering and middleware: a roadmap (Invited talk)
The construction of a large class of distributed systems can be simplified by leveraging middleware, which is layered between network operating systems and application components. Middleware resolves heterogeneity and facilitates communication and coordination of distributed components. Existing middleware products enable software engineers to build systems that are distributed across a local-area network. State-of-the-art middleware research aims to push this boundary towards Internet-scale distribution, adaptive and reconfigurable middleware and middleware for dependable and wireless systems. The challenge for software engineering research is to devise notations, techniques, methods and tools for distributed system construction that systematically build and exploit the capabilities that middleware deliver
Integrating Distributed Sources of Information for Construction Cost Estimating using Semantic Web and Semantic Web Service technologies
A construction project requires collaboration of several organizations such as owner, designer, contractor, and material supplier organizations. These organizations need to exchange information to enhance their teamwork. Understanding the information received from other organizations requires specialized human resources. Construction cost estimating is one of the processes that requires information from several sources including a building information model (BIM) created by designers, estimating assembly and work item information maintained by contractors, and construction material cost data provided by material suppliers. Currently, it is not easy to integrate the information necessary for cost estimating over the Internet. This paper discusses a new approach to construction cost estimating that uses Semantic Web technology. Semantic Web technology provides an infrastructure and a data modeling format that enables accessing, combining, and sharing information over the Internet in a machine processable format. The estimating approach presented in this paper relies on BIM, estimating knowledge, and construction material cost data expressed in a web ontology language. The approach presented in this paper makes the various sources of estimating data accessible as Simple Protocol and Resource Description Framework Query Language (SPARQL) endpoints or Semantic Web Services. We present an estimating application that integrates distributed information provided by project designers, contractors, and material suppliers for preparing cost estimates. The purpose of this paper is not to fully automate the estimating process but to streamline it by reducing human involvement in repetitive cost estimating activities
A Shared Ontology Approach to Semantic Representation of BIM Data
Architecture, engineering, construction and facility management (AEC-FM) projects involve a large number of participants that must exchange information and combine their knowledge for successful completion of a project. Currently, most of the AEC-FM domains store their information about a project in text documents or use XML, relational, or object-oriented formats that make information integration difficult. The AEC-FM industry is not taking advantage of the full potential of the Semantic Web for streamlining sharing, connecting, and combining information from different domains. The Semantic Web is designed to solve the information integration problem by creating a web of structured and connected data that can be processed by machines. It allows combining information from different sources with different underlying schemas distributed over the Internet. In the Semantic Web, all data instances and data schema are stored in a graph data store, which makes it easy to merge data from different sources. This paper presents a shared ontology approach to semantic representation of building information. The semantic representation of building information facilitates finding and integrating building information distributed in several knowledge bases. A case study demonstrates the development of a semantic based building design knowledge base
Can Component/Service-Based Systems Be Proved Correct?
Component-oriented and service-oriented approaches have gained a strong
enthusiasm in industries and academia with a particular interest for
service-oriented approaches. A component is a software entity with given
functionalities, made available by a provider, and used to build other
application within which it is integrated. The service concept and its use in
web-based application development have a huge impact on reuse practices.
Accordingly a considerable part of software architectures is influenced; these
architectures are moving towards service-oriented architectures. Therefore
applications (re)use services that are available elsewhere and many
applications interact, without knowing each other, using services available via
service servers and their published interfaces and functionalities. Industries
propose, through various consortium, languages, technologies and standards.
More academic works are also undertaken concerning semantics and formalisation
of components and service-based systems. We consider here both streams of works
in order to raise research concerns that will help in building quality
software. Are there new challenging problems with respect to service-based
software construction? Besides, what are the links and the advances compared to
distributed systems?Comment: 16 page
Developing a system for health and safety enhancement and automation in construction sites
The construction industry forms an important element within the economic activities and is known to be challenging and dangerous. Erroneously construction site accidents were accepted as unavoidable. The existing work health and safety protocols goals were not to cut risk but to provide risk assessment by understanding the types of risks associated with various activities and setting out rules and procedures to manage them and cut their impact. This study attempts a proactive approach to construction site health and safety by anticipating the hazards associated with a planned daily work activity and providing on site the relevant training and safety instructions. This was achieved by integrating the project’s digital design with site images processing and analysis. Digital image processing applies signal processing algorithms to images and videos resulting in extracting useful information from them. An essential and critical issue in the field of computer vision is the object’s recognition methods which should be capable of finding the partial occlusion of objects. Knowledge management systems archive and locate the required information and make it available to the relevant destination quickly and efficiently. It can also provide access to information in other construction sites and to the design team. This management system helps to save the gained experience and make it available to the project or other similar projects. The Building Information System was introduced as a system in which the objectives of this study can be incorporated leaving the door open to incorporate other project management activities. The possible solutions for the identified health and safety business problem were analysed in order to arrive at the best solution suitable to the objectives of the study. The end users ‘needs obtained from the distributed questionnaire and the project’s functional requirements were considered in order to create a model that will achieve their goals in an efficient manner. An activity diagram and a user case diagram based on the UML language were generated. Based on them a computerized model (CONSTRUCTION AUTOMATA) was developed to identify risks associated with specific work activities and provide the relevant safety instructions and training to mitigate them. The model automatically produces safety reports to record and serve as a knowledge management base for future reference thus eliminating possible human errors. The computer program was tested with available site images from an existing project and it proved to deliver its outputs according to its design. The developed model was then demonstrated to a selected group of relevant professionals and was seen to score well with ease of use mark of (6.17) and effectiveness as a health and safety tool mark of (6.37) out of a total mark of (10)
- …