154 research outputs found

    A GA-based fuzzy resource leveling optimization for helicopter maintenance activity

    Get PDF
    Abstract Genetic algorithm is one of the main heuristics that have been applied to scheduling problems in the last few decades. This paper presents a generalization of the genetic algorithm for solving project scheduling problem under time uncertainties within resource leveling technique. The generalization consists of handling fuzzy time parameter and fuzzy resource distribution instead of crisp ones. The provided fuzzy genetic algorithm is justified and applied to a real multi-project and multi-resources problem from the helicopter maintenance activity

    Project scheduling under uncertainty using fuzzy modelling and solving techniques

    Get PDF
    In the real world, projects are subject to numerous uncertainties at different levels of planning. Fuzzy project scheduling is one of the approaches that deal with uncertainties in project scheduling problem. In this paper, we provide a new technique that keeps uncertainty at all steps of the modelling and solving procedure by considering a fuzzy modelling of the workload inspired from the fuzzy/possibilistic approach. Based on this modelling, two project scheduling techniques, Resource Constrained Scheduling and Resource Leveling, are considered and generalized to handle fuzzy parameters. We refer to these problems as the Fuzzy Resource Constrained Project Scheduling Problem (FRCPSP) and the Fuzzy Resource Leveling Problem (FRLP). A Greedy Algorithm and a Genetic Algorithm are provided to solve FRCPSP and FRLP respectively, and are applied to civil helicopter maintenance within the framework of a French industrial project called Helimaintenance

    Fuzzy uncertainty modelling for project planning; application to helicopter maintenance

    Get PDF
    Maintenance is an activity of growing interest specially for critical systems. Particularly, aircraft maintenance costs are becoming an important issue in the aeronautical industry. Managing an aircraft maintenance center is a complex activity. One of the difficulties comes from the numerous uncertainties that affect the activity and disturb the plans at short and medium term. Based on a helicopter maintenance planning and scheduling problem, we study in this paper the integration of uncertainties into tactical and operational multiresource, multi-project planning (respectively Rough Cut Capacity Planning and Resource Constraint Project Scheduling Problem). Our main contributions are in modelling the periodic workload on tactical level considering uncertainties in macro-tasks work contents, and modelling the continuous workload on operational level considering uncertainties in tasks durations. We model uncertainties by a fuzzy/possibilistic approach instead of a stochastic approach since very limited data are available. We refer to the problems as the Fuzzy RoughCut Capacity Problem (FRCCP) and the Fuzzy Resource Constraint Project Scheduling Problem (RCPSP).We apply our models to helicopter maintenance activity within the frame of the Helimaintenance project, an industrial project approved by the French Aerospace Valley cluster which aims at building a center for civil helicopter maintenance

    The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review

    Get PDF
    Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe

    Simulation and optimization model for the construction of electrical substations

    Get PDF
    One of the most complex construction projects is electrical substations. An electrical substation is an auxiliary station of an electricity generation, transmission and distribution system where voltage is transformed from high to low or the reverse using transformers. Construction of electrical substation includes civil works and electromechanical works. The scope of civil works includes construction of several buildings/components divided into parallel and overlapped working phases that require variety of resources and are generally quite costly and consume a considerable amount of time. Therefore, construction of substations faces complicated time-cost-resource optimization problems. On another hand, the construction industry is turning out to be progressively competitive throughout the years, whereby the need to persistently discover approaches to enhance construction performance. To address the previously stated afflictions, this dissertation makes the underlying strides and introduces a simulation and optimization model for the execution processes of civil works for an electrical substation based on database excel file for input data entry. The input data include bill of quantities, maximum available resources, production rates, unit cost of resources and indirect cost. The model is built on Anylogic software using discrete event simulation method. The model is divided into three zones working in parallel to each other. Each zone includes a group of buildings related to the same construction area. Each zone-model describes the execution process schedule for each building in the zone, the time consumed, percentage of utilization of equipment and manpower crews, amount of materials consumed and total direct and indirect cost. The model is then optimized to mainly minimize the project duration using parameter variation experiment and genetic algorithm java code implemented using Anylogic platform. The model used allocated resource parameters as decision variables and available resources as constraints. The model is verified on real case studies in Egypt and sensitivity analysis studies are incorporated. The model is also validated using a real case study and proves its efficiency by attaining a reduction in model time units between simulation and optimization experiments of 10.25% and reduction in total cost of 4.7%. Also, by comparing the optimization results by the actual data of the case study, the model attains a reduction in time and cost by 13.6% and 6.3% respectively. An analysis to determine the effect of each resource on reduction in cost is also presented

    Continual improvement: A bibliography with indexes, 1992-1993

    Get PDF
    This bibliography lists 606 references to reports and journal articles entered into the NASA Scientific and Technical Information Database during 1992 to 1993. Topics cover the philosophy and history of Continual Improvement (CI), basic approaches and strategies for implementation, and lessons learned from public and private sector models. Entries are arranged according to the following categories: Leadership for Quality, Information and Analysis, Strategic Planning for CI, Human Resources Utilization, Management of Process Quality, Supplier Quality, Assessing Results, Customer Focus and Satisfaction, TQM Tools and Philosophies, and Applications. Indexes include subject, personal author, corporate source, contract number, report number, and accession number

    NASA SBIR abstracts of 1990 phase 1 projects

    Get PDF
    The research objectives of the 280 projects placed under contract in the National Aeronautics and Space Administration (NASA) 1990 Small Business Innovation Research (SBIR) Phase 1 program are described. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses in response to NASA's 1990 SBIR Phase 1 Program Solicitation. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 280, in order of its appearance in the body of the report. The document also includes Appendixes to provide additional information about the SBIR program and permit cross-reference in the 1990 Phase 1 projects by company name, location by state, principal investigator, NASA field center responsible for management of each project, and NASA contract number

    Aeronautical engineering: A continuing bibliography with indexes (supplement 202)

    Get PDF
    This bibliography lists 447 reports, articles and other documents introduced into the NASA scientific and technical information system in June 1986

    Aeronautical Engineering: A continuing bibliography with indexes, supplement 107

    Get PDF
    Reports, articles, and other documents introduced into the NASA scientific and technical information system in February 1979 are listed in this bibliography