Applying concepts of fuzzy cognitive mapping to model IT/IS investment evaluation factors
The justification process is a major concern for many organisations that are considering the adoption of Information Technology (IT) and Information Systems (IS), and is a barrier to its implementation. As a result, the competitive advantage of many companies is being put at risk because of management's inability to evaluate the holistic implication of adopting new technology, both in terms of on the benefit and cost portfolios. This paper identifies a number of well-known project appraisal techniques used in IT/IS investment justification. Furthermore, the concept of multivalent, or fuzzy logic, is used to demonstrate how inter-relationships can be modeled between key dimensions identified in the proposed conceptual evaluation model. This is highlighted using fuzzy cognitive mapping (FCM) as a technique to model each IT/IS evaluation factor (integrating strategic, tactical, operational and investment considerations). The use of an FCM is then shown to be as a complementary tool which can serve to highlight interdependencies between contributory justification factors
Recommended from our members
Knowledge dependencies in fuzzy information systems evaluation
Experience and research within the field of Information Systems Evaluation (ISE), has traditionally centered on providing tools and techniques for investment justification and appraisal, based upon explicit knowledge which encodes financial and other direct situational factors (such as accounting, costing and risk metrics). However, such approaches tend not to include additional causal interdependencies that are based upon tacit knowledge and are inherent within such a decision-making task. The authors show the results of applying a cognitive mapping approach, in the guise of a Fuzzy Cognitive Mapping (FCM) simulation, i.e. Fuzzy Information Systems Evaluation (F-ISE), in order to highlight the usefulness of applying such a technique. The authors highlight those contingent and necessary knowledge dependencies, in an exploratory sense, which relate to the investment appraisal decision-making task, in terms of the interplay between tacit and explicit knowledge, in this regard
Recommended from our members
A revised perspective on the evaluation of IT/IS investments using an evolutionary approach
On-going research into the evaluation of Information Technology (IT) / Information Systems (IS) projects has shown that aerospace and supply chain industries are needing to address the issue of effective project investment in order to gain technological and competitive advantage. The evaluative nature of the justification process requires a mapping of interrelated quantities to be optimised. Earlier work by the authors (Irani and Sharif 1997) has presented a theoretical functional model that describes these relationships in turn. By applying a fuzzy mapping to these variables, the optimisation of intangible relationships in the form of a Genetic Algorithm (GA) is proposed as a method for investment justification. This paper revises and reviews these key concepts and provides a recapitulation of this optimisation problem in terms of long-term strategy options and cost implications.
Glossary of terms : DC = Direct Costs, FA = Financial Appraisal, FR = Financial Risks, FUR = Functional Risks, HC = Human Costs, IC = Indirect Costs, IR = Infrastructural Risks, OB = Operational Benefits, OC = Organisational Costs, PB = Project Benefits, PC = Project Costs, RF = Risk Factor, SB = Strategic Benefits, SM = Strategic medium-term benefit, SR = Systemic Risks, TB = Tangible Benefits, TC = Tangible Costs, TL = project lead time, TR = Technological Risks, V= Project Value
Recommended from our members
Exploring fuzzy cognitive mapping for IS evaluation: A research note
Existing IS Evaluation (ISE) techniques tend to focus on modeling individuals, teams, organization, or systems, in relation to process and environmental boundaries. Whilst such approaches are noteworthy and of merit, they do not necessarily provide insights into those causal interdependencies that are inherent within decision-making task. As has been noted by the extant literature in the field, the ISE task is dependent upon many factors – the resulting outputs of which may be tangible or intangible. The implicit level of uncertainty associated with modeling such decision-making tasks and behaviors, are therefore difficult to comprehend and impart via wholly Quantitative and / or Qualitative analyses. The authors therefore present and propose supporting and on-going research into the application of Fuzzy Logic, in the guise of Fuzzy Cognitive Mapping (FCM) simulations, as a means to model tangible/intangible aspects of the ISE decision-making task. Such a Fuzzy Information Systems Evaluation (F-ISE) is shown via the application of the FCM technique, in terms of three models of investment appraisal that are aligned to an ISE task within a UK manufacturing organization. In doing so, it is anticipated that such a technique may be a useful addition to the plethora of ISE techniques available to both researcher and practitioner alike
Fuzzy investment decision support for brownfield redevelopment
Tato disertační práce se zaměřuje na problematiku investování a podporu rozhodování pomocí moderních metod. Zejména pokud jde o analýzu, hodnocení a výběr tzv. brownfieldů pro jejich redevelopment (revitalizaci). Cílem této práce je navrhnout univerzální metodu, která usnadní rozhodovací proces. Proces rozhodování je v praxi komplikován též velkým počet relevantních parametrů ovlivňujících konečné rozhodnutí. Navržená metoda je založena na využití fuzzy logiky, modelování, statistické analýzy, shlukové analýzy, teorie grafů a na sofistikovaných metodách sběru a zpracování informací. Nová metoda umožňuje zefektivnit proces analýzy a porovnávání alternativních investic a přesněji zpracovat velký objem informací. Ve výsledku tak bude zmenšen počet prvků množiny nejvhodnějších alternativních investic na základě hierarchie parametrů stanovených investorem.This dissertation focuses on decision making, investing and brownfield redevelopment. Especially on the analysis, evaluation and selection of previously used real estates suitable for commercial use. The objective of this dissertation is to design a method that facilitates the decision making process with many possible alternatives and large number of relevant parameters influencing the decision. The proposed method is based on the use of fuzzy logic, modeling, statistic analysis, cluster analysis, graph theory and sophisticated methods of information collection and processing. New method allows decision makers to process much larger amount of information and evaluate possible investment alternatives efficiently.
Recommended from our members
Theoretical optimisation of IT/IS investments: A research note
The justification of Information Technology (IT) is inherently fuzzy, both in theory and practice. The reason for this is due to the largely intangible dimensions of IT projects. In view of this, this research note presents the results of on-going research, in the application of Fuzzy Cognitive Mapping (FCM), as a tool to identify complex functional interrelationships associated with the justification of IT. This paper presents a theoretical functional model which describes these relationships, and by using an FCM, further interrelationships are developed in the context of justifying IT projects. A procedure which would address the optimisation of these intangible relationships in the form of a Genetic Algorithm (GA) is proposed as a process for Investment Justification
A rationale for some directions of the development of resource territories: the complex ''meso-level'' problem
The article presents an approach to the analysis and evaluation of integrated investment projects, which consist of infrastructure facilities and industrial clusters allocated to poorly developed areas rich in natural resources. This study shows the feasibility of a public-private partnership during the construction of infrastructure facilities in order to minimize the risks and maximize the benefits. The conceptual framework of the resulting approach is associated with the ideas and principles of «impact investing» («creation of shared values») and inclusive economic development. These are increasingly used worldwide, especially to accelerate the socio-economic development of backward countries and territories. The article presents an international experience and explains the relevance of best practices in Russia. The authors identified methodological problems associated with the application of traditional methods to the evaluation of economic effects of project investing under the conditions of high uncertainty. The authors explain why it is necessary to use models and methods (real options analysis and fuzzy cognitive models) that allow researchers to directly take into account the uncertainty and project risks. The novelty of the article is the methodological tools for evaluating the socio-economic efficiency of complex projects combining the development of infrastructure and minerals. The proposed approach was used to provide a rationale for a road construction project in the Berezovsky district of the Khanty-Mansi Autonomous Okrug. The authors showed opportunities to generate a set of institutional, organizational, and financial conditions under which the implementation of the project will be attractive to both investors and government and will bring socio-economic benefits to this territory. The proposed approach and tools can be used for a socio-economic strategic decision-making process to justify infrastructure projects in resource-rich regions.The theoretical and methodological results presented in the article were obtained during the research funded by the Russian Science Foundation (Project No. 14–18–02345)
Valuation of real estate investments through Fuzzy Logic
This paper aims to outline the application of Fuzzy Logic in real estate investment. In literature, there is a wide theoretical background on real estate investment decisions, but there has been a lack of empirical support in this regard. For this reason, the paper would fill the gap between theory and practice. The fuzzy logic system is adopted to evaluate the situations of a real estate market with imprecise and vague information. To highlight the applicability of the Possibility Theory, we proceeded to reconsider an example of property investment evaluation through fuzzy logic. The case study concerns the purchase of an office building. The results obtained with Fuzzy Logic have been also compared with those arising from a deterministic approach through the use of crisp numbers
Fuzzy Real Investment Valuation Model for Giga-Investments, and a Note on Giga-Investment Lifecycle and Valuation
Very large industrial real investments are different from financial investments and from small real investments, even so, their profitability is commonly valued with the same methods. A definition of a group of very large industrial real investments is made, by requiring three common characteristics. The decision support needs arising from these characteristics are discussed and a summary of existing methods to value and to provide decision support for large industrial investments is presented. A model built specifically to support investment decisions of very large industrial real investments and a numerical application of the model are presented. The model is discussed and commented. A note is made on an observation regarding the giga-investment lifecycle and its effect on giga-investment valuation.Large industrial investments; Profitability analysis; Fuzzy corporate finance; Capital Budgeting
A framework for the selection of the right nuclear power plant
Civil nuclear reactors are used for the production of electrical energy. In the nuclear industry vendors propose several nuclear reactor designs with a size from 35–45 MWe up to 1600–1700 MWe. The choice of the right design is a multidimensional problem since a utility has to include not only financial factors as levelised cost of electricity (LCOE) and internal rate of return (IRR), but also the so called “external factors” like the required spinning reserve, the impact on local industry and the social acceptability. Therefore it is necessary to balance advantages and disadvantages of each design during the entire life cycle of the plant, usually 40–60 years. In the scientific literature there are several techniques for solving this multidimensional problem. Unfortunately it does not seem possible to apply these methodologies as they are, since the problem is too complex and it is difficult to provide consistent and trustworthy expert judgments. This paper fills the gap, proposing a two-step framework to choosing the best nuclear reactor at the pre-feasibility study phase. The paper shows in detail how to use the methodology, comparing the choice of a small-medium reactor (SMR) with a large reactor (LR), characterised, according to the International Atomic Energy Agency (2006), by an electrical output respectively lower and higher than 700 MWe
- …