185,389 research outputs found

    Aligning a Service Provisioning Model of a Service-Oriented System with the ITIL v.3 Life Cycle

    Get PDF
    Bringing together the ICT and the business layer of a service-oriented system (SoS) remains a great challenge. Few papers tackle the management of SoS from the business and organizational point of view. One solution is to use the well-known ITIL v.3 framework. The latter enables to transform the organization into a service-oriented organizational which focuses on the value provided to the service customers. In this paper, we align the steps of the service provisioning model with the ITIL v.3 processes. The alignment proposed should help organizations and IT teams to integrate their ICT layer, represented by the SoS, and their business layer, represented by ITIL v.3. One main advantage of this combined use of ITIL and a SoS is the full service orientation of the company.Comment: This document is the technical work of a conference paper submitted to the International Conference on Exploring Service Science 1.5 (IESS 2015

    Scaling better together: The International Livestock Research Institute’s framework for scaling

    Get PDF

    Toward automated earned value tracking using 3D imaging tools

    Get PDF

    Design project planning, monitoring and re-planning through process simulation

    Get PDF
    Effective management of design schedules is a major concern in industry, since timely project delivery can have a significant influence on a company’s profitability. Based on insights gained through a case study of planning practice in aero-engine component design, this paper examines how task network simulation models can be deployed in a new way to support design process planning. Our method shows how simulation can be used to reconcile a description of design activities and information flows with project targets such as milestone delivery dates. It also shows how monitoring and re-planning can be supported using the non-ideal metrics which the case study revealed are used to monitor processes in practice. The approach is presented as a theoretical contribution which requires further work to implement and evaluate in practice

    Requirements for building information modeling based lean production management systems for construction

    Get PDF
    Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last Planner System™, called ‘KanBIM’, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face

    Cost Estimate Modeling of Transportation Management Plans for Highway Projects, Research Report 11-24

    Get PDF
    Highway rehabilitation and reconstruction projects frequently cause road congestion and increase safety concerns while limiting access for road users. State Transportation Agencies (STAs) are challenged to find safer and more efficient ways to renew deteriorating roadways in urban areas. To better address the work zone issues, the Federal Highway Administration published updates to the Work Zone Safety and Mobility Rule. All state and local governments receiving federal aid funding were required to comply with the provisions of the rule no later than October 12, 2007. One of the rule’s major elements is to develop and implement Transportation Management Plans (TMPs). Using well-developed TMP strategies, work zone safety and mobility can be enhanced while road user costs can be minimized. The cost of a TMP for a road project is generally considered a high-cost item and, therefore, must be quantified. However, no tools or systematic modeling methods are available to assist agency engineers with TMP cost estimating. This research included reviewing TMP reports for recent Caltrans projects regarding state-of-the-art TMP practices and input from the district TMP traffic engineers. The researchers collected Caltrans highway project data regarding TMP cost estimating. Then, using Construction Analysis for Pavement Rehabilitation Strategies (CA4PRS) software, the researchers performed case studies. Based on the CA4PRS outcomes of the case studies, a TMP strategy selection and cost estimate (STELCE) model for Caltrans highway projects was proposed. To validate the proposed model, the research demonstrated an application for selecting TMP strategies and estimating TMP costs. Regarding the model’s limitation, the proposed TMP STELCE model was developed based on Caltrans TMP practices and strategies. Therefore, other STAs might require adjustments and modifications, reflecting their TMP processes, before adopting this model. Finally, the authors recommended that a more detailed step-by-step TMP strategy selection and cost estimate process be included in the TMP guidelines to improve the accuracy of TMP cost estimates
    • …
    corecore