115,914 research outputs found
Cyber-Virtual Systems: Simulation, Validation & Visualization
We describe our ongoing work and view on simulation, validation and
visualization of cyber-physical systems in industrial automation during
development, operation and maintenance. System models may represent an existing
physical part - for example an existing robot installation - and a software
simulated part - for example a possible future extension. We call such systems
cyber-virtual systems.
In this paper, we present the existing VITELab infrastructure for
visualization tasks in industrial automation. The new methodology for
simulation and validation motivated in this paper integrates this
infrastructure. We are targeting scenarios, where industrial sites which may be
in remote locations are modeled and visualized from different sites anywhere in
the world.
Complementing the visualization work, here, we are also concentrating on
software modeling challenges related to cyber-virtual systems and simulation,
testing, validation and verification techniques for them. Software models of
industrial sites require behavioural models of the components of the industrial
sites such as models for tools, robots, workpieces and other machinery as well
as communication and sensor facilities. Furthermore, collaboration between
sites is an important goal of our work.Comment: Preprint, 9th International Conference on Evaluation of Novel
Approaches to Software Engineering (ENASE 2014
ASCR/HEP Exascale Requirements Review Report
This draft report summarizes and details the findings, results, and
recommendations derived from the ASCR/HEP Exascale Requirements Review meeting
held in June, 2015. The main conclusions are as follows. 1) Larger, more
capable computing and data facilities are needed to support HEP science goals
in all three frontiers: Energy, Intensity, and Cosmic. The expected scale of
the demand at the 2025 timescale is at least two orders of magnitude -- and in
some cases greater -- than that available currently. 2) The growth rate of data
produced by simulations is overwhelming the current ability, of both facilities
and researchers, to store and analyze it. Additional resources and new
techniques for data analysis are urgently needed. 3) Data rates and volumes
from HEP experimental facilities are also straining the ability to store and
analyze large and complex data volumes. Appropriately configured
leadership-class facilities can play a transformational role in enabling
scientific discovery from these datasets. 4) A close integration of HPC
simulation and data analysis will aid greatly in interpreting results from HEP
experiments. Such an integration will minimize data movement and facilitate
interdependent workflows. 5) Long-range planning between HEP and ASCR will be
required to meet HEP's research needs. To best use ASCR HPC resources the
experimental HEP program needs a) an established long-term plan for access to
ASCR computational and data resources, b) an ability to map workflows onto HPC
resources, c) the ability for ASCR facilities to accommodate workflows run by
collaborations that can have thousands of individual members, d) to transition
codes to the next-generation HPC platforms that will be available at ASCR
facilities, e) to build up and train a workforce capable of developing and
using simulations and analysis to support HEP scientific research on
next-generation systems.Comment: 77 pages, 13 Figures; draft report, subject to further revisio
Bibliometric Maps of BIM and BIM in Universities: A Comparative Analysis
Building Information Modeling (BIM) is increasingly important in the architecture and engineering fields, and especially in the field of sustainability through the study of energy. This study performs a bibliometric study analysis of BIM publications based on the Scopus database during the whole period from 2003 to 2018. The aim was to establish a comparison of bibliometric maps of the building information model and BIM in universities. The analyzed data included 4307 records produced by a total of 10,636 distinct authors from 314 institutions. Engineering and computer science were found to be the main scientific fields involved in BIM research. Architectural design are the central theme keywords, followed by information theory and construction industry. The final stage of the study focuses on the detection of clusters in which global research in this field is grouped. The main clusters found were those related to the BIM cycle, including construction management, documentation and analysis, architecture and design, construction/fabrication, and operation and maintenance (related to energy or sustainability). However, the clusters of the last phases such as demolition and renovation are not present, which indicates that this field suntil needs to be further developed and researched. With regard to the evolution of research, it has been observed how information technologies have been integrated over the entire spectrum of internet of things (IoT). A final key factor in the implementation of the BIM is its inclusion in the curriculum of technical careers related to areas of construction such as civil engineering or architecture
Dark energy with gravitational lens time delays
Strong lensing gravitational time delays are a powerful and cost effective
probe of dark energy. Recent studies have shown that a single lens can provide
a distance measurement with 6-7 % accuracy (including random and systematic
uncertainties), provided sufficient data are available to determine the time
delay and reconstruct the gravitational potential of the deflector.
Gravitational-time delays are a low redshift (z~0-2) probe and thus allow one
to break degeneracies in the interpretation of data from higher-redshift probes
like the cosmic microwave background in terms of the dark energy equation of
state. Current studies are limited by the size of the sample of known lensed
quasars, but this situation is about to change. Even in this decade, wide field
imaging surveys are likely to discover thousands of lensed quasars, enabling
the targeted study of ~100 of these systems and resulting in substantial gains
in the dark energy figure of merit. In the next decade, a further order of
magnitude improvement will be possible with the 10000 systems expected to be
detected and measured with LSST and Euclid. To fully exploit these gains, we
identify three priorities. First, support for the development of software
required for the analysis of the data. Second, in this decade, small robotic
telescopes (1-4m in diameter) dedicated to monitoring of lensed quasars will
transform the field by delivering accurate time delays for ~100 systems. Third,
in the 2020's, LSST will deliver 1000's of time delays; the bottleneck will
instead be the aquisition and analysis of high resolution imaging follow-up.
Thus, the top priority for the next decade is to support fast high resolution
imaging capabilities, such as those enabled by the James Webb Space Telescope
and next generation adaptive optics systems on large ground based telescopes.Comment: White paper submitted to SNOWMASS201
BIM and its impact upon project success outcomes from a Facilities Management perspective
The uptake of Building Information Modelling (BIM) has been increasing, but some of its promoted potential benefits have been slow to materialise. In particular, claims that BIM will revolutionise facilities management (FM) creating efficiencies in the whole-life of building operations have yet to be achieved on a wide scale, certainly in comparison to tangible progress made for the prior design and construction phases. To attempt to unravel the factors at play in the adoption of BIM during the operational phase, and in particular, understand if adoption by facilities managers (FMs) is lagging behind other disciplines, this study aims to understand if current BIM processes can ease the challenges in this area faced by facilities management project stakeholders. To do this, success from a facilities management viewpoint is considered and barriers to facilities management success are explored, with focused BIM use proposed as a solution to these barriers. Qualitative research was undertaken, using semi structured interviews to collect data from a non-probability sample of 7 project- and facilities- management practitioners. Key results from this study show that the main barrier to BIM adoption by facilities managers is software interoperability, with reports that facilities management systems are unable to easily import BIM data produced during the design and construction stages. Additionally, facilities managers were not treated as salient stakeholders by Project Managers, further negatively affecting facilities management project success outcomes. A µresistance to change was identified as another barrier, as facilities managers were sceptical of the ability of current BIMenabled systems promoted as being FM compatible to be able to replicate their existing Computer Aided Facility Management (CAFM) legacy software and its user required capabilities. The results of this study highlight that more work is needed to ensure that BIM benefits the end user, as there was no reported use of BIM data for dedicated facilities management purposes. Further investigation into the challenges of interoperability could add significant value to this developing research area.The uptake of Building Information Modelling (BIM) has been increasing, but some of its promoted potential benefits have been slow to materialise. In particular, claims that BIM will revolutionise facilities management (FM) creating efficiencies in the whole-life of building operations have yet to be achieved on a wide scale, certainly in comparison to tangible progress made for the prior design and construction phases. To attempt to unravel the factors at play in the adoption of BIM during the operational phase, and in particular, understand if adoption by facilities managers (FMs) is lagging behind other disciplines, this study aims to understand if current BIM processes can ease the challenges in this area faced by facilities management project stakeholders. To do this, success from a facilities management viewpoint is considered and barriers to facilities management success are explored, with focused BIM use proposed as a solution to these barriers. Qualitative research was undertaken, using semi structured interviews to collect data from a non-probability sample of 7 project- and facilities- management practitioners. Key results from this study show that the main barrier to BIM adoption by facilities managers is software interoperability, with reports that facilities management systems are unable to easily import BIM data produced during the design and construction stages. Additionally, facilities managers were not treated as salient stakeholders by Project Managers, further negatively affecting facilities management project success outcomes. A µresistance to change was identified as another barrier, as facilities managers were sceptical of the ability of current BIMenabled systems promoted as being FM compatible to be able to replicate their existing Computer Aided Facility Management (CAFM) legacy software and its user required capabilities. The results of this study highlight that more work is needed to ensure that BIM benefits the end user, as there was no reported use of BIM data for dedicated facilities management purposes. Further investigation into the challenges of interoperability could add significant value to this developing research area
The economic and environmental performance of distribution networks: A case study from the petrochemical industry
Designing a company's distribution network is a challenging task that requires the consideration of different aspects. In this respect, especially trade-offs between, for example, operational costs and customer service are the focus of the companies' attention. However,
growing concerns of governments and customers about environmental protection have raised awareness towards the environmental impact of operations. Activities associated with the distribution of products, i.e. transportation and warehousing, are not yet subject to strict
environmental regulations, but this situation is expected to change soon. Companies must, therefore, start to concentrate not only on economic but also on environmental aspects in the design of their supply chain. Based on a case study from the petrochemical industry, this paper presents a way to combine both, economic as well as environmental criteria, when evaluating (strategic) distribution network design decisions. The results show a trade-off between total (distribution) costs and transport carbon emissions. (author's abstract
- …