1,510 research outputs found

    Highly Efficient Midinfrared On-Chip Electrical Generation of Graphene Plasmons by Inelastic Electron Tunneling Excitation

    Get PDF
    Inelastic electron tunneling provides a low-energy pathway for the excitation of surface plasmons and light emission. We theoretically investigate tunnel junctions based on metals and graphene. We show that graphene is potentially a highly efficient material for tunneling excitation of plasmons because of its narrow plasmon linewidths, strong emission, and large tunability in the midinfrared wavelength regime. Compared to gold and silver, the enhancement can be up to 10 times for similar wavelengths and up to 5 orders at their respective plasmon operating wavelengths. Tunneling excitation of graphene plasmons promises an efficient technology for on-chip electrical generation and manipulation of plasmons for graphene-based optoelectronics and nanophotonic integrated circuits.Comment: 12 pages, 7 figure

    ANALISA PENJADWALAN WAKTU PEMBANGUNAN LANJUTAN SMPN 38 LOK BAHU KOTA SAMARINDA

    Get PDF
    Since 2012, students of 38 Lok Bahu Junior High School must have a place at 027 Samarinda Elementary School. This was caused by the lack of funds from the Samarinda city government. However, it seems that the students of 38 Lok Bahu Junior High School can breathe a sigh of relief, because in mid 2018 the construction of the school which had stopped would be resumed. For this reason, the contractor in the implementation must be done well. Considering the previous project, the contractor appointed as the executor of this project advanced development project experienced delays in the realization of the project. This study will analyze the scheduling of time related to the optimal duration, critical trajectories and work networks that can be made in the advanced development activities of 38 Lok Bahu Junior High School using the CPM method, PERT and using Microsoft Project software. In the CPM method, the settlement time is around 266 days, while in PERT method, it is obtained 179 days of completion (June 2 - December 8, 2018), faster than 1 day from the plan schedule. Therefore, 179 days duration can be said as the optimal duration. The completion time with CPM and PERT methods is 87 days different. This is because the duration of activities in the PERT method obtained from interviews with the foreman, the duration is shorter or relatively fast than the plan, especially in supporting concrete structure work. Based on the calculations that have been made, the probability of project completion at 179 days is around 55.19%. The critical path in this project is A (Preliminary Work) - B (Supporting Concrete Structural Work) - C (Pair of Brick and Plaster) - D (Floor Work And Ceramic Wall) - F (Roof Frame Work) - G (Cover Wood And Ceiling Works) - H (Electrical And Mechanical) - K (Other Work)

    PmoB subunit of particulate methane monooxygenase (pMMO) in Methylococcus capsulatus (Bath): The Cu^I sponge and its function

    Get PDF
    In this study, we describe efforts to clarify the role of the copper cofactors associated with subunit B (PmoB) of the particulate methane monooxygenase (pMMO) from Methylococcus capsulatus (Bath) (M. capsulatus). This subunit exhibits strong affinity toward Cu^I ions. To elucidate the high copper affinity of the subunit, the full-length PmoB, and the N-terminal truncated mutants PmoB_(33–414) and PmoB_(55–414), each fused to the maltose-binding protein (MBP), are cloned and over-expressed into Escherichia coli (E. coli) K12 TB1 cells. The Y374F, Y374S and M300L mutants of these protein constructs are also studied. When this E. coli is grown with the pmoB gene in 1.0 mM Cu^(II), it behaves like M. capsulatus (Bath) cultured under high copper stresswith abundant membrane accumulation and high CuI content. The recombinantPmoB proteins are verified by Western blotting of antibodies directed against the MBP sub-domain in each of the copper-enriched PmoB proteins. Cu K-edge X-rayabsorption near edge spectroscopy (XANES) of the copper ions confirms that all the PmoB recombinants are Cu^I proteins. All the PmoB proteins show evidence of a “dicopper site” according to analysis of the Cu extended X-ray absorption edge fine structure (EXAFS) of the membranes. No specific activities toward methane and propene oxidation are observed with the recombinant membrane-bound PmoB proteins. However, significant production of hydrogen peroxide is observed in the case of the PmoB_(33–414) mutant. Reaction of the dicopper site with dioxygenproduces hydrogen peroxide and leads to oxidation of the CuI ions residing in the C-terminal sub-domain of the PmoB subunit

    Exploring Dynamics between Instructional Designers and Higher Education Faculty: An Ethnographic Case Study

    Get PDF
    This study concentrated on individual and team traits of an instructional design team in the presence of a robust relationship between the team members and faculty at a southeast state university in U.S.A. Three exploratory themes emerged from the interpersonal dynamics observed in this qualitative inquiry: (1) expertise, (2) work motivation, and (3) team culture. Preliminary results first suggested that professionalism with a mix of task mental models, assertiveness, and proactivity be implanted in the instructional designers. Then, instructional designers’ growth and survival needs allow for active learning and continuous reflection on curriculum development and instruction delivery in the e-Learning business. Next, loose-tight leadership, collective cognition, and collegiality are rooted in the team culture as the instructional design team becomes established. Implications and recommendations were discussed in the research study

    ANALISA PENJADWALAN WAKTU PEMBANGUNAN LANJUTAN SMPN 38 LOK BAHU KOTA SAMARINDA

    Get PDF
    Since 2012, students of 38 Lok Bahu Junior High School must have a place at 027 Samarinda Elementary School. This was caused by the lack of funds from the Samarinda city government. However, it seems that the students of 38 Lok Bahu Junior High School can breathe a sigh of relief, because in mid 2018 the construction of the school which had stopped would be resumed. For this reason, the contractor in the implementation must be done well. Considering the previous project, the contractor appointed as the executor of this project advanced development project experienced delays in the realization of the project. This study will analyze the scheduling of time related to the optimal duration, critical trajectories and work networks that can be made in the advanced development activities of 38 Lok Bahu Junior High School using the CPM method, PERT and using Microsoft Project software. In the CPM method, the settlement time is around 266 days, while in PERT method, it is obtained 179 days of completion (June 2 - December 8, 2018), faster than 1 day from the plan schedule. Therefore, 179 days duration can be said as the optimal duration. The completion time with CPM and PERT methods is 87 days different. This is because the duration of activities in the PERT method obtained from interviews with the foreman, the duration is shorter or relatively fast than the plan, especially in supporting concrete structure work. Based on the calculations that have been made, the probability of project completion at 179 days is around 55.19%. The critical path in this project is A (Preliminary Work) - B (Supporting Concrete Structural Work) - C (Pair of Brick and Plaster) - D (Floor Work And Ceramic Wall) - F (Roof Frame Work) - G (Cover Wood And Ceiling Works) - H (Electrical And Mechanical) - K (Other Work)
    corecore