Skip to main content
Article thumbnail
Location of Repository

Fundamental behaviour of Virtual-Build-to-Order systems

By Philip G. Brabazon and Bart L. MacCarthy

Abstract

Virtual-Build-to-Order (VBTO) is an emerging order fulfilment system within the automotive sector that is intended to improve fulfilment performance by taking advantage of integrated information systems. The primary innovation in VBTO systems is the ability to make available all unsold products that are in the production pipeline to all customers. In a conventional system the pipeline is inaccessible and a customer can be fulfilled by a product from stock or having a product Built-to-Order (BTO), whereas in a VBTO system a customer can be fulfilled by a product from stock, by being allocated a product in the pipeline, or by a build-to-order product. Simulation is used to investigate and profile the fundamental behaviour of the basic VBTO system and to compare it to a Conventional system. A predictive relationship is identified, between the proportions of customers fulfilled through each mechanism and the ratio of product variety / pipeline length. The simulations reveal that a VBTO system exhibits inherent behaviour that alters the stock mix and levels, leading to stock levels being higher than in an equivalent conventional system at certain variety / pipeline ratios. The results have implications for the design and management of order fulfilment systems in sectors such as automotive where VBTO is a viable operational model

Publisher: Elsevier Science B.V.
Year: 2006
OAI identifier: oai:eprints.nottingham.ac.uk:526
Provided by: Nottingham ePrints

Suggested articles

Citations

  1. (2002). 3 Day Car Programme Research Survey Report: New car buyer behaviour
  2. (2002). A numerical analysis of capacitated postponement,
  3. (2004). Configuring products to address the customization-responsiveness squeeze: A survey of management issues and opportunities, doi
  4. (2004). Fast production for order fulfillment: Implementing mass customization in electronics industry, doi
  5. (2004). MacCarthy Appears in:
  6. (2004). Management of uncertainty through postponement, doi
  7. (1998). Managing Broader Product Lines through Delayed Differentiation Using Vanilla Boxes, doi
  8. (1999). Managing design of assembly sequences for product lines that delay product differentiation, doi
  9. (2003). Managing Increasing Product Variety at Integrated Steel Mills,
  10. (2005). Modelling complexity in the automotive industry supply chain, doi
  11. (2000). Simulation modeling and analysis (McGraw-Hill,
  12. (2001). The Acceleration in Product Variety,
  13. (1975). The application of GPSS V to discrete system simulation (Prentice Hall,
  14. (1994). The customization-responsiveness squeeze,
  15. (2001). The false promise of mass customization,
  16. (2001). The rediscovery of postponement: a literature review and directions for research, doi
  17. (1998). The right stuff: America's move to mass customization (Federal Reserve Bank of Dallas).
  18. (2004). Virtual-build-to-order as a Mass Customization order fulfilment model,

To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.