Shielding analysis in the design phase of the new Emergency Operation Facility for Tihange Nuclear Power Plant

Abstract

In the framework of the design studies for a new Emergency Operation Facility (EOF) for Tihange NPP, radiation protection analyses are needed to comply with effective dose rate criteria. In this aim, the shielding performed by, at the one hand, external walls and roof of the building and, on the other hand, internal walls, has been sized by means of MicroShield calculations. This paper explains how the calculations for external walls, doors, roof, floor and internal walls are made. The assumptions on the source terms and on the source geometry as well as the way the shielding is determined and the results of the sizing are presented

Similar works

Full text

thumbnail-image

Directory of Open Access Journals

redirect
Last time updated on 12/10/2017

This paper was published in Directory of Open Access Journals.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.